Lesson 1 Flashcards

1
Q

What are the 8 adaptions for LEED BD+C rating system

A
  1. New construction and Major Renovations
  2. Core and Shell Development
  3. Schools
    4.Retail
  4. Data Centers
  5. Warehouses and Distribution Centers
  6. Hospitality
  7. Healthcare
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What are the three adaptions for LEED Interior Design and Construction?

A
  1. Commercial Interiors
  2. Retail
  3. Hospitality
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What are the 6 adaptions for LEED Building Operations and Maintenance ?

A
  1. Existing Building
  2. Retail
  3. Schools
  4. Hospitality
  5. Data Centers
  6. Warehouse and Distribution Centers
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What are the adaptions for LEED Neighborhood Development

A
  1. Plan
  2. Built project
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What are the adaptions for LEED Homes?

A
  1. Homes and Multifamily Lowrise
  2. Multifamily Midrise
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

New construction and major renovation adaptation for LEED BD+C

A

-new construction or major renovation of buildings that do not primarily serve K-12 education, retail, data centers, warehouses, hospitality or healthcare users
-includes high rise residential buildings 9 or more stories
-the owner or tenant needs to occupy at least 50% of the leasable space

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

The core and shell adaption for for LEED BD+C

A

-new construction or major renovation for the exterior shell and core mechanical, electrical, plumbing units
-not complete interior build out
-for use of more than 40% of the gross floor are is incomplete at time of certification

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

The schools adaption for LEED BD+C

A

-Building made up of core and ancillary learning spaces on K-12 school grounds
-may be used for higher education and non-academic buildings on school campuses

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

The retail adaption for LEED BD+C

A

-buildings used to conduct the retail sale of consumer products
-includes both direct customer service areas ( showrooms) and preparation or storage areas that support customer service

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Data center adaptation for LEED BD+C

A

-buildings specifically designed and the needs to meet the needs if high density computing equipment
-only address while building data centers (greater than 60%)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

The warehouse and distribution center adaption of LEED BD+C

A

-Building used to store goods, manufactured products, merchandise, raw materials, or self storage

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

The hospitality adaption of LEED BD+C

A

-buildings such as hotels, motels inns, or other businesses that provide transitional or short term lodging with or without food

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

The healthcare adaptation of LEED BD+C

A

-hospitals that operate 24 holes a day, 7 days a week, and provide medical treatment, including acute and long term care

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What is the 40/60 rule

A

-If a rating system is appropriate for 40% or less of a LEED projects gross floor area, then that rating should be used
-if a rating system is appropriate for 60% or more of a LEED projects gross floor area, then that rating system should be used
-between 40-60% the project team should decide what is appropriate

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

What are the LEED credit categories

A

-integrate process, IP (not an official category)
-location and transportation, LT
-sustainable sites, SS
-water efficiency, WE
-energy and atmosphere, EA
-material and resources, MR
-indoor environmental quality, EQ
-innovation, IN
-regional priority, RP

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

MPR1

A

Must be in a permanent location on existing land

17
Q

MPR2

A

Must use reasonable LEED boundaries
-all contiguous land associated with the project and supports its typical operations
-land altered as a result of construction and features used primarily by the projects occupants, like hardacapes, septic equipment, etc
-may not exclude portions to give an advantage

18
Q

MPR3

A

Must comply with project size requirements
-minimum 1000 SF gross floor area