Case Study Flashcards

1
Q

What was included in a Listed Building Consent application?

A
  • A completed application form.
  • Site & Location plan
  • Floor Plans and Elevations
  • A certificate of ownership.
  • Design and Access Statement /Heritage impact assessment
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What is a Design and Access Statement /Heritage impact assessment

A

Brief description of the building’s history and background to the proposals which form the basis of the application.

With justification on how the proposal helps to preserve the character of the building and historic fabric. (include photographs).

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What is a certificate of ownership

A

Certificate confirming the applicant is either the sole owner of the land or that notice has been served on all owners /tenants.

This is required in accordance with Section 11 of the Planning Listed Buildings and Conservation Areas Act 1990.

There are four certificates A-D, covering a range of circumstances.

Where the applicant is not the building owner, notices must also be served.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What was the non-material amendment for?

A

The design approved by the LA was for side hung windows.

The owner of the apartment requested for the windows to be top-hung and therefore this change did not materially alter the proposal, but consent was required for the change.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

How were the existing casements hung? Why was this not considered?

A

The existing casements were top hung, I considered this to be due to the angled design.

The design was ultimately approved by the directors who were happy with the side hung style.

The issue was that it wasn’t their apartment and ultimately shouldn’t have been their decision.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Did the non-material amendment affect the LBC?

A

There were no requirements set for which way the casements were to be hung in the LBC.

This was due to the dormers being located on a modern extension that was out of view of the wider conservation area and therefore having no impact no impact on the appearance of the building or the wider conservation area.

When I lodged the non-material amendment, I was informed that an amendment to the LBC would not be required and the change in the casement still discharged all of the conditions set in the listed building consent.

I am aware that you can not alter any conditions set by LBC and that a new application would be required.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What was the time frame for the non-material amendment?

A

28 days

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What was included within your fee /service proposal?

A
  • Scope of services /limitations.
  • Proposed Fee /Payment terms.
  • Complaints handling procedure.
  • T&C’s of business and specific services.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What are the implications if T&C’s are not provided?

A
  • Nothings in writing for what has been agreed.
  • It wouldn’t be considered professional /reputational damage.
  • Lack of transparency
  • A complaint handling procedure may therefore not have been issued which is a breach of the RICS code of conduct.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Who was responsible for paying your fees and who was the fee proposal sent to?

A

The client ‘Homestead’ was responsible for paying the fees who had been appointed by the building owners to manage the property (externally and communal area).

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

What if homestead didn’t pay your fees – would you then go to the owners?

A

No, the agreement was between AG and Homestead who were responsible for paying our fees.

The fee would have been discussed directly between homestead and the board of directors in a separate meeting who confirmed their willingness to pay.

AG were then appointed for the instruction.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

What contract did you use for the works?

A

JCT Intermediate Building Contract with contractors design

  • Tradition procurement
  • Allowed appointment of sub-contractor who was liable for a specific section of design (waterproofing system).
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Did the sub-contractor enter into the contract?

A

The Contractor entered into a sub-contract agreement with the named person. ‘Intermediate Named Sub-Contract Agreement.

Within 14 days of the date of issue of the instruction.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

In terms of the named sub-contractor, what would happen if the principal contractor went bust?

A

The named-sub contract agreement would then be terminated between the contractor and named sub-contractor.

In this instance, I would look at Novation of the contract (transferring the benefits and burdens of a contract to a third party) to continue the works.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Who was the contract between?

A

The contract was between the principal contractor and the director’s private limited company.

The owners had a share of freehold which formed a private limited company.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

What is a share of free hold?

A

Share of Freehold is where the individual flat owners own the leasehold for their flat and hold a share of the freehold for the entire building and the land it is built on collectively owning the whole freehold.

One method of managing a share of freehold for a property with more than four freeholders is to create a private limited company.

The company would be registered as the building’s freehold owner and the other co-owners registered as shareholders and directors of the company.

The board were nominated directors of the company with the rest remaining as shareholders.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

What was the restricted access in terms of height to the rear?

A

Fixed restriction of 2.5m height.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

Was there any other type of lift possible other than a MEWP for maintenance /undertaking the works?

A

I considered a scissor lift but the rear access was for pedestrian use only.
The adjacent church building had a wrap around extension for the church hall.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q

If a MEWP was used to the front elevation, what would you consider?

A

If any road closure were required
Checks with the local authority for permits.
Operators had IPAF licences.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
20
Q

What were the limitations of not using a MEWP and a pole camera instead?

A

Preventing close inspection without being able to physically check the timber for moisture reading and durability.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
21
Q

How were the high-level repairs undertaken?

A

Scaffolding – a low loader was parked up in the rear car park and scaffolding walked through the pedestrian entrance and erected.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
22
Q

How was the scaffolding fixed to the building?

A

The scaffolding was buttressed up to the building without the need for mechanical fixings.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
23
Q

What H&S risks are you aware of in terms of scaffolding?

A
  • Fall from height /edge protection.
  • Adjacent overhead power lines
  • Poor ground conditions
  • Vulnerability to vehicle impact.
  • Preventing unauthorised access on to the scaffold.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
24
Q

What did your Design risk assessment include?

A
  • Falls from height.
  • Asbestos (particularly the basement used for thermal insulation).
  • Movement of vehicles from the rear car park.
  • Preventing unauthorised access on to the scaffold.
  • Potential for lead based paint (banned in 1992).
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
25
Q

Option for splice repairs to window frames, would there be any health risk to sanding down and splice repair of the existing frames?

A

The potential of lead paint; however, the windows were installed in 2002 – I am aware that lead based paint was banned in 1992 and therefore extremely low risk.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
26
Q

Was there any Planning condition to the approval?

A

Construction must be in accordance with the specified materials.

Works must have started no later than 3 years from the date of consent.

No samples were required for discharge of conditions; however, I am aware that this may be the case under section 106 of the Town and Country Planning Act 1990.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
27
Q

What is your understanding on conditions attached to a planning approval and how can these impact the works?

A

Planning obligations are legal obligations entered into to mitigate the impacts of a development proposal.

This can be via a planning agreement entered into under section 106 of the Town and Country Planning Act 1990.

Note: Decision can take up to 8 weeks.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
28
Q

You identified wet rot; what are the other types of rot?

A
  • Wet Rot
  • Dry Rot (internally)
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
29
Q

What are the causes of wet rot?

A
  • Excessive moisture present over a long period of time.
  • High moisture content 50-60%
  • Leaking services
  • Building material failure
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
30
Q

What are the causes of dry rot?

A
  • Leaking plumbing
  • Poor ventilation
  • Moisture content up to 30% considered damp not wet.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
31
Q

How would you identify wet rot?

A
  • Found internally and externally.
  • Infected timber turns dark brown in colour.
  • Surface cracking where cracks follow the timber grain.
  • Hyphae strands which are light brown & yellow (a key difference from dry rot).
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
32
Q

How would you identify dry rot?

A
  • Found internally usually in poor ventilated areas.
  • Cuboidal cracking caused by shrinkage
  • Lightweight and crumbles.
  • Mycelium (Grey when wet and yellow when dry)
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
33
Q

What remedial works can you undertake for wet rot?

A
  • Remove the source of moisture.
  • Wet rot is limited to areas in which wood has become wet: therefore, size of outbreak is closely linked to extent of wetting.
  • Remove all rotted timber and replace – the wood that remains structurally intact and in a safe condition should be treated with a fungicidal spray to protect them whilst they dry.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
34
Q

What remedial works are available for dry rot?

A
  • Removing the source of moisture.
  • Dry rot can spread.
  • Remove all rotted wood by cutting away timber 300–450 mm beyond the last evidence of fungus or rot.
  • Applying a fungicide treatment to the remaining nearby timbers.
  • Ventilation must also be ensured to prevent further occurrences.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
35
Q

What other timber defects you are aware of? (excluding rot)

A
  • Structural damage.
  • Infestation (woodworm, furniture beetle, deathwatch beetle).
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
36
Q

Why was building paper used beneath the lead?

A

Reduces corrosive attack when laying lead onto the timber deck.

BS 1521:1972 Specification for waterproof building papers

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
37
Q

Was the root cause of the moisture ingress to the basement? Could it have been a building defect?

A

The cause of the ingress was through the natural rise of the water table allowing water to enter the structure through the defective waterproof system.

The drainage was also checked via a CCTV survey to rule out the potential of defective drainage.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
38
Q

You mentioned the issue with the cementitious tanking was maintainability, how would you prevent this from being punctured?

A

The system would have been recorded in the O&M (Operations and Maintenance) manual to prevent this.

However, cavity drained systems are not designed to keep ground water pressed behind once entered the structure – lower risk.

Cavity drained systems also have a series of inspection points for maintenance whereas tanking systems don’t and therefore leaks can often be difficult to trace.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
39
Q

What was the timeline for the window and basement repairs?

A

The works were undertaken concurrently.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
40
Q

How was CDM managed if the works were undertaken concurrently - who was principal contractor?

A
  • The works were generally short in duration 6-8 weeks in total.
  • The waterproofing works were concurrently alongside the window works.
  • The principal contractor was the contractor who installed the dormers who also undertook minor repairs elsewhere (decoration).
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
41
Q

Who accepted design responsibility for the basement solution, you or contractor, or consultant? How was this documented?

A

The design portion of the basement was covered by the consultant within the design portion of the contract.

This was satisfy their warranties.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
42
Q

What diligence did you undertake when selecting the consultant and the contractor?

A

Contractor
- The contractors were selected from my firms list of approved contractors.
- The contractors are required to submit a pre-qualification questionnaire.

Specialist
- The specialist waterproof consultant was selected from an approved list of installers found on the British Structural Waterproofing Association website.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
43
Q

What’s included within a Pre-Qualification Questionnaire?

A
  • Company Name /contact details
  • Type of organisation (sole trader /limited company)
  • Number of employees
  • Sub contractor arrangements
  • Insurance details
  • Accreditations (CHAS) /Membership of trade bodies (GAS Safe)
  • Training records (Asbestos awareness)
  • Experience
  • H&S policies
  • Convictions (fraud /bribery /money laundering etc.)
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
44
Q

What was the level of PI insurance the contractor and specialist contractor had and how did you asses this was reasonable?

A

£2million

Excluding the first £2500 each and every claim.

I considered this to be reasonable given the value of the works (circa £30k) and design liability.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
45
Q

How did you check the PI cover?

A

I checked the insurance documentation at high level ensuring that:
- Contractors name on the policy
- Date of commencement /expiry
- The amount of cover was deemed appropriate.
I sent the insurance details on to the client for their legal team to assess in more detail.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
46
Q

Whats the difference between Public Liability Insurance and Professional Indemnity Insurance?

A
  • Professional indemnity insurance cover claims made by clients for professional negligence.
  • Public Liability Insurance covers claims made by members of the public for injury or damage. (usually £5mil)
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
47
Q

How was the studwork fixed over the drainage channel?

A

The lower sole plate was be glued to the floor.

A noggin was placed slightly higher and secured into a plug to provide bracing.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
48
Q

How is the studwork fixed to the cavity drained membrane?

A

The stud is fixed via a plug and screw which is designed to form a watertight seal.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
49
Q

What is a listed building?

A
  • A designated building of Special Architectural or Historic Interest
  • Assessed by English Heritage and placed on the Statutory List of Buildings.
  • The authority for listing is granted to the Secretary of State by the Planning (Listed Buildings and Conservation Areas) Act 1990.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
50
Q

What Grades of Listing are there?

A

Grade 1: Exceptional interest.
Grade II*: Particularly important of more than special interest.
Grade II: Special interest

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
51
Q

What protection does listing give a building?

A

Buildings are listed to protect them from demolition or insensitive alterations.

This includes altering either outside or inside in any way which would change its character without written consent in the form of a Listed Building Consent.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
52
Q

What is the listed building or conservation area protected under?

A

Planning (Listed Buildings and Conservation Areas) Act 1990

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
53
Q

How did you know the building was listed?

A

Through knowledge of the area.

I checked the Local Authorities website and used their planning map search.

For further information I visited Historic England’s website to review the National Heritage List for England (official listing).

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
54
Q

Which part of the building was listed?

A
  • The listing protection applies to the whole building.
  • Including structures that are fixed or within the curtilage of the listed building.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
55
Q

Why was the property Listed?

A

Due to the special architectural and historical significance.

In 2005, ‘Reasons for Designation’ was added to the listing – as this property was listed prior to this date there was no indication as to why it was listed.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
56
Q

How did you identify the age of the building?

A

I identified the property was constructed circa 1850 through reviewing National Heritage List for England. (property listing)

I further researched local archives and the history of Winkley Square which was part of Preston’s residential expansion at the beginning of the 19th century.

I confirmed this during my site inspection by identifying typical construction detail:
- Solid wall construction
- Sliding timber sash windows (symmetrical – suggesting Georgian mid 18th Century)
- Slate roof covering

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
57
Q

What is a town house?

A

A tall, narrow traditional terraced house, generally having three or more floors.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
58
Q

What are the common defects you would find on an 1850s building?

A
  • Failure of slate roof covering through nail fatigue.
  • Damp issues due to the solid wall construction /insensitive repairs such as cementitious pointing.
  • Poor thermal performance of building materials.
  • Rotten timber windows and failed sash mechanisms.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
59
Q

How do solid walls work and why is cementitious pointing bad?

A
  • Lime mortar is applied to solid wall construction to allow the moisture to evaporate and move out freely.
  • When moisture levels are high the lime mortar can absorb water vapour preventing potential damage from moisture penetration.
  • When conditions are dryer, lime mortar releases the trapped moisture back to the environment.

With other types of mortar such as cementitious – moisture gets trapped within them which can lead to dampness and structural issues (freeze-thaw action)

Cementitious mortar is much harder than lime and less flexible. This may be incompatible with older bricks leading to spalling where the surface layer of the brick flakes off.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
60
Q

What is a mansard roof?

A

A mansard roof is a multi-sided hip roof with the lower slope at a steeper angle than the upper.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
61
Q

How did you obtain the client brief?

A
  • Upon taking the initial instruction from the management agent who had received various complaints of defects by the board of directors.
  • I arranged a MS teams call with the board and client prior to my site visit to ensure all issues raised were covered.
  • This also painted a clear picture of the scope of works and time spent to inspect to develop a fee proposal.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
62
Q

What were the client’s objectives?

A
  • To identify the cause of decayed timber windows and a feasible solution to remedy.
  • To identify the cause of damp staining to the basement.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
63
Q

What formed part of your desktop study?

A
  • I initially reviewed the site via google maps.
  • Reviewed the planning portal for details on the conversion works.
  • Reviewed National Heritage List.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
64
Q

What did you consider when preparing the fee quotation?

A
  • I considered the size of the building the complexity of the appointment taking into consideration the Listed Status.
  • I then considered the time required to complete the inspection.
  • Followed by correspondence with the local authority and specialist consultants.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
65
Q

Were there any limitations other than access to the rear?

A
  • One of the limitations were that I could not confirm the freedom of defects within the apartments I was unable to gain access to.
  • Limitations were set out in terms of the legal effect of the lease in relation to the service charge obligations.
  • I did not provide any advice weather or not it was the client’s responsibility for carrying out the repairs /liability to pay towards the costs.
  • It was apparent that costs were split between each apartment owner a sum of which had already been accounted for within the service charge.
  • However, to determine the fact on the service charge obligations was the responsibility of the client’s legal advisor.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
66
Q

What historical data did you use in your desktop study?

A
  • Local history archives
  • Historical maps
  • National Heritage List for England.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
67
Q

How did the historical data influence your approach to inspecting the building?

A

To determine which areas of the building was of potential historic significance and the original fabric of the building.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
68
Q

What was the specific methodology did you use for inspecting the building?

A

I adopted a top-down approach for the inspection, carefully examining the external areas beginning with the roof and working downwards followed by internal elements of the building.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
69
Q

What were the key elements you considered when managing the conservation and restoration of the property?

A

Key elements considered included:
- Minimising impact on the original fabric.
- Maintaining the architectural style,
- Compliance with heritage regulations
- Ensuring cost-effectiveness and sustainability.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
70
Q

Can you discuss the challenges presented by the fact that the building was located within a Conservation Area?

A
  • Adherence to regulations
  • Obtaining permissions
  • Ensuring that the works did not affect the overall character of the area.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
71
Q

How did you locate the windows to the rear mansard roof on your desktop study?

A

The client brief explained the location of the windows to be on the top floor of the rear out rigger.

I viewed the site with an aerial view from google maps and noted the windows to be part of what looked like a modern extension.

I then visited the local authority’s website and identified the extension formed part of the conversion works in 2002.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
72
Q

In terms of access, why was the vehicle height restrictors an issue?

A

To the rear of the building was a church hall with a pedestrian gate accessing the courtyard area to the subject property.

Therefore, the MEWP would have had to extend over the church hall and extend outwards towards the windows – given the size of machinery required to do this the vehicle height restriction of 2.5m was questionable.

This also prevented the risk of damaging the church building which had ornate features such as a cross on the roof top which would also have to be worked around.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
73
Q

What things would you consider when using a MEWP?

A
  • Ensure the ground is suitable for MEWP operation. It should be in good condition, flat and able to withstand the applied pressure of the platform.
  • Any outriggers being used must be extended and grounded before work commences.
  • Effective guardrails must be fitted to the platform.
  • A harness must be worn; this should be attached to a suitable anchor point within the basket so that the wearer cannot fall from the platform.
  • Avoid working in high winds as these can tilt platforms and make them unstable.
  • Nearby potential hazards must be assessed such as nearby overhead cables.
  • Ensure that the platform does not protrude over any traffic routes.
  • Permits are sometimes required for example for use on a high street.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
74
Q

Was the fee proposal altered when taking the decision to not use the MEWP?

A

The access limitations were identified during my desktop study which was undertaken prior to the fee proposal.

I therefore did not include the hire of a MEWP in the fee proposal.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
75
Q

Why did you undertake a desktop study prior to the fee proposal?

A

To review the site and gain a clear picture of the work involved to accurately quote for the instruction.

This included identification of the listing, conservation area, planning portal and access to the site.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
76
Q

You carried out a measured survey of the site – can you explain what processes you followed any why?

A

I followed the RICS Property Measurement guidance and measured the building in accordance with IPMS 1.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
77
Q

Why did you use IPMS 1 when measuring the building?

A

IPMS 1 is used to measure the Gross External Area which is required for planning permission.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
78
Q

How did you procure the works?

A

The works were procured via a traditional procurement method using a JCT Intermediate Building Contract with contractors design.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
79
Q

Why was a traditional procurement method used?

A
  • The client had greater control over the design.
  • Ensuring the design and scope of works were agreed in full prior to the works commencement.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
80
Q

Why was a JCT Intermediate Building Contract (with contractors design) used?

A

I reviewed the JCT decision tree and found this contract was the most appropriate to allow for a specialist contractor to be named to undertake and design the waterproofing works.

  • The Employer had the freedom to choose the sub-contractor for the specialist work.
  • The Contractor carries all the risk for the Named Specialist (except when the named specialist becomes insolvent).
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
81
Q

How did you manage the communication between the stakeholders?

A
  • I hosted an initial briefing meeting with both the client and board of directors. This enabled introductions and clear lines of reporting.
  • Although my client was Homestead it was a crucial part of the project to keep all directors informed.
  • I did this by hosting design meetings via Microsoft Team’s.
  • During the works, I sent out regular updates via email with all directors and the client in the email chain.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
82
Q

How did you monitor works progress and quality?

A

I monitored the works every 2 weeks and at key intervals such as:

  • Windows removed.
  • Before dressed with lead to ensure the timbers were as per the SE design and building control compliant.
  • I took photographs of the works at each stage which were used as evidence to support Building Control sign off.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
83
Q

Can you talk to me about the construction phase were there any issues?

A

The works were well planned and managed from the outset with defects identified.

This ensured a smooth running of the project with minimal issues.

