MISSED QUESTIONS 2 Flashcards Preview

Undeleted > MISSED QUESTIONS 2 > Flashcards

Flashcards in MISSED QUESTIONS 2 Deck (316)
Loading flashcards...
1

TRUE/FALSE

AT AN OLT ROWFRAME TYPE BUILDING THE OVM OF THE 1ST DUE TOWER LADDER MUST WAIT FOR COMPLETION OF ROOF SIZE UP BEFORE REPOSITIONING THE BASKET TO THE FIRE FLOOR FOR VENTILATION.

TRUE

2

WHAT DOES ONE SLAP ON THE BACK OF THE OPERATOR OF A POWER SAW MEAN?

STOP THE CUT

3

WHAT DOES TWO SLAPS ON THE BACK OF THE OPERATOR OF A POWER SAW MEAN?

CUT

4

AT A TAXPAYER FIRE, THE YIELD STRENGTH OF STEEL I-BEAMS DROPS DRAMATICALLY AND THEY START TO SOFTEN AND FAIL WHEN THESE BEAMS ARE HEATED FROM?

1000 DEGREES TO 1500 DEGREES FAREINHEIT

THIS TEMPERATURE CAN BE REACHED IN 5 TO 10 MINS AT A FIRE

5

WHAT IS THE PROPER WAY OF ENTERING A BUILDING INFORMATION FOR CIDS?

EXAMPLE:

MD 6STY 100X100 CL3

6

WHAT IS THE CIRCLE OF DANGER IN CHAINSAW OPERATIONS?

RADIUS OF AT LEAST 10 FEET

7

WHAT IS THE CIRCLE OF DANGER IN POWER SAW OPERATIONS?

AS NEAR AS POSSIBLE AND PRACTICAL, A 20 FOOT RADIUS CIRCLE OF DANGER

8

IF YOU WANT TO REMOVE A FACILITY FROM THE CFR-D RESPONSE MATRIX, WHAT CRITERIA MUST THE FACILITY ENSURE?

DOC

DEFIB
O2
CPR TRAINED PERSONNEL DURING ALL HOURS OF OPERATION

9

WHAT IS THE TOWER LADDER RELIEF VALVE SET AT?

250 PSI

10

WHAT ARE THE FACTORS THAT INFLUENCE THE SEVERITY OF A BACKDRAFT?

TYPES OF GASES, THEIR TEMPERATURE, PRESSURE AND MAKE UP
SIZE AND LOCATION OF AREAS INVOLVED
TYPE AND SIZE OF OPENINGS MADE BY THE FIRE DEPT
PROXIMITY OF OPENINGS IN RELATION TO THE FIRE
AMOUNT OF TURBULENCE IN THE BLDG CAUSED BY THE DIRECTION AND VELOCITY OF THE WIND AND HOSE STREAMS DIRECTED INTO THE BLDG.

10

WHAT ARE THE FACTORS THAT INFLUENCE THE SEVERITY OF A BACKDRAFT?

TYPES OF GASES, THEIR TEMPERATURE, PRESSURE AND MAKE UP
SIZE AND LOCATION OF AREAS INVOLVED
TYPE AND SIZE OF OPENINGS MADE BY THE FIRE DEPT
PROXIMITY OF OPENINGS IN RELATION TO THE FIRE
AMOUNT OF TURBULENCE IN THE BLDG CAUSED BY THE DIRECTION AND VELOCITY OF THE WIND AND HOSE STREAMS DIRECTED INTO THE BLDG.

11

WHAT IS THE TOOL ASSIGNMENT FOR THE 2ND DUE ROOF MAN AT A HRFPMD?

HALLIGAN
MAUL
LSR

12

WHEN EXITING A WINDOW USING YOUR PSS SYSTEM, WHAT CORRECT POSITION OF YOUR FEET?

TOES AGAINST THE WALL WITH FEET SHOULDER WIDTH APART

13

WHEN OPERATING A PARTNER SAW WHAT IS THE CORRECT POSITIONING OF YOU FEET/STANCE?

BOXER'S STANCE FEET 18 TO 20 INCHES APART

14

WHEN PERFORMING THE LSR EVOLUTION, WHAT IS THE CORRECT POSITIONING OF THE MEMBER BEING LOWERED FEET?

TOES AGAINST THE WALL 12 INCHES APART

15

AT A HIGH RISE OFFICE WHICH COMPANY PICKS THE ATTACK STAIR?

1ST DUE LADDER PICKS ATTACK STAIR IN HIGH RISE OFFICER WITH A STANDPIPE

16

AT A HIGH RISE OFFICER WHICH COMPANY PICS THE EVACUATION STAIR?

