Plumbing Flashcards

1
Q
  1. What does the abbreviation HM stand for on the door schedule?

A. Half Metal Frame
B. Hallway Metal Frame
C. Hollow Metal Frame
D. Halloway Metal Frame

A

C. Hollow Metal Frame

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q
  1. What does the mechanical abbreviation FT mean?

A. Fan Tube
B. Fin Tube
C. Fire Tube
D. Furnace Tube

A

B. Fin Tube

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q
  1. What does the mechanical abbreviation CUH mean?

A. Cabinet Unit Heater
B. Chiller Unit Handler
C. Cooling Unit Handler
D. Convector Unit Heater

A

A. Cabinet Unit Heater

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q
  1. If the plumbing plans (not included for this question) had the abbreviation DWV on them, what does the DWV mean?

A. Drain Waste and Vent
B. Drain, Water and Vent
C. Domestic Waste Valve
D. Domestic Water Valve

A

A. Drain Waste and Vent

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q
  1. If the plumbing plans (not included for this question) had the abbreviation DS on them, what does DS mean?

A. Drain Spigot
B. Down Spout
C. Drain System
D. Domestic System

A

B. Down Spout

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q
  1. If the plumbing plans (not included for this question) indicated DS on the plans, what system would the DS be connected to?

A. Storm Sewer
B. Sanitary Sewer
C. Domestic Water
D. Sprinkler System

A

A. Storm Sewer

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q
  1. If the Site utility plans (not included for this question) had the abbreviation I.E. on them. What does I.E. mean?

A. Invert Elevation
B. Inside Elevation
C. Initial Elevation
D. Interior Elevations

A

D. Interior Elevations

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q
  1. At what point is the I.E. calculated to:

A. Top inside of the pipe
B. Top outside of the pipe
C. Bottom inside of the pipe
D. Bottom outside of the pipe

A

B. Top outside of the pipe

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q
  1. What is the purpose of a water hammer arrestor?

A. Reduce the pressure in the line
B. Reduce the vibration in the line
C. Maintain a constant flow in the line
D. Maintain a constant pressure in the line

A

B. Reduce the vibration in the line

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q
  1. What does the plumbing abbreviation VTR mean?

A. Vent Thru Roof
B. Vent Top Return
C. Vertical Top of Roof
D. Vertical Transfer Run

A

A. Vent Thru Roof

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q
  1. What system is the VTR connected to?

A. Storm Sewer
B. Sanitary Sewer
C. Domestic Water
D. Sprinkler System

A

A. Storm Sewer

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q
  1. What system is the CO connected to?

A. Storm Sewer
B. Sanitary Sewer
C. Domestic Water
D. Sprinkler System

A

C. Domestic Water

How well did you know this?
1
Not at all
2
3
4
5
Perfectly