32 - Emer LSR Ops Flashcards
1
Q
DISTRESSED M ACTIONS
A
“MILF”:
M ayday ~ WHEN REALIZE POSS NEED
I dentify Unit & position
L oc. Fr rope deployment
F ULLY clear window while AWAITING LSR from above
2
Q
General Info.
A
- Under direction of Command Chief
- On citywide basis when lg # personal harness and/or PSS OOS
- Structural fire/NFP Bldg/3 Sty OR Greater = 1st & 2nd Roof bring LSR to roof
- FP Residential (e.g. Apt. House, nursing home, Sr. citizen housing, dorms) = Bring LSR to Fl. Above
- 1st Roof carry LSR to position & do duties as per SOP
- 2nd Roof. “. “. “. “. & immed I.D. Poss subs objects & position LSR @ that loc for poss use
- Also position LSR of 1st Roof @ subs object (diff one if avail)
- After doing this, then do assigned duties
- LSR NOT removed from carry case EXCEPT for actual rescue & removal ops.
- 2 Roof FF’s maintain their position UNTIL IC declares “PWH” OR IC informs M’s to either Evac roof OR that their services on roof No longer required
**PREFERRED METHOD for removal of distressed M w/personal harness is single slide via LSR from above
**Not wearing Personal Harness = 2 Roof FF’s do lowering op
**THIS IS LAST RESORT!! - Single slide not used to make rescue p/u
- IC announce on HT if Roof level team no longer in place when removed from roof (OR Floor above in FPMD).
- IC ensure roof duties (searches) assigned to other M’s
DISTRESSED M ACTIONS = “MILF”:
M ayday ~ WHEN REALIZE POSS NEED
I dentify Unit & position
L oc. Fr rope deployment
F ULLY clear window while AWAITING LSR from above
- IC ensure roof duties (searches) assigned to other M’s
3
Q
Substantial Objects
A
- NEVER = Soil pipe vent, TV Antenna Mast
- Vertical Object - Chimney OR DW BH = Allow rope to drop to base, close to roof= Optimum strength at this point
- Sheet metal housings for roof vents, newel posts OR banisters = NOT RELIABLE
- BH, AL, Around chimney, cut hole/rope around beam = RELIABLE