The main issue I encountered was that the Local Authority no longer had a conservation officer employed.
This made communications difficult in relation to the heritage aspect from the outset.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
84
Q

Did the 5-week delay entitle the contractor to an extension of time?

A

No, the delay came to light prior to the works commencement date and therefore this was postponed.

The contractor was happy to delay the commencement date due to other workload.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
85
Q

Would the contractor been entitled to an extension of time due to the delay?

A

No, there was no contract in place at the time.

If there was a contract in place this would have been acceptable due to delays caused that were outside the contractors control.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
86
Q

What was the period of validity of the tender?

A
  • The period of validity was for 3 months.
  • This enabled the contractor to re-submit their tender on this basis, but they chose not to.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
87
Q

How did you manage the named sub-contractor?

A
  • The sub-contractor was managed under the principal contractor in which they included for management costs within their tender.
  • I regularly monitored all works on site.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
88
Q

How did you know it was wet rot to the window frames?

A

The exposed position of the windows and poor design of the angled casement allowed the windows to be consistently exposed to moisture.

The dark staining of the timber and evidence of warping to the glazing bars signified the high moisture content of the timber.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
89
Q

What are the conditions for wet rot to develop?

A
  • Excess moisture is present in timber over long periods of time.
  • Wet rot will begin to grow when the moisture content of the timber reaches around 50%.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
90
Q

How did you identify the cills were angled back?

A
  • There was rainfall in the early hours of the morning; I inspected mid-afternoon and there was evidence of ponding to the cills between the cill and the window bottom.
  • It was clear the cills were slightly angled back inline with the window position.
  • The rot to the frame was localised to the lower portion suggesting this was where water was holding /not discharging.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
91
Q

How did you identify a lack of maintenance to the timber windows?

A

The upper floor windows had clearly not been maintained in comparison to the decorative and overall condition of the lower floors.

I considered this to be due to the restricted access of the windows.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
92
Q

Were the current condition of the windows deemed to be an H&S issue and was this reported?

A

I raised immediate concerns with the client in relation to the significant decay noted to the frames together with evidence of detached timbers which were found in the courtyard.

As a result, I recommended the courtyard to not be used by the occupants until the area was made safe.

Scaffolding was erected shortly after which not only enabled me to carry out a closer inspection of the windows but also acted as a crash deck should any of the timber become loose or fall.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
93
Q

Why did you consider the shallow depth of gutter to be a contributory factor?

A

The depth of the gutter was around 10mm which during heavy period of rain was likely to overflow onto the windows.

Staining on the lead fascia suggested this had been occurring.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
94
Q

What depth should the gutter have been?

A

The gutters should prevent rainwater overspilling.

The depth of gutters is defined by factors such as:

  • Roof area
  • Roof pitch
  • The typical amount of rainfall in that area.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
95
Q

How did you determine the depth of the gutter and what should this have been?

A

I reviewed Approved Document H which provided guidance on the calculation of the drained area taking into consideration the rainfall in that area to determine the depth of gutter.

I consulted with a drainage engineer to undertake rainwater capacity calculations on the existing system.

This confirmed the existing depth was inadequate.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
96
Q

What depth should the gutter have been?

A

Typically, a depth of 50mm to prevent water over spilling on to the angled timber below.

The new dormer roof did not require a 50mm kerb due to the vertical window position and the roof discharging to the left and right cheeks.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
97
Q

How did you determine the timber windows were beyond repair and needed replacement?

A
  • The timber windows had extensive decay beyond the point which could be restored.
  • The decision was made to replace them based on the poor design.
  • Repair and retention would not have been a long-term solution for the client.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
98
Q

When is planning permission required?

A

If the work being carried out meets the statutory definition of ‘development’ set out in Section 55 of the Town and Country Planning Act 1990.

This is for works that will ‘materially affect’ the way the outside of the building looks.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
99
Q

What are the types of planning application can be made?

A
  • Full Planning Application: Proposals for developments which are not covered by a householder application.
  • Outline Planning Application: Outline planning applications are made to find out whether a development is acceptable.
  • Householder Planning Application: Used for developments such as garages, alterations and extensions.
  • Listed Building Consent applications: Required for alterations to, or extension or demolition of a Listed Building.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
100
Q

Why was a full planning application required at Winckley Square?

A

Any works relating to a flat requires a full planning application.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
101
Q

What is the timeline for planning permission?

A
  • 8 weeks
  • 12 weeks for more complex matters.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
102
Q

Did the LBC /Planning Permission have any conditions – what were these?

A
  • The development must be in accordance with the approved plans.
  • No materials shall be used other than those referred to on the approved plans.
  • Works started no later than 3 years from the date of acceptance.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
103
Q

What is pre-application advice – how did you apply for this?

A
  • Advise obtained from the Local Authority to determine the feasibility of the proposal.
  • Submitted relevant information (description of proposal, proposed drawings and material specifications).
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
104
Q

What are Building Regulations?

A

Building regulations ensure buildings are designed and constructed in line with set standards to ensure people’s health and safety.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
105
Q

When are Building Regulations required?

A

If the work being carried out meets the statutory definition of ‘building work’ set out in Regulation 3 of the building regulations, such as:
- Construction of a new building
- Extension or alteration of existing building
- Provision of new services or fittings such as heating systems, sanitary facilities replacement windows & doors.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
106
Q

What type of building regulation applications are there?

A

Full Plans: Plans are checked to comply with building regulations and approved before the work starts, preventing corrective works on site.

Building Notice: For works that are generally uncomplicated and the applicant has knowledge of the building regulations. The works do not require detailed drawings and building works can start within 48 hours of the local authority receiving the notice.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
107
Q

What did you include within the heritage statement?

A

The heritage statement included:
- The history of the building
- The current condition of the building
- Impact of proposed works on the historical fabric

Given that the works formed part of the modern extension that did not contribute towards the listing.
The heritage statement was proportionate considering that no parts of the original materials were to be changed.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
108
Q

Opt 1; you considered replacing the timber. What other advantages and disadvantages were there with timber rather than Upvc?

A

I considered that the timber windows would be in keeping with the local areas and existing buildings.

However, from a cost and quality perspective – timber windows often cost more than uPVC and then require further costs for maintenance.

Given the access restriction, this would not have been cost effective.

The one drawback in terms of maintenance when it comes to uPVC versus timber windows is the repairability of a timber frame. If you get significant damage to a uPVC window frame, you’re probably going to have to replace it.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
109
Q

With the replacement angled timber windows; How would an improved sill design be formed?

A

The timber windows would have been bespoke to suite the angled nature of the mansard roof pitch. (70-80 degrees)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
110
Q

If pre-application advice already told you that changing the windows for a different design was feasible – why would you keep the poor /angled timber design?

A
  • This was based on cost and ultimately trying to retain the existing style from an aesthetical point of view.
  • I proposed to install a built up timber kerb to prevent rainwater overspilling together with an improved sill detail to discharge rainwater efficiently.
  • Further considering this option, I took into account the maintenance requirements which ultimately weren’t feasible.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
111
Q

What is the Role Lead Sheet Manual and why did you refer to this?

A

The Role Lead Sheet manual is by the Lead Sheet Association.

This provides technical advice and detailed drawings for the application of rolled lead.

This manual contains technical information and designs of both inset and protruding dormers.

The advice given is as per BS 6915: Desing and construction of lead sheet roof and wall coverings.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
112
Q

Why did Option 2 (windows) have a higher risk of damp penetration?

A

I considered the risk of water ponding to the recessed reveals (internal corner) from driving rain.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
113
Q

Why did you dismiss the risk of damp ingress to the inset cill?

A

I contacted a technical sponsor from the Lead Sheet Association who advised that if the cill plate was a minimum of 50mm and dressed with lead in accordance with the Rolled Lead Sheet Association guidance the risk of ingress was negligible. (but ultimately there was still a risk present).

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
114
Q

Could an internal sill not have been formed for opt 2 (windows)?

A

Yes, although the sill would have projected from the windows which wouldn’t have been aesthetically pleasing and may have caused potential obstructions to the occupants and a risk of collision.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
115
Q

Why was removing the internal sill not practical?

A

On inspection I noted the owner of the apartment used the cill for storage of items particularly in the bathroom and kitchen.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
116
Q

Chosen window design; How did you identify the u-value requirements and what were these?

A

Approved document L (Volume 1) table 4.3.

  • Dormer cheeks to achieve a maximum U value of 0.18.
  • New flat roof to achieve a maximum U value of 0.16.
  • New windows to achieve a maximum U value of 1.4.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
117
Q

Were the u-values achieved?

A

Yes, the u-values for the roof were exceeded achieving 0.13 due to the insulated back plasterboard.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
118
Q

Do you need building regulations to install windows?

A

You need to comply with the thermal performance standards set out in the building regulations to install new windows.

However, if the installer is registered a FENSA certificate is provided to validate that the installer who fitted your windows or doors has complied with Building Regulations.

NOTE: FENSA is a government-authorised scheme.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
119
Q

What happens if no FENSA is in place?

A

You can apply to your local authority for a ‘Retrospective Building Regulation Compliance Certificate’.

This can take time and cost £300-£400

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
120
Q

What Building Regulations would you consider for windows?

A

Part L: Conservation of Fuel and power (maximum u-value 1.4)

Part F: Ventilation – All new windows are required to have trickle vents following recent.

Part K: Protection from falling collision and impact.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
121
Q

What Building Regulations were applicable to the dormers?

A

Part A: Structure
- Construction details of the dormers.
- Building Control requested structural engineer calculations for the dormers to be obtained and included within the design.

Part C: Resistance to contamination of moisture
- Condensation control measures for the dormer roof and cheeks.

Part L: Conservation of fuel and power –
- New external walls to achieve a maximum U value of 0.18.
- New flat roofs to achieve a maximum U value of 0.16.
- New windows to achieve a maximum U value of 1.4.
- Provide insulated cavity closers at jambs, sills and reveals.

Part F: Ventilation
- To provide trickle ventilation to all new windows.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
122
Q

How did the insulation depth affect the design?

A

When determine if to use a warm deck or cold deck roof.

