• A Primary Coolant Pump trip has caused a reactor trip at 100% power.
• All systems functioned as designed upon the reactor trip.
Immediately following the reactor trip, what is the position of the following valves?
ADV / TBV / Code Safeties
A. closed open open
B. open closed closed
C. closed closed open
D. open open closed
D. open open closed
• A Primary Coolant Pump trip has caused a reactor trip at 100% power..
• All systems functioned as designed upon the reactor trip.
• During EOP 1.0, CV-0501 and CV-0510, Main Steam Isolation Valves, were
inadvertently closed.
• MO-0501 and MO-0510, Main Steam Isolation Valve Bypass valves are closed.
Which of the following conditions describes the ACTUAL PCS heat removal
mechanism following completion of EOP 1.0 actions?
ADVs
A. Open and removing heat
B. Open and removing heat
C. Open but not removing heat
D. Open but not removing heat
Turbine Bypass Valve Open but not removing heat Open and removing heat Open and removing heat Open but not removing heat
ADVs
A. Open and removing heat
Turbine Bypass Valve
Open but not removing heat
Given the following plant conditions:
• The plant is in MODE 3 following a reactor trip from 100% power.
• PCS temperature is being controlled with the Turbine Bypass Valve in AUTO.
• The Atmospheric Steam Dumps are closed with the Steam Dump Controller,
HIC-0780A, in AUTO.
• The Average Temperature Display Select Switch is in the LOOP 2 position.
Which of the following describes the effect of a loss of the Tave signal from TYT -0200
(e.g., signal failed LOW) on the plant. (Assume NO operator action has been taken.)
A. The only means of PCS heat removal with the secondary plant is via the Main
Steam Code Safety valves.
B. The Turbine Bypass Valve fails closed and will NOT open until the Average
Temperature Display Select Switch is placed in LOOP 1 position.
C. The Turbine Bypass Valve fails closed and will NOT open. the ADVs will open on a
quick open signal.
D. The TBV will modulate open/closed to maintain S/G pressures at setpoint. The
ADVs will NOT modulate open.
D. The TBV will modulate open/closed to maintain S/G pressures at setpoint. The
ADVs will NOT modulate open.
Given the following plant conditions:
• The plant is in the process of shutting down.
• The crew is using the Atmospheric Dump Valves (ADVs) and Turbine Bypass
Valve (TBV) for heat removal.
• The NCO-R is using the ADV controller HIC-0780A in Manual.
• The NCO- T observes the Turbine Bypass Valve indicates open, but that Turbine
Bypass Valve Controller PIC-0511 output meter indicates NO output signal.
• Main Condenser vacuum is 15” and slowly lowering.
• Instrument Air pressure is 95 psig and stable.
Which one of the following accounts for these conditions, and what action, if any, is
required?
A. ADV controllers at Panel C-33 (HIC-0780B/0781 B) are in Manual. They should be
restored to Auto.
B. ADV controllers at Panel C-33 (HIC-0780B/0781 B) are in Auto. They should be
placed to Manual.
C. PIC-0511 is malfunctioning and should be reported to I&C for troubleshooting.
D. These conditions are normal per equipment design; no action is necessary.
D. These conditions are normal per equipment design; no action is necessary.
Given the following conditions:
- The plant is in MODE 3 following a reactor trip from 100% power.
PCS temperature is being controlled with the Turbine Bypass Valve in AUTO
- The Atmospheric Steam Dumps are closed with the control room C-02 panel
Steam Dump Controller, HIC-0780A in AUTO
- The Average Temperature Display Select Switch is in the LOOP 2 position
Which of the following describes the effect of a loss of the Tave signal from TYT-0200
(e.g., signal failed LOW) on the plant. (Assume NO operator action has been taken.)
A. The only means of PCS heat removal with the secondary plant is via the Main
Steam Code Safety valves.
B. The Turbine Bypass Valve fails closed and will NOT open until the Average
Temperature Display Select Switch is placed in LOOP 1 position.
C. The Turbine Bypass Valve fails closed and will NOT open. The ADVs will open on
a quick open signal.
D. The TBV will modulate open/closed to maintain S/G pressures at setpoint. The
ADVs will NOT modulate open.
