Standard Post Trip Actions (SPTAs) Flashcards

1
Q

The CRS should communicate with the ___ as necessary to concur with the diagnosis. The ___ should communicate with the ___ to discuss the diagnosis.

A

STA

SM

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

If boration is required per SPTA Step 2, the operator should borate with at least ___

A

1 CH Pump hard started

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

___ to de-energize the CEDM MG set is the only step that should be performed as part of SPTAs to de-energize the CEDM MG set.

A

Opening the input breakers for L03 and L10…

  • Load Centers should be de-energized for at least 5 seconds to ensure that enough time has elapsed to allow effects of MG set flywheel to taper off…thus preventing MG restart (re-energize after the 5 seconds for loads)
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Per SPTA step 3, Do not attempt to start the diesel if ___

A

…any High Priority trip alarm is present

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Per SPTA step 3, Do not attempt to close the output breaker if ___

A

…a fault exists on the vital bus.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Per SPTA step 4, Do not ___ if a SIAS has occurred, until an ORP is entered.

A

…restore Letdown

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Per SPTA step 4, If QSPDS is not available or RCS Pressure is < 350# then use ___

A

…Appendix 2, Figures

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Per SPTA step 5, Check SIAS is initiated by ensuring ___

A

ESFAS signal has been initiated, sequenced loads are running and HPSI and LPSI are aligned to inject to the RCS

*RO should take manual action to start pumps and open injection valves if the sequenced loads are not in desired state

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Per SPTA Step 6, Use QSPDS to obtain sub cooling data (forced circulation use ___, natural circulation use ___)

A

RCS sub cooling for forced circulation, CET sub cooling for natural circulation

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Per SPTA step 7, FW available means that FW can be supplied to a SG when required. And Main Feed on RTO is ___ even if temperature has dropped low enough for RTO to stop feeding the SGs

A

Acceptable

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

If an AF pump must be started, then attempt to start ___, ___ or ___ (in order of preference except for LOOP events)

A

AFN-P01, AFB-P01 or AFA-P01

NBA except when its a LOOP (or AFB is already running for some reason, etc)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Do not attempt to bypass ___ or reset ___ to restore FW until the ORP is entered.

A

MSIV’s or reset AFA

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

If AFA-P01 is to be started manually, ensure both ___ are closed before starting the pump. This ensures the ___, preventing an overspeed of the turbine.

A

Steam admission valves

Speed control circuit is reset before starting the pump

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

When using SBCS in manual or using ADVs to control Tc, the ___ of the temperature band should be used. Using the ___ will allow a larger margin from the SG safety lift set point.

A

Lower end of the temperature band

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

If available, ___ should be used to control Tc.

A

SBCS should be used (ADVs if not available)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Check MSIS initiated by ensuring ___

A
  1. ESFAS signal has been initiated

2. MSIV, MFIV and BD IVs are closed

17
Q

Tc should be stabilized using the ___

A

RCS Loop with the lowest Tc

18
Q

___ may be closed, if needed to reduce heat removal

A

Turbine drain valves

19
Q

___ may be shut down to reduce steam load

A

Main Feed Pumps

20
Q

Per SPTA Step 9, Opening CTMT IA isolation should be performed as needed to support ___ or to close ___

A

RCP Operation or to close RCP CBO valves