The warm deck construction raised the profile of the roof.

When I drew this on CAD, I considered this would not be proportional to the size of the windows.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
123
Q

What’s the difference between a cold roof and warm roof?

A

Cold Deck
- Insulation between rafters.
- Through ventilation provided above the rafters to prevent condensation.

Warm Deck
- Insulation above the roof deck.
- Vapour control layer beneath insulation to prevent condensation.
- Whole structure is insulated enhancing thermal performance.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
124
Q

Why did you choose a cold roof?

A

I considered the depth of roof required for a warm deck would not be proportional to the mansard roof pitch and would encroach the existing roof line.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
125
Q

Are you aware of any guidance in relation to flat roof design?

A

BS6229: Flat roofs with continuously supported flexible waterproof coverings - code of practice.

Recent updates: AVCL – vapour barriers and vapour control layers are now redefined as Air and Vapour Control layers as they are recognised to perform in the same manner.

States cold roofs shouldn’t be recommended, it accepts this may not always be possible. This is due to the provision of a creating a cross-ventilated void above the breather membrane.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
126
Q

Why did you include insulated back plasterboard to the window head?

A

To prevent thermal bridging.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
127
Q

What is thermal bridging?

A

Where heat can by-pass through poor thermal efficient materials or there are gaps in building materials.

This affects the thermal performance of the building.

The internal temperature to this area will be less than the better insulated surfaces causing a risk of condensation where warm internal air comes into contact with the cold surface.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
128
Q

How did you obtain costs for the windows?

A

I obtained indicative costs from a local contractor selected from my firms approved contractor list.

They were chosen based on works carried out of a similar nature.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
129
Q

Could you not have obtained costs elsewhere? (other than local contractor)

A

I considered Building Cost Information Services (BCIS) but given the specialist works to the leadwork I decided it would be more accurate to obtain costs from contractors on this occasion.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
130
Q

How did you present the options to the client and stakeholders?

A

The options analysis was detailed within my report; my covering email suggested a teams call to run through each option with the building owners.

I shared each design during this meeting explaining the pro’s and cons of each option.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
131
Q

Did you advise Option 3 (windows) or did the client ask for option 3?

A

I recommended option 3 as the best option that would complement the local area and retain the use of the internal windowsill.

Option 2 and 3 were both feasible options and it came down to the owners preference and cost for the other building owners.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
132
Q

You had to get listed building consent for the windows, please describe the process from application through to completion of the project?

A
  • I engaged with the local authority in the early design stages.
  • I progressed the designs in consultation with the client and stakeholders.
  • I then submitted the application based on the chosen design.
  • After 8 weeks I received consent for both the planning permission and listed building consent.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
133
Q

Is there any dispensation for VAT on works to a listed building?

A

I believe there are exemptions; however, advising on VAT is outside of my competence and the client assessed this with their financial advisors.

134
Q

Why did you choose lead for the dormer?

A
  • Lead is a durable material.
  • Given the conservation area, lead was widely used this would have been in-keeping with the local area.
135
Q

Are there any health risks associated with working with lead?

A
  • Lead is a toxic material but only harmful if inhaled or ingested.
  • The risk of inhalation arises where lead is being melted, or through breathing in dust particles contaminated with lead.
  • The Control of Lead at Work Regulation 2002: Employees must be protected from lead.
136
Q

What are the different types of lead code?

A

Codes 3 – 8.

Depending on the thickness and weight.

137
Q

How did you determine which code of lead to use?

A

I reviewed the Lead Sheet Assosciation guidance.

This is determined by a number of factors:
- Exposure (sheltered or exposed locations)
- Listed or pre 1919 buildings.

138
Q

What code of lead was used for the roof and cheeks?

A
  • Code 6
  • As per the Lead Sheet Association guidance for specifying thickness of lead for various uses.
139
Q

What was the cost difference between Options 2 & 3 (windows)?

A

£1,300

140
Q

What was the cost for Option 1?

A

I didn’t obtain a quotation for Option 1 as ultimately this was not deemed a feasible solution.

141
Q

How did you identify the basement was damp?

A
  • The surfaces were heavily stained and damp to touch.
  • I also took readings with a moisture meter to the timber skirtings.
142
Q

Why did you instruct one of the maintenance team to open the wall?

A

The client’s maintenance team were on site to assist with access to locked areas and confirmation was sought by the client to open the areas up for further investigation.

143
Q

How do cavity drained membranes work?

A

They allow water to enter the property which is then managed through the perimeter drainage channel and out of the building via a sump pump.

144
Q

Where does the sump drain?

A

Into the storm drain – away from the property.

Residents can be fined for illegally connecting a sump pump to the sanitary sewer system.

145
Q

If the client would have provided a guarantee for the existing waterproof system would your advise change?

A
  • Waterproof systems are usually guaranteed for 10-years.
  • If the system was still under guarantee, the works may have been covered under poor workmanship.
146
Q

What building regulations did you consider for the basement?

A

Part C: Site preparation and resistance to contaminants and moisture.

I reviewed Approved Document C which then led me to BS 8102

147
Q

What are British Standards?

A

A national standards body for the UK producing technical standards for a wide range of products and services.

148
Q

What is BS 8102?

A

BS 8102: Protection of Below Ground Structures Against Water Ingress’

149
Q

What are the grades of basements defined in BS 8102?

A

Grade 1a: Seepage and damp areas are acceptable.

Grade 1b: No seepage but damp areas are tolerable.

Grade 2: No seepage but damp areas subject to internal moisture condensation is tolerable.

Grade 3: no water ingress or damp areas are acceptable.

NOTE: All properties used for residential purposes must be designed to Grade 3.

150
Q

What are the different types of systems available for waterproofing basements?

A

Type A: Barrier protection
Type B: Structural integral protection
Type C: Drained Protection
Combined Protection

151
Q

Who designed the waterproof system?

A
  • I provided the outline design for the proposals.
  • The specification of products and methodology of installing was undertaken by Peter Cox.
152
Q

Why did you need to involve a waterproof specialist?

A

BS8102 outlines the requirement to appoint a Waterproofing Specialist during the design phase.

A waterproofing specialist = suitably qualified and experienced.

153
Q

How did you appoint the waterproof specialist?

A

I reviewed a list of Waterproof Specialist via the British Structural Waterproof Association website.

Peter Cox was appointed by the client during the design phase.

154
Q

What was the cost for Option 1 (removal of the stone steps)?

A

I didn’t obtain a quotation for this option as I discarded this option fairy early in the design process for not being a proportionate repair solution.

This would not have been a cost-effective solution as per my clients brief.

155
Q

Did you not think Option 1 (removal of the stone steps) was a bit extreme?

A

This option would have provided a continuous system and would have been a belt and braces approach.

However, the cost and disturbance this would have caused would not be proportionate considering the use of the basement.

156
Q

What was the basement used for?

A

The basement was used to house the main services for the flats and various storage rooms for the occupants and cleaners cupboard.

157
Q

What building regulations relate to the installation of a new staircase?

A

Part K: Protection from falling, collision and impact.
- Maximum pitch of 42%
- Rise between 150mm and 220mm.
- Going between 220mm and 300mm.

158
Q

With Option 2 (cement slurry) Why did you suggest removing the existing wall membrane?

A

I considered issue with bonding the cementitious tanking to the membrane especially at the junction of the steps which were a weak point for ingress.

Upon reflection, the cementitious tanking could have extended partially up the wall behind the existing drained system.

However, the reason for departure of this option would have still been the same.

159
Q

Did you not consider an external tanking system?

A

I did consider this but ultimately discarded the option due to the significant disruption externally followed by the making good works required.

I was also mindful this was a Grade II listed building.

160
Q

What are other issues you can get from cementitious tanking?

A
  • Only withstand minimal movement. Buildings can naturally move slightly due to ground movement which can result in cracks to allow water to penetrate.
  • Follow on trades penetrating the wall.
  • Cracks can be caused by vibrations from the nearby Preston Train Station.
  • Hydroscopic pressure causing the water pressure to build up which usually then effects the floor. BS8102 includes recommendations to floors subject to water pressure.
  • If I was to proceed with this option – a structural engineer would have been appointed to advise on this further in relation to the additional pressure on the concrete floor.
161
Q

What were the Guarantee issues for the cement tanking system?

A

The waterproofing specialist advised that they would not guarantee the tanking solution as a single form of waterproofing used in a Grade 3 basement as per BS8102 combined protection would have been required.

162
Q

For your chosen option; Did the drained membrane increase step height? Was it compliant with regs?

A

The membrane plus the timber thickness increased the step height slightly.
I reviewed Approved Document K and ensured the staircase was compliant.
- Minimum riser of 150mm.
- Minimum going of 220mm.

163
Q

Could the membrane be damaged by the steps or was it protected?

A

The membrane was protected by the timber.

The timber was fixed through the membrane at vertical points only via fixing plugs.

Due to the nature of the system, the water would drain past the vertical point and not sit there – therefore, should the plug have failed, no water ingress would occur.

164
Q

Were the steps set to an angle, how did water not sit on the tred?

A

There was a slight slope built in to allow for water to run off.

This was less than 2 degrees.

Keep probing – I ran this by building control who advised this was acceptable.

165
Q

How are cavity drained systems maintainable?

A

A series of inspection ports are located to allow for inspection of the channels to identify any blockages due to the build-up of free-lime mortar.

166
Q

What is free lime build up?

A

Calcium oxide found within building products known as free lime.
Free lime passes through the structure by groundwater ingress, this then deposits within the drainage system.

167
Q

How can free lime build up be prevented?

A

By adding an anti-lime coating to the structure prior to the installation of membrane.

168
Q

Why did your chosen option provide a limited guarantee?

A

Confirmation could not be sought to confirm if the existing system had been designed in accordance with BS8102.

However, following the time of writing my case study, the works are now complete and have been signed off to warrant a 10-year guarantee.

169
Q

What were the limitations of the guarantee?

A

The guarantee was limited only to the works undertaken by Peter Cox.

The system must be inspected annually by an approved waterproof specialist.

170
Q

What is the difference between Guarantee and Warranty?