D. The TBV will modulate open/closed to maintain S/G pressures at setpoint. The
ADVs will NOT modulate open.
CORRECT - The Turbine Bypass Valve controls on either the dump control
error signal OR main steam pressure signal, whichever is highest; therefore
TBV operation for these conditions is relatively unaffected. For the ADVs,
losing the Tave signal disables auto operation of the ADVs.
Given the following conditions:
- The plant is in MODE 3 following a reactor trip from 100% power.
PCS temperature is being controlled with the Turbine Bypass Valve in AUTO
- The Atmospheric Steam Dumps are closed with the control room C-02 panel
Steam Dump Controller, HIC-0780A in AUTO
- The Average Temperature Display Select Switch is in the LOOP 2 position
Which of the following describes the effect of a loss of the Tave signal from TYT-0200
(e.g., signal failed LOW) on the plant. (Assume NO operator action has been taken.)
A. The only means of PCS heat removal with the secondary plant is via the Main
Steam Code Safety valves.
B. The Turbine Bypass Valve fails closed and will NOT open until the Average
Temperature Display Select Switch is placed in LOOP 1 position.
C. The Turbine Bypass Valve fails closed and will NOT open. The ADVs will open on
a quick open signal.
D. The TBV will modulate open/closed to maintain S/G pressures at setpoint. The
ADVs will NOT modulate open.
D. The TBV will modulate open/closed to maintain S/G pressures at setpoint. The
ADVs will NOT modulate open.
CORRECT - The Turbine Bypass Valve controls on either the dump control
error signal OR main steam pressure signal, whichever is highest; therefore
TBV operation for these conditions is relatively unaffected. For the ADVs,
losing the Tave signal disables auto operation of the ADVs.
Given the following: • A Primary Coolant Pump trip has caused a reactor trip at 100% power. • Preferred AC Bus Y-10 de-energized at time of reactor trip • All systems functioned as designed upon the reactor trip. Immediately following the reactor trip, what is the position of the following valves? ADVs A. Closed B. Open C. Closed D. Open TBV Open Closed Closed Open S/G Code Safeties Open Closed Open Closed
ADVs
A. Closed
TBV
Open
S/G Code Safeties
Open
Loss of Y-10 = no ADVs.
- A plant shutdown is in progress.
- P-8B, Auxiliary Feedpump is in service providing. feed to the S/Gs.
- The Turbine Bypass Valve is maintaining S/G pressure at approximately 900#
- A malfunction has caused both CV-0501 and CV-0510, Main Steam Isolation
Valves to close. - Neither MO-0501 and MO-0510, Main Steam Isolation Valve Bypass valves, have
been opened. - Assuming no Operator action, what is the status of PCS heat removal?
AFW Status / PCS Heat Removal via
A. P-8B in service / TBV
B. P-8A in service / Code Safeties
C. P-8B in service / ADV
D. P-8A in service / ADV
C. P-8B in service / ADV
• Plant has tripped from 100% power.
• Both CV-0501 and CV-0510, Main Steam Isolation Valves, were closed during
EOP 1.0 actions.
• Both MO-0510 and MO-0501, Main Steam Isolation Valve Bypass Valves are
closed.
Assuming plant systems are responding as expected to the above conditions, PCS
temperature is being controlled by the:
A. Atmospheric Steam Dump valves.
B. Turbine Bypass Valve.
C. S/G Code Safeties.
D. Hogger.
A. Atmospheric Steam Dump valves.
Which of the following describe a location in the main steam piping that, if broken,
would directly affect the steam supply line to turbine driven AFW Pump P-8B?
A. Downstream ‘A’ S/G MSIV, CV-0510
B. Between main steam line and manual isolation for ADV for ‘A’ S/G, CV-0781
C. Downstream ‘B’ S/G MSIV, CV-0501
D. Between main steam line and manual isolation for ADV for ‘B’ S/G, CV-0780
B. Between main steam line and manual isolation for ADV for ‘A’ S/G, CV-0781
The plant is operating at 100% power when an electrical transient results in a turbine
trip and loss of 125V Bus D11-1.
What is the position of the Atmospheric Steam Dump Valves (CV-0779, 0780, 0781,
and 0782) and Turbine Bypass Valve (CV-0511) immediately following the trip?
