2nd Test Flashcards

(55 cards)

1
Q

Whats another name for constructionn surveys

A

Engineering surveys

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What is a topographic survey

A

3D map

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Route surveys consist of what

A

Railways, highways, pipelines, powerlines

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

2 types of special surveys

A

Control (more precise)

Hydrographic

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What is the survey term “elevation”

A

Vertices distance above or below established hieght on earth’s surface at sea level or 100’ known as benchmark

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Who’s responsibility is it to provide baselines and benchmarks to layout work

A

Government

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What is clearing and grubbing

A

Process of removing vegetation

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What are preclearing / grabbing activities

A

Verify permits and right aways,
Review schedule of ops
Check cutoff elevations

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Trees with wounds of how big need to be treated woth wound paint

A

1 1/2”

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What governs works item safety

A

Opnavinstr 5100.23

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Demolition inspection falls under what subpart in 29cfr

A

Subpart T

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

What angle of Chutes need to be enclosed

A

45°

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

For holes in floor what decisions for barricades

A

Not less than 42” high
Not less than 6’ back from hole

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Barrow pit

A

Where and excavation forms a pit which material from will be used somewhere else

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

How deep is top soil

A

4-6”

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

What shoukd you never use under footings to correct over excavation

A

Fill

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

Who can approve modifications to established elevation

A

Contracting officer in writing

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

When is compaction at its best

A

A given compaction has optimal moisture content at which Max Dry Density (MDD) IS GREATEST and compaction is best

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q

Whats another name for sand displacement test

A

Sand cone test

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
20
Q

What does the water displacement test do

A

Determines dry density

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
21
Q

Whats is a lateral sewer

A

Connects house to branch or other sewer and has no common tributary

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
22
Q

What size pipe is house sewer

A

4-6” pipe

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
23
Q

Hoe far from building is house sewer

24
Q

Another name for pumping station

25
Batter boards distance
25-50'
26
Sanitary sewer mist be how far from water service line
Not less than 5' below water line
27
When installing sewers and drains you must
Start on lower end and work uphill Bell ends must fave uphill
28
All sewer lines need to be _____
Slooped
29
Manholes distance
No greater than 400' intervals for 8" pipe and larger
30
Two types of sewer leakage
Exfil and infil
31
Another name for leakage test
Static test
32
Air tes trust have what PSI and for gow long
5 psi for 15 mins
33
Deflection / deformation test must have what percentage of ID pulled through
95%
34
What is type k copper
Green band High pressure
35
What is type L copper
Blue band Interior plumbing and heating
36
What is type m copper
Red band Low pressure
37
Water lines should be how far below finished grade and frost line
12" finished 6" frost
38
When are thrust blocks required
Bends deflecting 22.5 or more degrees
39
Disinfection values of chlorine
3' FPS 50 PPM CHLORINE REMAIN IN SYSTEM FOR 24-48 HOURS
40
Whats is the most common method to join plastic pipes
Primer and cement
41
Ways to join plastic pipes
Solvent welding Fusion Fillet Threading ( only schedule 80 or greater
42
Heating lines above ground have what on them
Insulation and jacket
43
Heating (steam) lines below ground have what
Conduit and utilidor system
44
What is stabilization
Blending and mixing materials with soil to improve strength and durability
45
What happens when quality of soil layer increases
Ability to distribute a load increases
46
Two types of soil additives
Chemiclw and bituminous
47
Portland cenent shoukd have PI of what
Less than 30
48
What is fly ash
Mixed with lime Corse amd medium course
49
What is pick amd click test must Pentwater how deep
1/8 to 1/4"
50
Subpart A in Cfr
Osha has right to enter
51
Subpart b cfr
General interps
52
Subpart c CFR
Can't work in hazardous Employers responsisibulty to fix
53
Those type of asphalt prep is applied to base of surface
Prime coat
54
The structure function of pavement is that is that it spreads wheel weight to what
Foundation
55
This type of Portland cement is used in concrete pavement when high strengths are needed very early in operation
Type 3