1
Q

predesign phase

A

usually requires 25% of the total project time

2
Q

needs analysis

A

assessment

3
Q

feasibility study

A

conducted to determine costs, facility location, programs of interest to each athletic group, and projected usage

4
Q

design phase

A

may require about 10% of the total project time

5
Q

construction phase

A

takes up the greatest percentage of the project time

6
Q

preoperation phase

A

requires about 15% of the total project time; focuses on staffing considerations

7
Q

safety space cushion

A

36in to allow sufficient room between the bar tips of adjacent stations

8
Q

olympic standards

A

portable and adjustable walk-in racks

9
Q

staff-to-athlete ratios

A

1:10 middle school, 1:15 high school, 1:20 after high school

10
Q

risk management

A

the employment of strategies to decrease and control the risk of injury from athletic participation and therefore the risk of liability exposure

11
Q

liability

A

a legal responsibility, duty, or obligation

12
Q

standard of care

A

what a reasonable and prudent person would do under similar circumstances

13
Q

negligence

A

failure to act as a reasonable and prudent person would under similar circumstances

14
Q

assumption of risk

A

knowing that an inherent risk exists with participation in an activity and voluntarily deciding to participate anyway

15
Q

scope of practice

A

proper legal parameters and professional duties

16
Q

statute of limitations

A

the time during which individuals can file a lawsuit