Vol 4 Flashcards

(46 cards)

1
Q

What are the typical dimensions for the minimum operating strip (MOS) for tactical aircraft (fighters)?

A

50 X 5000ft

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

After a conflict is over, what type of repairs is designed to turn the airbase to its original condition?

A

Permanent

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

When an enemy attack becomes eminent, the rapid runway repair (RRR) assets must be

A

equally divided and dispersed to pre-designated areas.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

When are you allowed to disperse rapid runway repair (RRR) equipment to designated staging areas situated near the runway?

A

After you receive an “all clear”.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

How many common crater repair methods are discussed and used by the Air Force?

A

Three

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Who determines how much fill material is needed at the crater repair sites?

A

Crater NCOIC.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What is the first action you take if it becomes necessary to repair a broken pipe or cable located in a crater?

A

Isolate the damaged utility

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What is the last step in the airfield damage repair (ADR) process before flying operations can begin?

A

Sweeping Operations

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Spalls can be up to how many feet in diameter?

A

Four

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Which method is considered the quickest, but has limited success in repairing spalls?

A

Cold-Mix Asphalt

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Before you can use any material on Department of Defense (DOD) airfields, you must make sure it

A

is certified for use.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Joining two folded fiberglass mats (FFM) together requires the use of a two foot,

A

1¼-inch wide by 30 foot long two-ply panel.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

When joining two folded fiberglass mats (FFM) together, always pull

A

in a direction that is perpendicular to the hinges

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

A horizontal gap of 1 inch between the edges of the folded fiberglass mat (FFM) and the ramp is required to allow for

A

mat removal or replacement

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

How many rows will one standard pallet of AM–2 mats cover if the runway width is 72 feet?

A

2 Feet

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Which item allows two AM–2 mat laying teams to start work in the middle of a runway and work in opposite directions towards the end of the runway?

A

Starter Key Lock

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

The centerline lights are used for a nighttime operation in an AM–2 mat package. How many feet apart are these light installed?

A

100ft.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

Soil material supporting AM–2 matting must have a California bearing ratio (CBR) rating of at least

A

10.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q

You are spotting AM–2 mat pallets around a mat laying area. To do this properly, you should place them in the center of the runway at

A

4-foot intervals

20
Q

What are the end plates from the AM–2 mat pallets used for?

A

Runway and taxiway junctions.

21
Q

When anchoring AM–2 matting, make the anchor ditch

A

18 to 24 inches deep and cut it at a 15° to 30° angle.

22
Q

What is the first step in disassembling an AM–2 mat runway?

A

Cut all splice plates.

23
Q

The purpose of revetments is to

A

protect parked aircraft and essential facilities.

24
Q

The best way to repair damage to a large section of a revetment is to

A

replace the damaged section

25
What two types of pre-cast concrete revetments are replacing A1 and B1 metal revetments?
Bitburg and concrete chamber soil bins.
26
With what kind of liner is an expandable bin-type revetment lined?
Geo-Fabric,
27
What is the minimum amount of people required to erect an expandable bin revetment?
2 people.
28
What is the main advantage of expandable bin revetments over metal revetments?
Reduced shipping weight.
29
If you are preparing to construct a timber bridge, your most important consideration is to
make sure the bridge is constructed according to its projected use .
30
If at all possible, constructing a soil-cement road should be restricted during
Wet or Freezing weather
31
When treating a soil-cement road area with cement for final finishing, you divide the areas into sections. The purpose of this is to
make it possible to complete an area in one working period.
32
A sanitary landfill should not be located near
A Spring
33
At the least, how many feet of final earth cover should you use when abandoning a sanitary landfill trench?
2 feet.
34
Which fuel bladder berm is the least desirable?
Above Ground Level.
35
In the event fuel should catch fire in a berm, what can you do to reduce the amount of flammable material left to burn?
Open the Ditch
36
What is one of the first things you do after constructing a lagoon?
Secure the area with a fence.
37
The purpose of building adjustable outlet pipes to extend through the lagoon’s berm is to
Control the operating depth
38
What is the first thing to assemble when you are going to erect a temper tent?
Tent Frame
39
What do you use to join sections of the temper tent together?
Beckets
40
When disassembling a temper tent, when do you remove a single ply floor?
After you remove all internal components.
41
The Small Shelter System tent can withstand steady wind loads of
50 Knots
42
How many types of liners does the Small Shelter System tent use?
3 Liners
43
The environmental control unit should be approximately how many inches away from the Small Shelter System (SSS) tent end wall?
12 Inches
44
Inspect the Small Shelter System tent electrical cable assemblies every
30 Days
45
When you are making a repair to a small tear on the Small Shelter System tent, the patch material must extend a minimum of how many inches around all sides of the tear?
3 Inches
46
Who is responsible for the quality of a contractor’s performance?
The Contractor