A
  • Guarantee is usually free (can be an implied or expressed promise)
  • Warranty typically includes a premium for the cover (like an insurance with written contractual promise)

The insurance-backed guarantee was provided to protect against poor design, workmanship and the installation of the product.

A product warranty was provided by the manufacturer. This does not protect against design /workmanship but offers a written promise for replacement if the product is defective.

171
Q

What is an insurance backed guarantee?

A

Guarantee: Insurance policy offered by the installers that covers the cost to rectify defective work or installations.

Insurance Backed: If the installer goes out of business the work will still be covered for the specified term of the guarantee.

172
Q

What would you do differently next time in terms of client brief?

A
  • I would define all stakeholder’s involvement.
  • Although the stakeholders were clarified during the brief; in hindsight I should have asked more questions in relation to the owners of which apartment.
173
Q

What have you learnt about BS8102?

A
  • The different types of waterproofing systems available.
  • The Grade of basements dependent upon use.
  • That water management system should be “serviceable and maintainable”,
  • To engage with a specialist early in the design stage.
174
Q

Why did you not expose more of the system?

A

To prevent causing too much internal damage – at that stage, I new it could have been 6-8 weeks before works commenced.

175
Q

Do you think exposing the wall more would have been necessary?

A

Yes, in hindsight this would have exposed more of the system and prevented any unforeseen damage to the system such as splits or tears.

The level of workmanship was clear, and for that reason this should have raised concerns about the whole system.

176
Q

How did you check the contractor had the skills to undertake the leadwork?

A

The contractor had undertaken schemes of a similar nature with leadwork in the past.

I checked recent case studies of works undertaken by the contractor.

I checked if the contractor had a CSCS (Construction Skills Certification Scheme) with a blue craft ‘skilled worker’ card for ‘Roofer-Specialist Leadworker’

177
Q

What is lead carbonate?

A
  • Falling rainwater contains dissolved carbon dioxide which attacks the lead resulting in a layer of lead carbonate.
  • Lead carbonate is a white, powdery substance. This can get washed down along the flashing onto the surrounding roof by rain.
  • Patination oil should be applied just after lead is applied to seal the surface from damp, so there’s never any lead oxide run-off.
178
Q

Can you name some lead defects?

A
  • Thermal Movement /Splitting
  • Underside Corrosion
  • Lead Carbonate
  • Sagging – Inadequate support
  • Leaching – Substrate starts to slowly take tiny amounts of lead into the concrete causing the sheeting to become fragile as it hollows.
179
Q

Why did you use building paper beneath the lead?

A

Allows for natural thermal movement of the lead.

Prevents a corrosive attack to the underside of the Lead Sheet.

This can be by acids present in timber woods (such as oak) and from glues commonly used in hardboards and plywood.

Also caused by Alkali`s from the drying cement below if laid on concrete.

179
Q

How would you identify a corrosive attack on lead?

A
  • White staining
  • Powder falling out at the laps and rolls
  • Ripples in the surface where it has thinned.

Corrosion can not always be obvious and lifting the lead sheet to inspect the condition of its underside is the only way to be certain.

180
Q

What would you consider if you saw white staining on the leadwork?

A

When lead sheets are first laid on a roof, white staining of corrosion will appear on the top side, but gradually the lead combines with carbon dioxide in rainwater to build up a protective layer of lead carbonate.

On the underside, where no carbon dioxide is present, any condensation will begin the corrosion process (use building paper).

181
Q

Does lead sheet corrode?

A

Yes, this can be caused by underside (condensation)

Top side corrosion can be caused by falling rainwater contains dissolved carbon dioxide which attacks the lead resulting in a layer of lead carbonate.

This gradually thickens to form a protective layer preventing further attack.

182
Q

Was the lead treated following installation?

A

Yes, a Patination oil was applied to seal the surface from damp and prevent lead oxide run-off.

183
Q

What works do not require listed building consent?

A

Maintenance and like-for-like in-situ repairs that do not affect the character of the building.

For example, repainting or in-stitu timber repairs.

These works, should use the same materials and techniques used in the original construction of the building.

I would seek advice from the local planning authority.

184
Q

Did the waterproofing system require listed building consent?

A

No, I contacted the local Conservation Officer who advised the works would be considered as ‘repair works’.

Also, given the ongoing threat to the building caused by the internal moisture ingress, I was advised by the local authority that the works were ok to commence without listed building consent as this would be in the best interest of the building.

This was put in writing by the Local Conservation Officer.

185
Q

How did you ensure good client care with all stakeholders?

A
  • Keeping in regular contact with them.
  • Explaining the defects and design options in full with the use of drawings over a Microsoft Teams call.

Anything else; not acting outside my level of competence by getting a waterproofing specialist on board during the design phase.

186
Q

What would you say was the most challenging part of communicating with all stakeholders?

A

Keeping all stakeholders informed.

Ensuring the designs and cost satisfied all of them.

187
Q

Why was Code 6 lead needed?

A

I reviewed the guidance and reccomendations in the Rolled Lead Sheet Manual.

This took into consideration:
- What the lead was being used for.
- Exposure (sheltered, moderate or severe).
- Listed or pre-1919 buildings.

188
Q

Why does condensation develop?

A

Where warm air collides with cooler surfaces.

The air cools down below its dew point and cannot retain the same amount of water vapor as it could when it was warmer.

The excess moisture then shifts from a gas to liquid resulting in the development of droplets of water on the cold surface.

189
Q

What is interstitial condensation?

A

Interstitial condensation occurs when moist air transfers through the building fabric and there is a temperature difference.

If the temperature drops sufficiently, the dew point may be reached within the fabric and condensation will occur.

190
Q

Can you explain the construction build up of the dormer?

A

From the internal face:
- Insulated-backed plasterboard connected to the existing insulated plasterboard (with in-built vapor control layer).
- Timber frame fixed to the existing timber structure.
- Insulation between the timbers.
- 50mm air gap between the insulation and roof deck vented to the dormer eaves.
- 25mm air gap between the insulation and timber cheeks vented from the bottom of the cheek to the eaves.
- 18mm plywood substrate
- Class A building paper
- Code 6 lead.

191
Q

Was a vapour control layer included?

A

Yes the insulated plasterboard had an in-built vapour control layer.

192
Q

Why are vapour control layers important?

A

Installed on the inner, warm side of the insulation to reduce the risk of condensation within the roof structure.

To prevent warm, moist air from diffusing into the structure and condensing into water when it hits a cold surface (due point).

193
Q

Would your advice change if the building wasn’t listed?

A
  • Concerns over poor design and maintenance restrictions would have remained the same.
  • The access and maintenance restrictions of the timber would have remained the same.
  • The advise /design therefore would have been the same.
194
Q

If the sub-contractor caused any delays to the project what would happen?

A

I would investigate why the subcontractor was not meeting their deadlines to define whether the fault is due to issues within their control or if the delay is caused by other factors.

If the delay is caused by reasons beyond the subcontractor’s control, they may be entitled to an extension of time to complete their work.

The subcontractor’s contract would usually have a delay penalty clause. This means that for every day the work is delayed, the subcontractor will have to pay a fixed amount stated in the contract as ‘liquidated damages’.

195
Q

What’s the difference between named /nominated subcontractors?

A

Named Subcontractor:
The client names a short-list of subcontractors that would be acceptable to them in the tender documents. The responsibility for their performance with the main contractor.

The client names at least three companies from which the contractor chooses one to be the sub-contractor.

Nominated Subcontractor:
The client may wish to select (nominate) a subcontractor, rather than allowing the contractor to select them.

Ultimately, the nominated subcontractor is still appointed by the main contractor, but they are imposed on them by the client.

JCT contracts no longer include provision for the nomination of sub-contractors.

196
Q

What were the limitations of using a Pole Mounted camera to inspect the windows?

A

Unable to physically check the timber for moisture readings and to feel the timber ‘tap test’ for durability.

197
Q

What is your understanding on conditions attached to a planning approval and how can these impact the works?

A

Section 106 of the Town & Country Planning Act: A planning obligation subject to conditions, it can specify restrictions.

  • Restrict the development or use.
  • Require the land to be used in any specified way
  • Require a sum to be paid to the authority on a specified date or dates or periodically.
198
Q

What diligence did you undertake when selecting the consultant and the contractor?

A

Contractor:
- Approved contractor list (PQQ)
- Undertaken schemes of a similar nature

Consultant
- Approved contractor from the British Structural Waterproofing Association website list
- Requested case studies

199
Q

What other advantages and disadvantages were there with timber rather than Upvc?

A

Disadvantages
- maintenance (8-10 years painting depending on exposure)

Advantage
- frames could easily be repaired (rather than replaced)
- sympathetic towards the listed building and conservation area.

200
Q

What was the guarantee issues for the tanking system?

A

The waterproofing specialist would not guarentee this as a single form of waterproofing system for residential use.

BS8102 recommends the use of a maintainable system - the inability to maintain a tanking system restricts this requirement.

201
Q

If the timber windows could have been repaired; would this require listed building consent?

A

Depending if the works could be carried out in-situ using the same materials then no.

However, given the level of decay the windows would have required removal and repairing off site which would require LBC.

202
Q

Why did you consider that the timber windows could not be repaired?

A

Repairing the windows would have still retained the poor angled design and therefore would have been a short-term repair that would have costed a lot given then significant amount of decay.

Windows would have required removing and repairing off site.

The issue of future maintenance of the timber through access difficulties.

203
Q

What is BS 6915?

A

Code of Practice for installing rolled lead sheet roof and wall coverings that are fully supported.

204
Q

How did you measure the curved wall to the basement?

A
  • Measured the distance across from the outer edges of the curve to get its width.
  • At the midpoint, I measured the depth of the curve (Using a long straight edged level)
  • Delivered the measurements for the width of curve and depth into CAD to identify the radius.
205
Q

How did you determine the existing construction?

A
  • Through site inspection and measurement.
  • Reviewing the previous building control drawings for the extension.
  • Provided by the client upon request.
206
Q

How would you seal, prime and decorate timber? What’s the process?

