1

What are two things to take in to consideration while using either the installed or the portable educator?

- Asphyxiation
- Inadvertent flooding

2

When is a mandatory safety and security occupational health briefing required?

Prior to the cutter entering shipyard or commercial dockside

3

The unit Electrical Safety Officer shall be designated in writing by who?

Me the OIC

4

How many copies of the CCOL's should you have on board?

3
- Master copy
- Spare copy
- A copy posted in each compartment and weather deck

5

What units are required to maintain a Engineering Casualty Control Manual?

All cutters 65' or larger

6

Who is responsible in maintaining the Engineering Casualty Control Manual?

My EPO

7

What is the purpose of the Engineering Casualty Control Manual?

The purpose of the manual is to establish methods of operating all vital systems and corrective actions to be taken if casualties occur

8

How many chapters are in the Engineering Casualty Control Manual?

It consists of four chapters
- Machine Readiness
- Engineering Casualties
- General Emergencies
- DC Casualties

9

What is the Restricted Maneuvering Doctrine?

It is a written agreement between me and my EPO regarding the level of casualty control initial action to be taken during periods of restricted maneuverability

10

What is the requirements for smoke detectors on a ship?

1 smoke detector for every 10 people per berthing area and at a minimum 1 shall be located in each passageway that serves a living or berthing area

11

What vessels are required to have Stability and Loading Data Booklets?

They are required on all cutters 65' or larger that are not required to maintain DC Books

12

What status boards are required to be maintained in DCC?

- Casualty Board
- Stability Board
- Graphic display of damage sustained and corrective action taken for all DC systems
- Graphic display for all electrical and casualty power circuits
- Plans showing location and operation of all magazine flooding and sprinkling systems
- ECC Status Board

13

How many DCPO's are required on a 87' WPB?

On units smaller than 160' your required to have assigned 1-2 DCPO's

14

Who is in charge of the DCPO program?

The XPO shall approve all DCPO's and their replacements and schedule the rotation dates of DCPO duties which are not to exceed 12 months. The DCPO's shall be designated in writing.

15

Where shall the Engineering Casualty Control Manual be kept onboard the cutter?

Shall be kept in main control, engineering assist location, all repair lockers, DCC and pilot house

16

What vessels are required to have a repair party manual?

Required on all cutters 65' or larger

17

What vessels shall maintain a in-op fitting log?

Required on all cutters

18

What type of funding is AFC-45?

Naval Engineering

19

What type of funding is AFC-42?

Electronic equipment maintenance

20

What type of funding is AFC-30?

Operational

21

What is BI Level maintenance?

- Organizational level maintenance
- Depot level maintenance

22

What are the types of maintenance?

- Corrective
- Alternative
- Preventative

23

CASREPS, CSMP and CMA are what type of maintenance?

Corrective

24

A TCTO is what kind of maintenance?

Alternative

25

A CMP is what kind of maintenance?

Preventative

25

Who certify's the Gas Free Engineer?

I do the OIC

26

The Gas Free Engineer shall recertify when?

In writing annually

27

What does IDLH stand for?

Immediately Dangerous to Life and Health

28

Who shall be designated as a Gas Free Engineer?

E-6 or above, EPO or CG Officer

29

What are the three distinct characteristics of a confined space?

1. Is large enough and so configured that an employee can bodily enter and perform assigned work
2. Has limited or restricted means of entry or exit
3. Is not designed for continuous employee occupancy