??? Flashcards

(48 cards)

1
Q

Design Direction Review. Program Team meeting to review the Unbalanced Component Targets and decide upon balanced targets

A

DDR

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Global Vehicle Development Process

A

GVDP

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Product Program Cost Optimization

A

PPCO

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Simultaneous Management Team Assistant

A

SMTA

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Document of Strategic Intent. Milestone gate in the Global Vehicle Development Process (GVDP). Typically this is the breakpoint between concept definition and production development

A

DSI

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Executive Chief Engineer

A

ECE

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Program Framing Initiated

A

PFI

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Bill of Material. Plan for components or subsystems, used as a resource planning tool for dollars, cadence, head count, sourcing.

A

BOM

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Vehicle Systems Engineer - One VSE for structure, closures, etc

A

VSE

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Cost Engineer

A

CE

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Reliability Order

A

R&O?

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Electronic Statement of Requirements

A

ESOR

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Statement of requirements. A comprehensive document that defines specific deliverable, timetables, costs and responsibilities for procurement of engineering development, design, build or test.

A

SOR

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Heating, Ventilation, Air Conditioning & Powertrain Cooling

A

HVAC/PTC

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Product Measurement Interface

A

PIM

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Engineering Work Order

A

EWO

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

Automotive Process Model

A

APM

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

Functional Name Address. A classification code that identifies a functional part name that is common across vehicles.

A

FNA

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q

Uniform Parts Classification. A corporation - established parts classification system that provides a systematic method of classifying vehicle components utilized in the assembly of GM vehicles.

A

UPC

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
20
Q

Uniform Parts Classification & Functional Name Address

A

Uniform Parts Classification & Functional Name Address UPC-FNA

21
Q

Simultaneous Management Team. Optimize Product Design Quality of Subsystems & Their interfaces through the use of Quality Engineering practices and tools to achieve a high level of customer enthusiasm

22
Q

Parts not on contract

23
Q

Global Direct Material Purchasing System

24
Q

Vehicle Partitioning $ Product Structure. The VPPS functional view breaks the vehicle down to subsets, such as chassis, electrical, and exterior.

25
Metal Fabricating Division. Some references show the F standing for Fabrication; Fabricating is the correct term.
MFD
26
VPPS Level 3 higher level classification of parts 50.01.01...3 two number sections
VPPS Level 3
27
Design release engineers - DRE for fascia, outside rearview mirrors....get deeper into the details...send cost engineers a part list on what they need to be estimating.
DRE
28
Mid cycle major
MCM - (in costbook)
29
Cot per unit read across matrix application
CPURAM
30
Product Program Content (Formerly Plan Book)
PPC
31
Vehicle has been approved for production and parts are being sources
Post - DSI Costbook
32
Engineering Change Request
ECR
33
Vehicle Program Initiation
VPI
34
Master Parts List
MPL
35
Component Based Release
CBR
36
Tracking model Change Description
TMCD
37
Tracking Model Parts List
TMPL
38
Engineers Log book
ELB
39
Advance Material Cost Tracker
AMCT
40
Platform Status Review. Meeting chaired by TVIE (Total Vehicle Engineer). Reports out status of SMT's, statements of work (SOW), and program imperatives. (Truck only)
PSR
41
Responsible for coordinating the functional (performance) an physical (design) integration of the complete vehicle)
TVIE (Total Vehicle Integration Engineer)
42
Contract Sign Off
CSO
43
Program Viability
PVR
44
Bomb Change Request
BCR
45
Program Framing Initiative
PFI
46
Vehicle Program Initiation
VPI
47
Start of Regular Production
SORP
48
Advanced Vehicle Development. Manufacturing Team previously known as GPDC
AVD