A
  • Seal all knots with a spot primer (prevent the knot bleeding – resin compound)
  • Apply two coats of sealer to protect the wood /create a barrier.
  • Apply primer to enhance adhesion /return tooth to the surface and optimise paint colour.
  • Paint the timber as per manufacturer instructions (usually two /three coates)
207
Q

How would the retrofit timber kerb fix to modify the gutter?

A

Mechanically fixing a 50mm timber kerb to the existing gutter base and re-dressing with lead.

208
Q

Option 1; why did you not replace with uPVC windows at an angle?

A
  • uPVC windows are not designed to be installed on an angle.
  • I did consider the option to install a roof lights /velux which I considered would not be in keeping with the mansard roof design /local area.
  • Replacement timber windows would have been bespoke made /modified on site to create a suitable sill detail.
209
Q

How far should a sill project?

A
  • Sill to project beyond the wall by at least 25mm.
  • Ensure the water drip projects at least 10mm beyond wall.
210
Q

When is tempered glazing required for windows?

A
  • Safety glass for glazed areas lower than 800mm from finished floor level.
  • Glazing to critical locations must be in accordance with BS 6262.
211
Q

What angle should a sill be to discharge rainwater?

A
  • The sill should be set at a sufficient angle to discharge water away from the frame.
  • This is typically around five degrees.
212
Q

Option 2; how was the existing opening going to be modified?

A
  • The jambs insulated and boarded with 18mm plywood.
  • The sill boarded with a 50mm sill plate beneath the window.
  • Sill & Jambs dressed with lead in accordance with the Lead Sheet Association.
  • uPVC double glazed window installed vertically to the inner edge.
213
Q

Option 2; what were your concerns with water penetration /driving rain to the recessed lead sill and jamb detail?

A

This design formed an internal corner which posed a higher risk of rainwater pooling from driving rain.

214
Q

Option 2; how did you identify the risk of water penetration was negligible?

A

I contacted a technical sponsor from the Lead Sheet Association. Who advised:
- 50mm sill plate between the sill and window dressed in Code 6 lead.
- Lead welded gusset to the corner of the cheeks for additional protection against wind-driven rain.

However, given the design of an internal corner there was still a risk of penetration from wind-driven rain

215
Q

How was the lead joined?

A

The lead sheet was bossed in position.

Where minor lead welds were required; this was done off site to reduce risk of fire.

Should the works require welding in position a hot works permit would have been in place and strict instructions to carry out welding in the morning an no less than 1 hour before work ceases as per Lead Sheet Association guidance for fire precautions when lead welding.

216
Q

What is a hot works permit and when would this be required?

A

Required for any works involving open flames or producing heat and/or sparks (cutting or welding).

Hot Works Permit provides control measures with precautionary checks before and after the welding process.
- Spray water before welding.
- Never leave flame unattended.
- Two fire extinguishers close to the works.
- Thorough checks before leaving site.

Must be prepared by a competent person.

217
Q

What maintenance is required for uPVC windows?

A

Very little maintenance required:
- Clean down with reach and wash pole system.
- Maintain the functioning components internally.

218
Q

How does a cavity drainage system work?

A

Cavity drainage membranes manage the passage of water through the structure to the perimeter drainage channel and out of the building via the sump pump.

219
Q

Option 3; Why were the laps taped – would it not have been better to replace the wall membrane?

A

I considered ‘Time, Cost & Quality’

Although replacing the wall membrane would have improved quality with less risk – the time and expense to replace would not have been acceptable given the use of the basement and isolated are of ingress.
The tape is a recommended method of joining the membrane under BS8102 /Manufacturers instructions.

220
Q

Do you think the uPVC windows complimented the local area /listed building?

A

The new windows reflected the existing style of the timber windows but provided a long term-solution for maintenance purposes.

The rear extension was constructed in 2002 and therefore did not contribute towards the listing of the building.

221
Q

What insulation specifications did you obtain for the dormer?

A

I obtained three insulation specifications to achieve the u-value requirements in Part L (0.18).
- Warm deck (vented as per RLSA guidance)
- Cold deck (150mm insulation between roof timbers)
- Cold deck with insulation between roof timbers and insulated back plasterboard to the head.

222
Q

What U-Value did the dormer achieve?

A

Roof: 0.13 (exceeded the 0.16 required). 105mm insulation in total.
Cheeks: 0.18
Windows: 1.4

223
Q

How did the dormer roof discharge rainwater?

A

Tapered firings were installed to discharge rainwater to the left and right sides of the dormer.

BS 6229 recommends that a flat roof should have a minimum design fall of 1:40 to ensure a finished fall of 1:80 can be achieved,

224
Q

Where did the sump pump discharge to?

A

Away from the building.

The sump pump discharged directly to the storm drain, so the water can be taken away with the rest of the rainwater.

225
Q

How does a sump pump work?

A

Installed at the lowest point of a basement.

When water drains to the sump chamber, the pump then ejects the water away through internal pipes to a safe evacuation point like an external drain.

These pipes are fitted with one-way valves to stop water flowing back into the basement.

226
Q

Foundation detail unknown; what kind of foundations would typically be found in an 1850’s building?

A

Typically spread brick footings.

227
Q

Option 1; what are the requirements for a new timber staircase?

A

I would review Approved Document K to consider:
- Rise: between 150mm and 220mm
- Going: between 220mm and 300mm
- Angle: not greater than 42 degrees
- Kite winder: 50mm minimum tread width at the narrow end
- Headroom: two meters headroom at all points from the pitch line.

228
Q

How was the studwork fixed over the perimeter drainage channel?

A

The lower sole plate was glued to the floor with a noggin placed slightly higher and secured into a plug to provide bracing.

229
Q

How are timber floorboards fixed over the cavity drained membrane?

A

In this instance it was plywood and vinyl flooring.

Marine-grade plywood cut to size and laid over the membrane and the boards would be nailed to the plywood.

230
Q

Option 1; what would you consider before excavating for the drainage channel?

A

The structural impact of the floor.

In this instance, the drainage channel was laid over the floor slap with a sacrificial screed bonded to the slab and the membrane laid over the top.,

231
Q

Explain the build up of a cavity drained system?

A
  • Anti-lime coating applied to the walls.
  • Membrane fixed with membrane sealant plugs.
  • Waterproofing tape to any overlapped joints.
  • Timber battens fixed into the plugs without piercing the membrane.
  • Rigid insulation (closed cell) between the studs (highly resistant to water absorption /vapour – not like mineral wool) – leave a gap for ventilation.
  • Vapour control layer sealed at joints with an aluminium foil tape.
  • Plasterboard & skim
232
Q

What was the basement used for?

A

Mains services for each apartment.
Storage /cleaning cupboards.

233
Q

What types of waterproofing systems are identified in BS 8102?

A

Type A: Barrier System /Tanking

Type B - Structurally integral protection (Usually water resistant concrete /waterproofed by design).

Type C - Drained protection. /Cavity Drainage

234
Q

What Grades of basement are defined in BS 8102?

A

Grade 1a: Seepage is acceptable.

Grade 1b: No seepage but damp patches are tolerable.

Grade 2: No water penetration acceptable but moisture vapour tolerable.

Grade 3: No seepage or damp is acceptable – all residential properties should be designed to grade 3.

235
Q

What is a cementitious tanking slurry made up of?

A
  • Portland cement
  • Aggregates
  • Chemical modifiers
236
Q

Why was the client unable to maintain defects with the tanking system?

A

A slight crack or pin hole will puncture the tanking causing ingress.

A punctured Cavity drained membrane may not cause ingress as they are not deisnged with withold water behind and instead water moves freely past. CDM are generally forgiving of damage and movement.

237
Q

Why did you consider that the tanking couldn’t be terminated to the membrane?

A

The adhesive bond between the tape and concrete.

The manufacturers instructions recommends that the tape is used to bond membrane to membrane only.

238
Q

How would you prevent follow on trades penetrating the tanking?

A

Recording this in the O&M manual (Operations and Maintenance Manual.)

To make all maintenance operatives aware.

239
Q

Option 3; How far did the membrane overlap the existing system?

A

Overlaps were to be a minimum of three rows of studs.

The joint is then formed by using the waterproofing joint tape.

240
Q

Why did you consider that the existing waterproofing system hadn’t been installed and designed correctly?

A

The level of workmanship came into question given that the membrane hadn’t been bonded to the steps.

Also the poor design of angled timber windows during the same renovation.

241
Q

How did you know if your client was satisfied with the design /outcome?

A

The design satisfied the client requirements and all stakeholders were satisfied with the cost.

Client feedback was obtained following the works and I received good feedback.

242
Q

How long was the rectification period? Were any defects identified /how did you determine this?

A

12 months from the “date of practical completion of the Works”.

No defects were noted; the basement walls remained dry.

243
Q

Were there any specific terms and conditions attached to the guarantee?

A

The guarantee was limited only to the works undertaken by the specialist and not the existing system.

The system should be inspected every 12 months.

244
Q

Was your client happy with a limited /5 year guarantee?

A

Yes, to satisfy a 10-year warranty this would have required a full replacement system which they agreed would not be a cost-effective solution taking into consideration the use of the basement.

245
Q

How did you distinguish the water table /rate of ingress?

A

BS8102 recommends that designs account for the likely highest level of the water table and periods of heavy rainfall to deal with all eventualities given the current climate change issue.

246
Q

In the future; how will you clarify clear lines of communication during the initial stage of client engagement to define all stakeholders?

A

Ask more questions surrounding the stakeholders and their level of involvement to ensure a clear picture of who the works will affect.

247
Q

Did you not consider a wood grain effect uPVC?

A

The plain white uPVC satisfied the client and conservation officers requirements.

Therefore I considered the additional costs for a wood grain effect wouldn’t be necessary.

248
Q

Were any repairs undertaken to the flat roof?

A

The coating to the flat roof had delaminated - while the scaffold was in place the client opted to have the flat roof re-coated while access cost has been catered for.

Didn’t require LBC as considered maintenance.

249
Q

I noticed a boiler flue - what were your considerations with this and the windows?

