What does balance of systems (BOS) refer to in a PV system?
Non major components required to complete a PV system
What are concentrating and reflecting solar methods used for
Solar cooking
Who was the first to invent and use PV cells as an energy source?
Bell Laboratories
What association trains and certifies solar professionals?
NABCEP
What percentage of total installed PV power in 2009 was the U.S. responsible for?
7%
What does an integrator do in the PV industry?
Designs the PV system
Builds and puts together the PV system components
Installs the PV system on the roof
What is an advantage to photovoltaic systems
Less cost for remote locations
What type of radiation can a flat plat collector absorb
Direct and diffuse
What is a disadvantage to photovoltaic systems
Lack of knowledge
What is an example of solar energy technology
Solar cooking
What information is found on a sun path chart
Solar altitude
Solar azimuth
The solar irradiation received at a place over a particular time is
Insolation
What is solar time measured by
From solar noon too solar noon
What is the area of sky between the sun paths of summer and winter solstices
The solar window
What is earths orbital position when we have equal length days and nights?
Equinox
Which angle for an array is affected by the solar altitude
Array tilt
Solar radiation can be measured by which instruments?
Pyranometer
What is usually the best tilt angle of a PV collector in your area
Local latitude
The hours required for a days total solar irradiation to accumulate at peak sun conditions
Peak sun hours
What is the generally accepted measurement of peak sun power?
1000 W/m2
What are some things a utility might require to connect to their system
Interconnection agreements
Interconnection policies
Which on-line tool does NREL provide for estimating the performance of a PV system
PV watts
Shading can have what effect on a PV modules energy output?
Reduction in output disproportionate to the array area shaded
What codes should you be aware of for your project
Building codes: IRC, IBC
NEC
Municipal codes: AHJ