Chapter 9 Flashcards

1
Q

Preliminary study

A

Preliminary study is a brief study at whether or not a new system is needed

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Feasibility study

A

Feasibility study looks at the existing system and possible alternatives to this.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Problem analysis

A

Problem analysis is analysing the problems of the old system and seeing how these problems can be reduced

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Design

A

Design is the designing of how the requirements of the organisation are to be implemented

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Construction

A

Construction is the building stage of the new system

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Testing

A

Testing is testing the new system for faults

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Module testing

A

This is where each part of the system is tested

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Functional testing

A

This is testing that the outputs are correct for the given inputs

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

System testing

A

This is testing that the system meets its specified requirements

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

User testing

A

This is testing that users can use the system using real data

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Operational testing

A

This is testing that the system can be used in its normal environment

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Installation

A

This is the installing of the new system for use

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Direct changeover

A

A direct switch from using the old system to using the new system

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Parallel running

A

This is running both the old and new systems for a period of time until the new system is working correctly

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Phased conversion

A

This is installing the new system in stages

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Pilot conversion

A

This is installing the system one department at a time within the organisation

17
Q

Maintenance

A

Maintenance is making necessary changes to the system for it to maintain operational

18
Q

Project management

A

Project management is managing a development project

19
Q

Linear methodologies

A

This is a method of developing systems in a linear order

20
Q

Iterative methodologies

A

This is a method of developing a new system where you repeat a section over and over until you get the solution