Cash Van Ness Flashcards
The following is accurate information on age and capacity data (national averages).
Exterior condenser/compressor units typically last about 10 years, air-source heat pumps last about 8-10 years, and geothermal heat pump equipment 10-15 years.
Exterior condenser/compressor units typically last about 15 years, air-source heat pumps last about 12-14 years, and geothermal heat pump equipment 20-25 years.
Exterior condenser/compressor units typically last about 10 years, air-source heat pumps last about 12-14 years, and geothermal heat pump equipment 10-15 years.
Exterior condenser/compressor units typically last about 15 years, air-source heat pumps last about 8-10 years, and geothermal heat pump equipment 10-15 years.
Exterior condenser/compressor units typically last about 10 years, air-source heat pumps last about 8-10 years, and geothermal heat pump equipment 20-25 years.
Exterior condenser/compressor units typically last about 15 years, air-source heat pumps last about 12-14 years, and geothermal heat pump equipment 20-25 years.
Which of the following is not an appropriate action when a line-set is frozen in an A/C unit you are inspecting?
The unit should be turned off immediately.
It is not appropriate for you to share this information with any real estate agents.
If they are not at home, leave a note.
Suggest that the client get the equipment serviced before it fails.
Ask the client for permission to talk to the current owner about this.
It is not appropriate for you to share this information with any real estate agents.
A single-wall vent connector at the furnace needs at least
Six inches of clearance from combustibles.
Eight inches of clearance from combustibles.
Ten inches of clearance from combustibles.
Twelve inches of clearance from combustibles.
Eighteen inches of clearance from combustibles.
A single-wall vent connector at the furnace needs at least
Six inches of clearance from combustibles.
When you arrive at the home, the unit is off. What is the minimum amount of time the unit should operate before testing temperature drop?
5-10 minutes
10-15 minutes
15-20 minutes
30 minutes
60 minutes
5-10 minutes
The 2-inch diameter of ductwork in a hi-V system typically needs a minimum length of ________ and a maximum length of ________. It needs to be at least ________ long to act as a muffler.
3 feet, 15 feet, 3 feet
4 feet 20 feet, 4 feet
5 feet, 25 feet, 5 feet
6 feet, 30 feet, 6 feet
7 feet, 35 feet, 7 feet
6 feet, 30 feet, 6 feet
When inspecting a heat pump which of the following is NOT a concern?
The owner uses the emergency heat setting instead of running the heat pump.
The heat pump is installed on the rooftop.
The heat pump is located directly below a roof ridge.
The heat pump is underneath the drip line of the gutters.
The heat pump is protected from prevailing winds.
The owner uses the emergency heat setting instead of running the heat pump.
An unrestricted heat pump unit can still provide some heat down to _______ below 0.
10 degrees
15 degrees
20 degrees
25 degrees
30 degrees
10 degrees
Life expectancy of a geothermal unit is approximately _____
10-15 years
15-20 years
20-25 years
25-30 years
30+ years
20-25 years
The maximum supply air temperature from a geothermal system in healing mode is about 125 degrees, but more typically, it operates at somewhere between _________ and _______ degrees.
70 and 85
75 and 80
80 and 85
85 and 95
95 and 100
85 and 95
A service lateral must be protected by either a metal conduit or a schedule _____ to a depth of ____below grade.
60 RNC, 12 inches
60 RNC, 18 inches
70 RNC, 12 inches
80 RNC, 18 inches
80 RNC, 2 feet
80 RNC, 18 inches
In front of any panel or disconnect, there needs to be _____ clear minimum measured from the outer cover of the panel and ____ clear space side to side for the panel.
42 and 36
40 and 34
36 and 30
30 and 24
24 and 18
36 and 30
On average, a silicon-based photovoltaic cell produces about ____ at half volt and ___ amps.
5 watts, 10 amps
5 watts, 15 amps
10 watts, 15 amps
10 watts, 20 amps
15 watts, 20 amps
5 watts, 10 amps
Based on the National Fire Protection Association (NFPA), using what they tell us is unconfined space, calculate the required minimum cubic feet for a 100,000 BTU furnace with a 34,000 BTU water heater right next to it.
5,700 cubic feet
6,700 cubic feet
7,600 cubic feet
8,600 cubic feet
8,700 cubic feet
6,700 cubic feet (
When performing a visual check of gauges for a circulated boiler, the pressure on the gauge should read about _____ at room temperature.
6 pounds
8 pounds
10 pounds
12 pounds
14 pounds
12 pounds
When inspecting hot steam boilers for basic operation sequences, it is recommended to let the heating equipment operate for at least ____
5 minutes
10 minutes
12 minutes
15 minutes
15+ minutes
5 minutes
Unlisted, meaning older wood stoves, need at least _____ of clearance to combustibles, even with the best clearance reduction systems as specified by NFPA 211.
6 inches
10 inches
12 inches
15 inches
18 inches
12 inches
Which of the following plumbing supply piping is for radiant heat only?
Chlorinated Polyvinyl chloride (CPVC)
Chlorinated chloride (PC)
Polybutylene (PB)
Cross-linked polyethylene (PEX)
HePEX
HePEX
For tankless water heaters, NFPA 54 requires two openings with ______ net free area of air per 1,000 btu/hr of gas input.
½ inch
1 inch
1 ½ inch
2 inches
3 inches
1 inch
Steel plate protection is required in a wall if the pipping is less than _____ from the face of framing.
½ inch
¾ inch
1 inch
1 ½ inch
2 inches
1 inch
When inspecting crawl spaces in a home and identifying rotted wood or materials, do not use the word rot. The correct terminology for your report is _______.
Deteriorated wood or materials (DWM)
Decomposed wood or materials (DCWM)
Eroded wood or materials (EWM)
Wood destroying organisms (WDO)
Wood damaged or decayed (WDD)
Wood destroying organisms (WDO)