0511, 0779, 0780, 0781, and 0782
A. o o o o o
B. x x x x x
C. o o x o x
D. x x o x o
D. x x o x o
Y-01, Instrument AC, has been de-energized. Which of the following Main Steam
components are affected by this power loss?
A. Main Steam Isolation Valve Bypass Valves
B. Turbine Bypass Valve
C. Atmospheric Steam Dump Valves
D. Main Steam Isolation Valves
B. Turbine Bypass Valve
The plant is operating at 100% power when an electrical transient results in a turbine
trip and loss of 125V Bus D21-1.
What is the position of the Atmospheric Steam Dump Valves (CV-0779, 0780, 0781,
and 0782) and Turbine Bypass Valve (CV-0511) immediately following the trip?
0511, 0779, 0780, 0781, and 0782
A. o o o o o
B. x x x x x
C. o o x o x
D. x x o x o
C. o o x o x
Given the following conditions:
• A plant shutdown from 100% power was initiated due to steam leakage on a pipe
weld for MV-MS646, Pressure Tap (located just upstream of TBV CV-0511).
• During the shutdown, a fault developed on 125V DC Bus D21-1 which was
subsequently de-energized.
• The Control Room Supervisor directs the NCOs to trip the reactor and close the
MSIVs to isolate the leak.
• After tripping the reactor, the NCO identifies ‘B’ MSIV, CV-0501 valve position
indicating lamps are extinguished.
• The indicating lights for CV-0510, ‘A’ MSIV, valve position and DC power available
light are illuminated.
How can the NCO close ‘B’ MSIV CV-0501?
A. Push the Containment High Radiation Initiate Push Button on the C-13 panel.
B. Select the close position on ‘B’ MSIV CV-0501 control switch.
C. Select the close position on ‘A’ MSIV CV-0510 control switch.
D. Push the Turbine Trip Pushbutton on the C-02 Panel.
C. Select the close position on ‘A’ MSIV CV-0510 control switch.
• The plant is being cooled down using the Atmospheric Steam Dump Valves
(ADVs).
• Main Steam Isolation Valves (MSIVs) are closed.
• HIC-0780A, Steam Dump Controller, is in MANUAL with a 10% output signal.
• PIC-0511, Turbine Bypass Valve (TBV) Controller is in AUTO.
The expected control board valve position indications for the ADVs and the TBV are:
ADVs
RED light GREEN light
TBV
RED light GREEN light
A. off on off on
B. off off off on
C. on on off off
D. off off on on
B. off off off on
• Plant is being cooled down using the Atmospheric Steam Dump Valves (ADVs).
• Main Steam Isolation Valves (MSIVs) are closed.
• HIC-0780A, Steam Dump Controller, is in MANUAL with a 30% output signal.
• PIC-0511, Turbine Bypass Valve (TBV) Controller is in AUTO.
• Main Turbine backpressure is 4” and rising.
The expected control board valve position indications for the ADVs and the TBV are:
ADVs
RED light GREEN light
TBV
RED light GREEN light
A. off on off on
B. off off off on
C. on on off off
D. off off on on
D. off off on on
Which of the following describes the locations where Atmospheric Steam Dump Valves
can be controlled?
A. Control Room and C-150
B. C-150 and Panel C-33
C. Control Room and Panel C-33
D. Control Room and locally in CCW Room Upper Level
C. Control Room and Panel C-33
Which ONE of the following pairs of conditions will automatically close the Main Steam
Isolation Valves (MSIVs)?
A. Containment High Pressure (CHP) OR S/G Low Level.
B. Safety Injection Actuation (SIAS) OR S/G Low Level.
C. Containment High Pressure (CHP) OR S/G Low Pressure.
D. Safety Injection Actuation (SIAS) OR S/G Low Pressure.
C. Containment High Pressure (CHP) OR S/G Low Pressure.
Which ONE of the following is correct concerning the Atmospheric Steam Dump
Valves?
A. The Atmospheric Steam Dump Valves are prevented from automatic opening until
a turbine trip signal is received.
B. The Atmospheric Steam Dump Valves will quick open when the PCS temperature
error signal reaches 20°F (TAVE at 552°F).
C. The Reactor Regulating System sends an auctioneered TAVE signal to the
Atmospheric Steam Dump Valve controller.