A

There should be a space of at least 300mm above, below or to the side of any window /door opening.

250
Q

Who appointed the waterproof specialist?

A

During the design phase; the waterproof specialist was appointed by the client.

The waterproof specialist was appointed to develop the design /specification of waterproofing materials.

251
Q

If you appointed the waterproof specialist what would you need?

A

Sub consultant agreement.

  • This is where the client wants the firm to appoint a sub-consultant to undertake a portion of the services.
  • Agreeing the scope of services and fee while creating a contractual link with the sub-consultant.
252
Q

What foundations would typically be found in an 1850s property such as this one?

A

Spread brick footings.

It may also be possible for no foundations to be present and the basement walls functioning as the foundation.

253
Q

What is a certificate of lawful development?

A

Certificate of Lawfulness of Proposed Works to establish whether proposed works to a listed building would be lawful.

i.e. they would not affect the character of the listed building therefore, would not require listed building consent.

Note: Applications for Certificates of Lawfulness of Proposed Works cannot be submitted in respect of works which have already been carried out.

254
Q

What is the average life of timber windows /uPVC windows?

A

This can vary depending on exposure and maintenance but generally:

Timber Windows: Up to 60 years.

uPVC Windows: 25-30 years on average.

Note: timber windows can be repaired as opposed to uPVC where they often require replacement.

255
Q

What would you have done differently if the building wasn’t listed and just in a conservation area?

A

I would have considered the special importance of the area and how the design would have contributed to this.

This would have been determined by the Local Planning Authority and would not require listed building consent.

Delt with together with the Planning application - separate conservation area consent has been abolished.

Permitted development rights are more stringent in conservation areas - dormers would fall under PD in a conservation area.

256
Q

What type of guarantee was provided for the waterproofing system?

A

An Insurance Backed Guarantee for 5 years.

This provided protection against poor design, workmanship and the installation of the product even in the event of the firm ceasing to trade.

257
Q

The original timber windows appeared to be in relatively good condition – what did you think led to the accelerated deterioration of the windows to the mansard roof?

A
  • The exposed location of the windows.
  • Poor angled design.
  • Lack of maintenance.
  • Orignal windows were likely to be hardwood and the modern windows soft wood.
258
Q

How would you determine the difference between hardwood and softwood?

A
  • Grain: Softwoods have a softer grain than hardwoods.
  • Colour: Hardwoods tend to be darker than softwoods.
  • Hardness: Hardwoods are stronger, more scratch resistant. If the wood chips easily with a chisel, it’s most likely a softwood.
  • Weight: Hardwoods are usually heavier than softwoods.

To distinguish the difference the species of the tree that the wood came from would need to be identified.
- Hardwoods come from trees that have broad leaves often fall every autumn.
- Soft woods are evergreen such as confiers with green needles all year round.

259
Q

What are the disadvantages of soft wood?

A

Hardwoods are denser than softwoods, making them stronger and more weather resistant.

260
Q

Key Issue 1: Option 1 – what timber did you propose to use?

A

Hardwood taking into consideration the exposed location and restricted access for maintenance.

Given the poor angled design and restricted access I thought uPVC would be a more feasible option.

261
Q

What did you prepare before the construction works?

A

I assisted the client with putting together the pre-construction information.

I prepared a designer’s risk assessment (for the PD).

262
Q

What’s the purpose of a Designers Risk Assessment?

A

To inform the Client and Principal Contractor of potential health and safety risks from the design that need to be considered and managed on site and during the use of the building.

263
Q

Following the works at Winckley Sq, how did you know the client was satisfied with the works?

A

The design and results satisfied the clients objectives.

Client Performance Feedback was obtained to gather feedback from the client.

This was carried out by an independent person to encourage open discussions with the client to ensure satisfactory service is delivered and that goals are achieved.

264
Q

You mentioned the tanking slurry wasn’t a maintainable system, can you expand on this?

A

Cavity Drained Systems (Type C) include drainage channels which have accessible Inspection Ports to allow for the system to be accessible and maintainable.

Tanking ‘Type C’ systems without drainage channels are not maintainable and fall off the recommendations within BS 8102:2022.

BS8102 recommend a maintainable system to be installed where the basement designed to a Grade 3 basement. (residential use, no seepage or damp staining acceptable)

265
Q

Did you consider opening up the frames further to rule out further rot?

A

The inspection was via a pole-mounted camera so I couldn’t physically inspect them.

I inspected the windows internally but given the level of rot I considered it wouldn’t be wise to open the windows.

When scaffold was erected and the windows were removed I inspected the frame and did not identify any decay, cracking or warping.

266
Q

What was the contractor entitled to because of the delay caused by the change of window design?

A

The delay was during the design phase – this delayed the start date /completion date back by 5 weeks.

267
Q

What material did you specify for the dormer insulation and why?

A

Wood fibre insulation board.

Can be laid to be tight fitting to reduce gaps and unwanted air infiltration.

Vapour permable; allowing the insulation to breath and allow moisture to evaporate (unlike PIR Boards) which I considered to be appropriate, especially to the kitchen and bathroom windows.

Sustainable; Wood fibre is 100% recyclable.
Wood fibre insulation is recommended under Historic England Advice note: Energy Efficiency and Historic Buildings.

Note: Rockwool can be a mild irritant and although also recyclable (natural stone) wood fibre came out on top.

PIR boards contain chemicles which can take hundreds of years to break down in landfills.

268
Q

What fire considerations did you have with the dormer?

A

Means of Escape: The windows were not required for a means of escape as identified in the fire strategy.

Combustibilty of materials: Timber frame and wood fibre insulation: the insulation charrs in the event of a fire restricting spread of flame and does not drip during burning, unlike some rigid foams.

269
Q

Is there any guidance you are aware of for carrying out insulation works to a listed building?

A

Historic England Advice note: Energy Efficiency and Historic Buildings

270
Q

Is there any documents you could refer to for investigating moisture ingress in the building?

A

Joint Position Statement: Investigation of moisture and its effects on traditional buildings

This document provides best practice for inspection of traditional buildings.

This considers a ‘whole building approach’ when identifying the cause of moisture ingress.

271
Q

What should be considered when inspecting a traditional building for moisture ingress?

A

The source of moisture.

I am aware of the Joint Position Statement which recommends to consider:
- The construction of the building (construction new /old)
- Understanding moisture-related defects
- Condition assessment
- Diagnosis and recommendations
- Legal requirements
- Report

272
Q

What is a traditional building?

A

Solid wall construction built from permeable materials sush as brick, stone and timber.

In traditional buildings, water enters and exits the building fabric as conditions become wetter and dryer.

Modern materials have impermeable barriers to prevent moisture entering all together.

273
Q

Was there a damp proof course present?

A

No, the building was constructed in 1850.

DPC became mandatory in 1875 under the Public Health Act 1875

Early DPC’s were commonly slate, blue engineered bricks or bitumen.

There was a remedial DPC injection that had previously been installed in an attempt to remedy the damp to the basement – this was ineffective.

274
Q

How were the works procured at Winckley Square?

A

Single stage tender to obtain a competitive price.
- The contractors received all detailed information to assits with costing.
- This provided the client with certainty over costs.
- Designs were agreed with the client involvement and local authority approvals.

275
Q

Under the RIBA Stages; when is single stage tendering carried out?

A

Stage 4
- The contractors received all detailed information to assits with costing.
- This provided the client with certainty over costs.
- Designs were agreed with the client involvement and local authority approvals.

276
Q

Under the RIBA Stages; when is two stage tendering carried out?

A

This enables the design and tendering to overlap (due to time constraints)

Issued at Stages 2-3 then the selected contractor works with the project team to develop the design in Stage 4.

277
Q

How did you undertake the measured survey and what equipment did you use?

A

I used a laser disto and tape measure.

I measured the property in accordance with IPMS 1 as the plans were used for planning purposes.

278
Q

Is there any other way you could have inspected the windows from ground level?

A
  • Drone

This is something my firm is looking to invest in near future in which surveyors will be sent on courses.

I am aware of the RICS insight paper on Drones: Applications and compliance for surveyors.

279
Q

What is an insight paper?

A

The fundamental purpose of Insight papers is to raise awareness of significant topics and trends in emerging themes and markets

280
Q

What was the cause of the water ingress and how was this determined?

A

Lateral penetration through the natural rise and fall of the water table.

A CCTV drainage survey was undertaken to confirm freedom of defect.

281
Q

How did you measure to IPMS 1 to identify the external wall of the basement?

A

By extending the exterior plane of the perimeter walls at ground floor level downwards.

This was an estimation of the wall thickness which was stated on the drawings.

282
Q

Who was the Guarantee holder for the waterproofing system?

A

The property management company: Homestead Consultancy Services.

I enquired with the waterproofing consultancy who advised the guarantee was transferable should Homestead’s Appointment terminate.

283
Q

Did the owners of the apartments rely on your advice?

A

The advice was given to the client which was then disclosed to third parties by the client.

This was made clear in the terms of engagement that the advice may only be relied on by the named client.

This protects the firm from third parties who may look on the advise differently /bringing claims against the firm.

284
Q

How did you identify it was the clients responsibility to pay towards the cost?

A
  • This was confirmed during the client brief.
  • Limitations in the terms of appointment stated that ‘no due diligence had been undertaken in regard to the legal effect of the lease’ and it was the responsibility of the clients legal advisor.
  • The client obtained independent legal advice relating to service charge obligations.
285
Q

If warranties were available for the waterproofing system; what would your advice have been?

A

I would have reviewed the warranty at high level to see if still valid, and any obvious omissions.

A detailed assessment would have been undertaken by the clients legal team.

286
Q

Was there a requirement for a handrail following the completion of works?

A

The handrails weren’t removed to facilitate the works.
I am aware of the requirements in Approved Doc K:
- Continuous handrail
- Positioned 900mm – 1m above the pitch line.
- If stairs are wider than 1m handrails are required either side.

287
Q

In relation to access; could you not have used a sub-contractor for a drone?

A

I considered the cost of a sub-contractor to undertake this would not be necessary given that I had access to a pole camera.

