February Study Session Flashcards

(27 cards)

1
Q

What are peak hours?

A

0700 - 2200

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What are spinning reserves?

A

Generator is already online and not fully loaded.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What are non-spinning reserves?

A

Generators that are offline that can come on within 10 minutes.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

How long do you have to recover from a DCS event?

A

15 minutes

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Can you count firm load as a reserve?

A

You can, but you’d only count it as an operating reserve during an EEA 3 condition.

If you do count it, you count it as non spinning reserves.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Can interruptible load be counted as a reserve?

A

Yes, but only in an EEA 2 situation. Usually takes about half an hour to implement though.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What are the three operating modes for AGC?

A

Tie line bias
Flat frequency
Flat tie line

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

When should the AGC be in Flat Frequency

A

When you are islanded.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

When should you use Flat Tie Line?

A

When you don’t have a frequency source.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What piece of equipment is giving you a frequency reading at a power plant?

A

Potential Transformers

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

What is CPS 1 requirement?

A

100 or more.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

What is BAAL compliance?

A

It is the boundary of your BAAL threshold. I can not exceed BAAL over 30 consecutive minutes.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Is under frequency load shedding required to be coordinated?

A

Yes, coordinate with the RC.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What equipment is most likely to be damaged during low frequency?

A

Generators

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Impedance based relay systems like Zone 1 or Zone 2, how far does Zone 1 reach and is there a time delay?

A

80%, no time delay

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Impedance based relay systems like Zone 1 or Zone 2, how far does Zone 2 reach and is there a time delay?

A

100%-120%, time delay

17
Q

Difference between static and dynamic devices?

A

Static: devices that are switchable (eg. reactors and capacitors

Dynamic: anything that is immediately responsive to changes in voltage (eg. synchronous condensers, static var compensators, generators that have automatic voltage regulators)

18
Q

Ohm’s Law

A

V=IR

V = Voltage
I = Current
R = Resistance

19
Q

What’s the difference between an SOL and IROL?

A

SOL: System Operating Limit; defined for all equipment on a system. Established by TO

IROL: Interconnection Reliability Operating Limits; A system operating limit that if it should occur, could cause voltage collapse or cascading outages on adjacent systems. Established by RC.

20
Q

How long do you have to get within IROL?

21
Q

Where do you typically see line reactors and why?

A

High voltage lines; Ferrani Voltage Rise

Transmission lines naturally have inductive reactants, capacitive reactants and resistance.

Needs a switchable reactive device to help.

22
Q

What are phase shifting transformers for?

A

Controlling power flow

23
Q

What is RCIS?

A

Reliability Coordinator Information System

24
Q

What is the State Estimator?

A

Mathematical calculation of what your power system is doing. Used in RTCA (Real Time Contingency Analysis)

25
How often does the State Estimator have to run?
Once every 30 minutes. (Usually runs every 3-5 minutes but the requirement is once every 30 minutes)
26
How often do you have to train on your restoration plan?
Once a year or whenever it changes.
27
Who approves the restoration plan?
The RC.