D. Following the quick opening of the Atmospheric Steam Dump Valves, the valves will
modulate to maintain 900 psia on the main steam header.
A. The Atmospheric Steam Dump Valves are prevented from automatic opening until
a turbine trip signal is received.
The reactor was shutdown 4 hours ago. The plant is cooling down using the Atmospheric Steam Dump Valves (ADVs). The Main Steam Isolation Valves (MSIVs) have been closed. A Nuclear Control Operator notes that the Turbine Bypass Valve
(TBV) CV-0511 is indicating throttled open. The demand signal on the turbine bypass valve controller is at 0 output and the Main Steam header pressure is indicating 800 psia. Which of the following describes the status of the TBV, CV-0511, and what action should be taken?
A. The TBV is operating as expected; no action is needed.
B. The TBV is operating as expected; it should be taken to manual and closed to avoid
water hammer.
C. The TBV should be closed; a work request should be generated to evaluate the
problem.
D. The TBV should be closed; it should be taken to manual and closed.
A. The TBV is operating as expected; no action is needed.
The reactor was tripped 40 minutes ago due to an Excess Steam Demand Event. The
Main Steam Isolation Valves (MSIVs) have been closed and the faulted steam
generator has been isolated. The plant is being stabilized using the Atmospheric
Steam Dump Valves (ADVs) on the non-faulted steam generator. An NCO notes that
the Turbine Bypass Valve (TBV), CV-0511, is throttled open with no output signal
indicated on the controller. Which of the following describes the status of the TBV,
CV-0511, and the action that should be taken?
A. The TBV is operating as expected; no action is needed.
B. The TBV is operating as expected; it should be taken to manual and closed to avoid
water ham mer.
C. The TBV should be closed; a work request should be generated to evaluate the
problem.
D. The TBV should be closed; it should be taken to manual and closed.
A. The TBV is operating as expected; no action is needed.
Which one of the following describes the design of the Main Steam Isolation Valves
automatic closure logic for a Main Steam Line Break inside containment?
A. EITHER Steam Generator pressure lowers to 500 psia AND Containment pressure rises to 4 psig.
B. BOTH Steam Generator pressures lower to 500 psia AND Containment pressure rises to 4 psig.
C. BOTH Steam Generator pressures lower to 500 psia OR Containment pressure rises to 4 psig.
D. EITHER Steam Generator pressure lowers to 500 psia OR Containment pressure rises to 4 psig.
D. EITHER Steam Generator pressure lowers to 500 psia OR Containment pressure rises to 4 psig.
Given the following plant conditions:
• The plant was at full power when the Reactor tripped.
• Atmospheric Dump Valve (ADV) controller, HIC-0780A, is in AUTO.
• Turbine Bypass Valve (TBV) controller, PIC-0511, is in AUTO.
• Main Condenser vacuum has reduced to 4”.
• Instrument Air system pressure has reduced to 20 psig and is stable.
Which one of the following describes the response of the ADVs and the TBV, and what
action will the operators take for PCS heat removal?
A. BOTH the TBV and the ADVs will close; operators will take action to remove PCS
heat using the Hogging Air Ejector
B. BOTH the TBV and the ADVs will close; operators will take action to remove PCS
heat using the once-through-cooling-method
C. ONLY the TBV will close; operators will take action to remove PCS heat using the
ADVs
D. ONLY the ADVs will close; operators will take action to remove PCS heat using the
TBV
C. ONLY the TBV will close; operators will take action to remove PCS heat using the
ADVs
Given the following plant conditions:
• The plant was at full power when the Reactor tripped.
• Atmospheric Dump Valve (ADV) controller, HIC-0780A, is in MANUAL.
• Turbine Bypass Valve (TBV) controller, PIC-0511, is in AUTO.
• Main Condenser vacuum has reduced to 15”.
• Instrument AC Bus Y01 is de-energized.
• The in-service TAVE/TREF Controller has fails high.
Which one of the following describes the response of the ADVs and/or the TBV?
A. TBV will fail closed and the ADVs will fail closed
B. TBV will fail closed and the ADVs will fail open
C. ONLY the TBV will fail closed
D. ONLY the ADVs will fail open
B. TBV will fail closed and the ADVs will fail open