3RD DUE TRUCK PICKS THE EVACUATION STAIR IN HIGH RISE OFFICE BUILDINGS

17

AT HIGH RISE OFFICE BUILDING, THE 3RD DUE TRUCK IS RESPONSIBLE FOR REMOVING ALL OCCUPANTS FROM THE ATTACK STAIRWELL. IF DIFFICULTY IS ENCOUNTERED IN CLEARING THE ATTACK STAIRWAY OF OCCUPANTS, WHO SHALL THE OFFICER ADVISE TO WITHHOLD THE ATTACK?

FIRE SECTOR SUPERVISOR/FIRE BRANCH DIRECTOR

1ST DUE LADDER OFFICER

18

HOW MANY PEOPLE WILL 1 LENGTH OF 2 1/2" HOSE APPROXIMATELY HOLD?

10 PEOPLE

19

IF YOU ARE CALLED TO RESPOND TO A 10-60 AND WHEN LOOKING AT THE RESPONSE TICKET YOU SEE A "C" BEHIND YOUR LADDER COMPANY'S NUMBER I.E. L136C. WHAT DOES THIS "C" MEAN?

CPC UNIT

++LADDERS WITH "C" AFTER NUMBERS ARE DESIGNATED CPC UNITS++

20

LOOKING AT A RESPONSE TICKET YOU SEE E287C. YOU KNOW THAT THE "C" FOR THIS ENGINE MEANS?

CFR-D COMPANY

++ENGINES WITH "C" AFTER NUMBERS ARE DESIGNATED CFR-D COMPANIES++

20

LOOKING AT A RESPONSE TICKET YOU SEE E287C. YOU KNOW THAT THE "C" FOR THIS ENGINE MEANS?

CFR-D COMPANY

++ENGINES WITH "C" AFTER NUMBERS ARE DESIGNATED CFR-D COMPANIES++

21

THE LETTER "D" BEHIND A LADDER COMPANY'S NUMBER ON A RESPONSE TICKET WOULD MEAN? (I.E: L138D)

TECH DECON TASK FORCE LADDER

22

ACCORDING TO LOFTS, STEEL TENSION CABLES OR RODS (STARS) CAN FAIL AT A MINIMUM OF?

800 DEGREES FAHRENHEIT

23

WHAT IS THE MAXIMUM EXTENSION OF A REAR MOUNT AERIAL LADDER WITH A 1 1/2" TIP BEING USED AS A WATER TOWER?

MAX. EXTENSION OF AN REARMOUNT AERIAL LADDER WITH 1 1/2" TIP IS 80 FEET WITH A MAX. PRESSURE OF 90 PSI FOR A SOLID STREAM NOZZLE

24

THE 1ST DUE ENGINE TO A CONFIRMED CHEMICAL ATTACK IN A SUBWAY WILL REPORT ANY VICTIM COLLAPSING ON THEIR WAY FROM TEH SUBWAY EXIT TO THE GROSS DECON AREA, TO WHO?

2ND ARRIVING LADDER

I.C.

25

WHAT DOES CHECKERING INDICATE?

CHECKERING OF GLASS (HALF MOON EFFECTS OR MARKS) USUALLY RESULTS FROM WATER BEING APPLIED TO HEATED GLASS. THIS INDICATES THE WINDOW WAS STILL IN PLACE WHEN THE FF OPERATED AT THE FIRE.

26

AT LOW RISE MULTIPLE DWELLINGS WHEN CAN ENGINE COMPANIES STRETCH 1 3/4" LINE

WHEN EVERY APT DOOR IS WITHIN 50' OF EVERY STAIRWAY ON THAT FLOOR WHEN COMPATIBLE WITH FIRE CONDITIONS

27

WHAT IS THE PREFERRED LADDER WHEN USING A PORTABLE IN A TOWER LADDER BASKET?

20 FT COMBINATION LADDER

28

YOU ARRIVE FIRST DUE FOR A FIRE IN A FULLY INVOLVED 4 STORY OCCUPIED ROW FRAME WITH FIRE QUICKLY EXTENDING INTO BOTH EXPOSURES 2 AND 4. WHAT ACTIONS SHOULD YOUR ENGINE, THE 1ST ENGINE ON SCENE TAKE?

STRETCH A 3 1/2" HOSELINE TO SUPPLY A TOWER LADDER

STRETCH A 1 3/4" HANDLINE INTO THE FIRE BUILDING THROUGH THE FRONT DOOR

Decks in Undeleted Class (130):