What is the maximum LPI flow rate from the BWST?

A

<3300 gpm

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What is the maximum LPI flow rate from the RB Sump?

A

<3000 gpm

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What is the maximum LPI flow rate with DH-V-38A/B OPEN?

A

2800 gpm

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What is the maximum LPI flow rate with RC-V-4 OPEN?

A

2700 gpm

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What is the LPI flow limit if ECCS sump level is below RB flood level?

A

<1500 gpm

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What is the maximum temperature for DHP pump bearings?

A

180°F

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What is the maximum temperature for DHP motor bearings?

A

190°F

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What is the maximum temperature for the DHP motor stator?

A

130°C

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What powers DH-V-1/2/3 valves?

A

1C ESV MCC

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What interlock prevents DH-V-1/2 from opening above 400#?

A

Prevents piping overpressurization

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

When should DH-V-6A/B be opened?

A

When BWST is at 9.5’

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

When should DH-V-5A/B be closed?

A

When BWST is at 6.33’ or RB >56”

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

What valves are used to throttle LPI flow to minimize disc wear?

A

DH-V-19A/B globe valves

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Which valve is locked OPEN post-LOCA for boron precipitation?

A

DH-V-12B

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

What is the preferred boron precipitation mitigation method within 24 hours?

A

Drain RCS through drop line to DH-P-1B (aligned to sump) with return via CF/LPI nozzles

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

What is the secondary boron precipitation mitigation method after 5+ days?

A

Inject RB sump through Pzr Aux Spray line via DH-V-64

17
Q

What are the indications of DHP pump vortexing?

A

Oscillating motor current, pump discharge pressure, discharge flow, noise/vibration.

18
Q

What action should be taken if DHP pump vortexing is observed?

A

Increase level and place DHP in PTL.

19
Q

What is the piggyback procedure if BWST is <15’ and LPI flow is <1250gpm in each line?

A

OPEN DH-V-7A/B, keep MU-V-14s OPEN (checks seated) for alternate MUP source if DHP trips.

20
Q

What is the LCO if one BWST level transmitter is OOS?

21
Q

What should be done if DHP cavitation is observed during sump recirculation (Guide 22)?

A

Throttle LPI to minimum (>1250 gpm), do NOT place DHP in PTL, and shutdown both BS trains.

22
Q

How long can DHPs operate on minimum recirculation without cooling?

A

No more than 10 minutes.

23
Q

At what level do BWST heaters have a low-level cutoff?

24
Q

What is the restriction for BWST heaters when the level is <3’?

A

Do NOT allow heaters to energize.

25
What is the allowable delay for missing surveillance?
Up to 24 hours or the surveillance frequency, with a risk evaluation performed.
26
Can Decay River pumps be removed from service if the outage just started with 20.5’ FTC level and EFW is INOP?
No, because the plant is not in refueling shutdown with >23 ft refueling canal level.