288
Q

What is a Mansard Roof extension and how are they constructed?

A
  • To provide additional head room in the roof space to provide additional accommodation.
  • The mansard was of timber frame construction.
  • I am aware they are typically built off the existing wall plate with a high pitch rafter (around 60-70deg).
  • Connected to internal partition head plate.
289
Q

How did you collect the client brief and how did you determine what was required?

A
  • I took the initial client brief from the property management company and arranged a Teams call with the building owners.
  • During the meeting I listened and asked questions to determine the scope of services required.
  • Following the meeting I confirmed the brief via email and a fee proposal and terms of engagement.
290
Q

What fall did the flat roof /gutter above the dormer have to achieve?

A

Minimum fall of 1:80

BS 6229: Requires 1:80 anywhere on the roof which includes internal gutters.

NOTE: Flat roofs should be designed with a fall of 1:40 to ensure a 1:80 fall is achieved once the roof is completed.

291
Q

In your service proposal was there a limit of indemnity and how was this set?

A

Yes there was a liability cap up to £1million pound.

This was set by the director where the liability cap is determined on a case by case basis.

292
Q

What is indemnity?

A

Protection against a financial loss caused by negligence.

293
Q

What typical defects could you find with drainage?

A
  • Blockages
  • Collapsed /damaged drainage channels
  • Incorrect gradients /falls
  • Tree roots penetrating
294
Q

What were the drainage channels made of?

A

The drainage structure was an underground culvert made up of brickwork draining to the River Ribble. (typical for Georgian engineering)

The drainage system had been reinforced with concrete following restoration works to Winckley Square in the late 19th century.

295
Q

What is hydrostatic pressure and why is this an issue?

A

Groundwater pressure in the soil which has nowhere to go.

This causes the water it to force itself against the basement walls causing cracking /bowing.

296
Q

Was there a contractual link between the property management company and building owners? /What would have happened if the property management company went into liquidation?

A

There was a property management agreement in place between the management company and building owners.

A property management agreement is a legal document that defines a contractual link between the property owners and a property management company.

This contract contains the terms and conditions under which the manager agrees to manage a property on behalf of the property owner.

This agreement would have outlined the termination /payment structure which was dealt with the clients legal team.

297
Q

What were the key drivers in relation to time, cost and quality - how did you determine that?

A

Quality was key during this project to deliver a design that would compliment the historical importance of the building and to protect the building fabric for the future (damp issues).

Time: The pre-construction phase was completed between December – March ready to commence works in the summer months. This prevented another winter causing further issues from weather.

Cost: The total of all works including professional fees was £27k which aligned with the client budget of £30k.

298
Q

What is a water table and how do you determine the depth of this?

A

A water table is the boundary between water-saturated ground and unsaturated ground.

The water table can fluctuate as water seeps downward from the surface and therefore waterproofing systems should be designed to account for a full height water table und BS 8102.

299
Q

Which window design would thermally perform better?

A

Option 2 as the window would have been inline with the thermal element.

To overcome this; the dormer cheeks were insulated connecting to the existing insulation.

300
Q

What considerations under Approved Doc K did you have for the windows?

A
  • Windows were above 800mm from ground level so not considered critical location.
  • Protection from collision – windows opened outwards.
  • Window restrictors were installed to prevent the risk of injury /falling. Windows with restrictors can only be opened by 100 mm or less.
301
Q

What part of the building was listed?

A

When a building is listed, it is listed in its entirety.

This includes:
- Internal /Externally
- Any structure fixed to the building
- Structure within the curtilage of the building (which formed part of the land since before 1 July 1948).

302
Q

Were any statutory consents required for the opening up works?

A

I contacted the local conservation officer who advised that prior approval was not required this was because:

The plastered wall were a later addition that did not contribute towards the listing.

The ongoing threat to the building condition due to the water ingress took precedence.

303
Q

How did you access the windows to inspect them?

A
  • Pole mounted camera from the rear courtyard.
  • I also viewed the windows internally but did not open them given the poor condition noted.
304
Q

What Insurance Option in the JCT was selected and why?

A

Option C: Employer required to take out a Joint Names Policy for All Risks insurance for the Existing Structure and Works.

Option A & B are for the use in the case of new buildings.

The employer consulted with their insurance advisor on this matter.

305
Q

What are some of the problems associated with tanking?

A

Basements can be vulnerable to vibrations in the ground; and

Hydrostatic pressure from water in surrounding earth.

These pressures can cause cracks and leaks in the tanking.

306
Q

What types of species of wet rot are there?

A

The most common type of wet rot is Coniophora puteana (latin name) – known as cellar fungus.

Other species include Fibroporia vaillantii (mine fungus)

307
Q

How would the wet rot appear differ if it was dry rot?

A

Wet Rot: The timber is likely to feel soft and spongy to the touch with discolouration present.

Dry Rot: Cuboidal cracking likely to feel brittle.

308
Q

Without touching the windows; how did you confirm it was wet rot?

A
  1. Darkened timber – darker than surrounding timber.
  2. Cracked appearance
  3. Warping of the timber due to excess moisture levels.

Note: The timber is likely to feel soft and spongy to the touch with discolouration present.

309
Q

What is Approved Document J?

A

Combustion appliances and fuel storage systems

310
Q

What was the pipe sticking out the slate covering? Boiler Flu? What design considerations did you have around this?

A

I reviewed Approved Document J and identified the minimum distance between the flu and openable window.

This was a minimum of 600mm from openings.

311
Q

Would there have been anything different about the construction of the basement walls in comparison to above ground level?

A

The basement walls may have been thicker and corbelled up the building.

312
Q

Were there any other moisture sources you considered?

A
  • Drainage: CCTV drainage survey
  • External inspection to rule out failure of rainwater goods.
  • Condition of external walls
  • I considered surface water sitting next to external walls (paving wasn’t abuted to the brickwork there was a pea gravel perimeter drain)
313
Q

Who provided the Guarantee for the waterproofing system?

A

The waterproofing specialist provided a 5 year insurance backed guarantee.

This protected the client from poor workmanship and poor-quality products.

Note: The membrane manufacturer ‘Delta’ also covered provided a product guarantee of 30 years.

314
Q

What are some of the key issues typically found in a basement?

A

Difficulty providing:
- Natural light
- Ventilation
- Drainage
- Access
- Means of escape

315
Q

Is compliance with British Standard 8102: 2022 mandatory?

A

No, this is considered best practice guidance for protection of below ground structures against water ingress.

316
Q

What were the limitations to the guarantee (5 year)?

A

The guarantee was limited to the new system installed and not the existing system retained.

Guarantee not apply where the work has been interfered with or damaged.

317
Q

What does BS8102 say about Type C systems?

A

The British Standard identifies that a cavity drainage membrane is the safest single waterproofing system method available for those not wishing to implement a full dual waterproofing strategy.

This is because future groundwater ingress is depressurised and then controlled, diverted and removed rather than being ‘’blocked’’ at the point of entry.

Consequently, the risk of increased hydrostatic pressure is reduced.

318
Q

Did you review the water table when considering your design?

A

I reviewed the requirements in BS 8102 which states:

“waterproofing measures should be designed on the basis of water to the full height of the retained ground at some time during the structure’s life”

319
Q

How did you ensure quality and workmanship with the basement works?

A

I regulally inspected the works at key intervals prior to the system being concealed and kept a photographic log.

The area manager from the waterproofing specialist also inspected at key stages and kept a log.

320
Q

Why had the vinyl floor covering cracked?

A

Impact Damage: Foot traffic causing wear and tear.

Poor quality vinyl: Good quality vinyl usually has thicker wear layers enhancing its resistance to damage.

Poorly fitted: The concrete beneath wasn’t level or cleaned down prior to install.

321
Q

What vinyl was specified for the stairs and why?

A

PolyFlor Slip Resistant Vinyl (R10)

To match the existing vinyl to the remainder of the basement.

Slip reistant for safety – frequently occupied to and from cleaners cupboard.

R10 rated products are for areas that are kept largely dry.

322
Q

What is the purpose of stair nosings?

A

Increases the treads durability by protecting the tread from damage and wear. Because most people plant their feet at the very end of a staircase tread.

Stair nosings give the steps a nonslip surface area at the head of each step.

323
Q

How was the timber fixed over the steps to prevent penetrating the membrane?

A

The risers were fixed with membrane fixing plugs providing a watertight seal.

The treads were glued to risers and fixed to treads with a good quality contact adhesive.

324
Q

Who designed the tanking solution?

A

I prepared the outline design.

The waterproofing specialist prepared the specification of products.

325
Q

You ruled out the possibility of repair early on; why?

A

I considered that timber repairs would not be an economical solution given the access restrictions.

I consulted with a timber preservation specialist during the early design phase who advised the windows would have to be removed and repaired off site given the extent of decay.

The poor design of the windows would have remained and therefore would require additional costs for regular maintenance (3-5 years) to include scaffold cost. (£8k for the works - £1k per week).

326
Q

How do you inspect a cavity drainage system without exposing the walls?

A

The drainage channels are fitted with accessible inspection ports that allow for the drainage channels to be inspected, jetted or washed as necessary.
* A cleaning nozzle can be inserted and directed in both directions as required
* A camera can also be inserted in order to allow for inspection in either direction

327
Q

What was the amount of indemnity required for the contractor?

A

Principal Contractor (and waterproof specialist to match) detailed under Section 6 of the JCT contract:

  • Professional Indemnity: £2million (every one claim)
  • Public Liability: £5million
  • (Employers Liability: £5million)

The limits were set by the employers insurance team to ensure the risks were correctly apportioned and insured limit.

328
Q

How was the new membrane connected to the old membrane?

A

The new and old membrane studs interlocked into each other.

The overlap was a minimum of three studs.

Waterproof sealent tape was then used to the flat area between the last two studs of the previous sheet of membrane to create the flat joint.

329
Q

What type of timber were the stairs lined with?

A

Moisture resistant MDF.

This was specified and installed by the waterproofing specialist.

Note: Moisture-resistant MDF is pre-bonded and treated with moisture-repellent resins, making it more capable of dealing with damp or moist environments.