sap production planning

This class was created by Brainscape user Paul Maka. Visit their profile to learn more about the creator.

Decks in this class (14)

1 - Create Bill Of Material
TCODE: CS01 To learn: How to create a new Bill Of Material Business Scenario: --------------------------- The design team has updated the look of the doors for an existing Refrigerator that is manufactured at your plant. The new door(door_W-0030d) is made up from a different set of components than the existing door model and you have been asked by the production manager to create a Bill Of Materials in SAP for the new door.
6  cards
2 - BOM Level by Level Report
TCODE: CS11 To learn: How to use the Bill Of Material(BOM) Level by Level Report Business Scenario: ------------------------- The new door, Model D(door_W-0030d), that you were asked to create the Bill Of Material for, has a number of differences in the components, from the previous version of the door Model C. You have been asked by your Manager to review the Bill Of Material for the Model C and identify any differences at all Levels of the BOM.
5  cards
3 - Material Where-Used-List
TCODE: CS15 To Learn: How to use the Material-Where-Used-List Business Scenario: --------------------------- The Purchasing department has been asked by a Vendor to inform them how many products your Company manufactures that contain one of the items they supply called: Gasket_w_0030. You will need to examine all levels of each Bill Of Material to find out this information. To do this, the Material-Where-Used-List is most appropriate.
4  cards
4 - Create Work Center
TCODE: CR01 To Learn: How to create a new Work Center Business Scenario: ---------------------------- A new automatic steel cutting saw machine has arrived at the plant. In order to allocate work to this machine, it needs to be created as a Work Center. You have been asked to create the Work Center for this new steel saw.
6  cards
5 - Create Work Center Hierarchy
TCODE: CR21 Business Scenario: ~~~~~~~~~~~~~~~~ The new Work Center has been created(T-G32)as an additional steel saw has been installed at the plant. The refrigeration production manager would like to know much capacity he has available now that are 6 steel saws that can be used by the refrigeration department. To help calculate capacity, the production Manager would like you to create a Work Center Hierarchy for the Steel Saw, 1 - T-G25 2 - T-G28 3 - T-G29 4 - T-G30 5 - T-G31 6 - T-G32
5  cards
6 - Work Center Where Used List
TCODE: CA80 Business Scenario: ---------------------------- The Work Center T-G23, is due to have preventive maintenance carried out onit nexr week. The Production Manager has asked you to find out what materials will be affected by this, so the MRP(Material Resource Planning)Controller can move production to other work centers. To do this, you will need to find out what routing this work center is used in.
5  cards
7 - Create a Routing
TCODE: CA01 Business Scenario: --------------------------- The new door. model D(door_w_0030d) that you were asked to create the Bill Of Material for, has a number of differences than previous models with relation to the operations that are required to manufacture the door. The Production Manager has explained the operations that now take place and you have been asked to create a new Routing for the material.
6  cards
8 - Create MRP Profile
TCODE MMD1 Business Scenario: --------------------------- The Production Manager has decided that certain materials should have the same MRP value when they are created based on how the material is planned. In order for this to occur, an MRP Profile can be created and used during Material Master Data creation so that the values are automatically entered. A number of MRP Profiles already exist, but the Production Manager needs a new MRP Profile for a range of new material that will be created.
6  cards
9 - Create a Forecast Profile
TCODE: MP80 Business Scenario: ~~~~~~~~~~~~~~~~ The Forecasting Team has been advised about the new products and believes that in order to assist in forecasting a new Forecast Profile should be created. This Profile can be used during Material Master Data creation so that the values are automatically entered. Currently, there are not Forecast Profiles already created that could be used as a template. so each field need to be entered manually, along with the default value. The Forecast Team ha
4  cards
10 - Create a Production Order
Business Scenario: --------------------------- The MRP Controller checks the nightly MRP run each morning to review the orders created by the system. Amendments are made to the production orders concerning modifying dates or quantities. After this was completed for the day, the production manager was informed that a part needs to be manufactured that was not included in the MRP run. You have been asked to enter a production order for the part.
4  cards
11 - Orders by Material Number
TCODE: CO21 Business Scenario: --------------------------- The Warehouse Manager is reviewing the inventory of a number of items in the Warehouse. He is concerned about having enough space for incoming orders. For certain items he needs to make sure enough space has been allocated, but he does not know how many he should expect. He has asked you to inform him of what orders are currently in process for certain Warehouse items.
6  cards
12 - Order by MRP Controller
TCODE: CO22 Business Scenario: --------------------------- To learn: 1 - How to run the Orders by MRP Controller Report 2 - How to assign a Production Order to another MRP Controller. One of the MRP Controllers, Paul Maka, has been promoted and all his current production orders have been allocated to other MRP Controllers. To ensure that no production orders have been missed, the production manager has asked you to check the production orders by MRP Controller to see if any are still allocate
5  cards
13 - Goods Issue To Order
Business Scenario: ---------------------------- A Production Order has just commenced on the shop floor. The items were staged next to the production line and everything was checked prior to the beginning of the shift. The Production Manager has called you to say that the wrong gasket has been staged for the order and he needs you to issue the correct gasket to the production order so the operation can begin. TCODE: MB1A
6  cards
14 - Confirm Operation with Time Event
Business Scenario: --------------------------- The Production Order 60003308 is in process. The first operation is about to start and the operator has noted the time that the setup has begun. The Production Manager would like this actual time entered into the system as soon as possible and has asked you to enter the Time Event into the Production Order for the first Operation. TCODE: CO19 Procedural Steps: SAP Easy Access > SAP Menu > Logistics
0  cards

More about
sap production planning

  • Class purpose General learning

Learn faster with Brainscape on your web, iPhone, or Android device. Study Paul Maka's SAP Production Planning flashcards now!

How studying works.

Brainscape's adaptive web mobile flashcards system will drill you on your weaknesses, using a pattern guaranteed to help you learn more in less time.

Add your own flashcards.

Either request "Edit" access from the author, or make a copy of the class to edit as your own. And you can always create a totally new class of your own too!

What's Brainscape anyway?

Brainscape is a digital flashcards platform where you can find, create, share, and study any subject on the planet.

We use an adaptive study algorithm that is proven to help you learn faster and remember longer....

Looking for something else?

Digital Media - Unit 2: Pre-productio...
  • 5 decks
  • 52 flashcards
  • 3 learners
Decks: Lo1 Understand The Factors That Need To, Unit 2 Exam Paper, Lo2 Be Able To Interpret Client Requirem, And more!
SAP
  • 6 decks
  • 812 flashcards
  • 6 learners
Decks: Hana300, Hana300 Training Questions, Hana300 Notes, And more!
Production Of Materials
  • 4 decks
  • 20 flashcards
  • 1 learners
Decks: Ch 4 Galvanic Cells, Ch 5 Nuclear Chemistry, Ch 1 Fossil Fuel Products, And more!
A2 Italy Essay Plans
  • 15 decks
  • 904 flashcards
  • 60 learners
Decks: Slow Progress To Unification By 1848, How Far Was Nationalism The Main Reason, How Far Was The Intervention Of Foreign, And more!
Make Flashcards