VSM

A

Process boxes
Material flow
Information flow
Time ladder

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Six sigma metoder

A

DMAIC
1. Define the system
2. Measure key aspects and collect relevant data
3. Analyze the data and seek out root cause of the
defect under investigation
4. Improve or optimize the current process
5. Control the future state process and implement
control systems
DMADV
Design, measure, analyse, design, validate

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Economic lot size

A

How many items should be manufactured in batches to minimize the cost of production.

The most economically viable cost is the intersection between inventory cost and setup cost.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Spare parts management for lumpy demand

A

Risk-based management:
Given the acceptance of a certain risk of running out of stocks, should we stock spare parts? If so, how many?

Uses a Poisson distribution with random failure calculate the inventory size needed for not running out of spare parts. To apply this we need data: failure rate, number of machines using part and coverage period. The advantage is that it is easy to use. It does not consider normal storage cost. Easy to use, but do not take inventory or backorder costs into consideration.

Minimum global cost:
Which is the inventory level that minimizes the total costs?

Finds the intersection of the inventory and backorder cost (lowest global cost). Need failure rate, number of machines, coverage period, unitary inventory cost.
Intersection between Inventory cost and backorder cost.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Excersise

A

.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

outsourcing

A

.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

5s

A

.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

hiejunka

A

.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

process capability SPC

A

.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

4 første TPM

A

.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

industry 4.0 og lean og supply chain

A

.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly