1
Q

Where construction activity is more than ___ m from a public way, there must be a barricade that is at least ___ m high between the site and the public way.

A

2m, 1.8m

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Where construction activity is more than 2 m from a public way, there must be a barricade that is at least 1.8 m high between the site and the public way. Each opening must have a gate that can be locked when no one is on site – T or F.

A

T

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Barricades that encircle the worksite must NOT have a sign at each access point that shows the safety requirements for the site. T or F

A

F. They must.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

A covered way is required where construction activity is not in an enclosed structure and is less than ___ m from a public walkway.

A

2 m (6’6”)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

A covered way must be at least ___high and __wide unless the width of the public way is under 1.5 m).

A

2.5 m high and 1.5 m wide.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

A covered way must be enclosed on the site side. T or F

It must have a standard guardrail on the street side.
T or F

Lighting must be provided at times when the public way is normally lit.
T or F

A

T
T
T

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What are some methods of redirecting traffic when construction activity creates a hazard.

A
Signal persons
Warning signs
Barriers
Lane control device
Flashing lights or flares.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

One should consult with traffic authorities about the appropriate time and methods for redirecting traffic at or near a work site. T or F

A

T

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Why can construction site fires be difficult to control?

A

Aced and egress for firefighters and workers may not be optimal.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What are some fire regulations to apply to ongoing projects and incomplete or abandoned sites?

A

Include a site and safety plan with the permit application.
Reduce and barricade hazards on abandoned sites.
Hire a watchmen to prevent unauthorized access to dangerous areas on a worksite.
Gate and lock openings

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Should you consult with local authorities before starting a demolition?

A

Yes. Each job has different degrees of danger.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Workers who are working on the site at night need to know how to safely leave the building or work site of the lights go out. T or F

A

T

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Each site must have an evacuation plan and fire warning system. T or F

A

T

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

How many stairwells must be kept operational at all times. T or F

A

T

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

An appropriate number and type of a portable fire extinguishers must be supplied in accordance with the fire safety plan. T or F

A

T

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

What is the minimum fire watch?

17
Q

Does a fire safety plan include smoking areas?

18
Q

At what depth must an engineer be consulted for trench shoring design?

A

Over 3.0 meters

19
Q

When is lighting necessary in a covered walkway?

A

When public ways are regularly lit

20
Q

When is it necessary to properly tie-off a ladder?

A

Every time it is moved.

21
Q

How far from a live overhead power line must a worker remain?

22
Q

How often must rigging be inspected?

A

With each shift

23
Q

When must the operation of a tower crane be suspended?

A

Wind speed is greater than predetermined limits or the temperatures fall below limits set by professionals.

24
Q

Where U-bolt clips are used for fastening wire rope, the U-bolt is installed so that the U-bolt section bears on the…

A

Dead side of the rope

25
What type of hand signals are acceptable when loads are being lifted by cranes?
Those mutually agreed upon by operator and signaller.
26
What is the most common type of shackle used in rigging loads?
Anchor type with screw pin.
27
What are two examples of underpinning?
'leg and leg underpinning' and 'pit underpinning'