3-M Flashcards

0
Q

The NAVY’S 3-M program is sponsors by whom

A

CNO

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
1
Q

What is the purpose of FR

A

Distribute and implement revisions changes or additions

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

3-M manager on board cvn

A

XO

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Classified MRC

A

Pink

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What best represents the main purpose of 3-M

A

The ensure the max equipment readiness and meeting min specifications

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Equipment tag out instructions used on cvn

A

TUM tag out user manual

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What does R stand for

A

Situational requirements

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What does Q-Z stand for

A

Quarterly

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What sked pms schedule shows all maintenance requirements to be completed for the week

A

Weekly

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

LU

A

Lay up

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

PM

A

Periodic maintenance

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

OT

A

Operational test

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

SU

A

Start up

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

What provides a list of maint index pages assigned to each work center

A

LOEP

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What does FR 2-05 mean

A

Forced revision two in year 2005

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

What date was the MRC generated if the conventional MIP syscom MRC control # is 10 4UMLN

A

January 2000
First two digits: month/year
1-9 jan to sep
A B C oct nov dec

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

IEM

A

Inactive equipment maintenance

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

FR stands for and how often is it used

A

Forced revision

Used four times a year

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

Documents or instruction used when HAZMAT is used in performing PMS

A

HMUG: hazardous material user guide
MSDS: meterial safety data sheet

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q

D

A

Daily

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
20
Q

2D

A

Every second day

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
21
Q

3D

A

Third day

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
22
Q

W

A

Weekly

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
23
Q

2W

A

Second week

24
3W
Third week
25
M
Monthly
26
2M
Second month
27
Q
Quarterly
28
4M
Forth month
29
S
Semi- annually
30
18M
18 months
31
T or F | The allowance parts list contains a list of repair parts or a piece of equipment
True
32
JSN
Job sequence number
33
3 parts of a JCN
Unit identification code (UiC) Work center ( EA01) Job sequence number( 4 digit number that starts at 0001)
34
The maint person must inform the DIVO when planned maint is complete T & F
False
35
Conditions for equipment to be placed in IEM
When the equipment will be inaction for • corrective maint •30 days or more • stored at a location on the ship
36
3 three of FBR's
* cat A * cat B * urgent
37
On the maint requirement card MIP SYSCOM control # 10 XDQW Y, what does the Y stand for
Repair parts: let's the WCS know that the person needs repair parts to complete the PMS
38
T or F | Caution tags provide temporary special instruction or indicate the usual action must be exercised to operate equipment
True
39
Form ( OPNAV 4790/2L is used
When the work candidate request needs a drawing to accomplish maintenance
40
When would the maint requirement M-R2 be completed
* every month or when situational requirements exists * M: monthly * R: situational requirement * 2: 2nd monthly check
41
How much time is required to complete a maintenance requirment the takes .4 man hours
24 minutes | .1 1/10 hr
42
T or F | Each equipment guide list ( EGL) should contain no more than a single days work
True ( max 8 man hrs)
43
What sheet is signed by the maintenance person after completion of maintenance
13 week accountability log
44
Who is the 3-M functional manager on CVN
3-M coordinator
45
Out of calibration gauge color
Orange
46
MIP
Maintenance index page: index of a complete set of maintenance requirement cards applicable to the ships system, sub system or equipment
47
APL
Allowance parts list
48
Forces afloat safety manual
OPNAVINST 5100.19E
49
SPMIG
Standard PMS material identification guide: | A five digit cross reference used to identify each tool part or material listed on the MRC
50
4 digit code located at the lower right corner or the MRC used in cataloging MRC's
SYSCOM MRC control number
51
Danger tag
Red
52
Caution tag
Yellow
53
Who maintains the PMS master file
3-M coordinator (3-MC
54
Out of commission label on a gauge is what color
Red
55
* following a periodic itch code indicates
Safety of ship item requires compliance with 4790.4D
56
Ship maintenance and material management system manual
OPNAVINST 4790.4C
57
( )
Convenient related check
58
#
Mandatory related check