301 Flashcards

(45 cards)

1
Q

A work center can take credit for a PMS check if 80% of the check can be completed

A

False

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What are the duties/responsibilities of the second person on an equipment tag out procedure?

A

To act as an independent reviewer, verifying proper tag, attachment, and positioning of the switch/valve

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Who has overall responsibility for ensuring the 3-M system functions within the command?

A

The commanding officer

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

An OPNAV 4790/CK is used to report discrepancies/deficiencies in the PMS system

A

False

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Which document provides a listing of the MIP’ S assigned to a specific work center?

A

List of affective pages (LOEP)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Cycle quarterly and weekly boards do not exist in SKED 3.2

A

True

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Who is the ships 3-M Manager?

A

XO

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

If more than one piece of equipment will be maintained by an MRC, the location block will read:

A

See location guide list below

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

To request a replacement for a lost or damaged MRC, that is classified the work center supervisor should fill out a?

A

OPNAV 4790/7B (Category A)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Where on MRC will you find a list of identical items at different locations?

A

Computer printed at the bottom of the MRC

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

A classified maintenance requirement card is what color

A

Pink

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Which document provides instructions and references required for the use in the 3M system?

A

OPNAVINST 4790.4 (series)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

When an MRC applies to multiple like equipment (motors, valves, battle lanterns, etc.) they are each listed on ____, and the location block will read ____

A

The bottom of the MRC
See location guide list below

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What is the purpose of the 3-M system?

A

To provide for a managing, maintenance and material support in a manner which will ensure maximum equipment readiness

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

“S 24 DWYG N”
From this MEC SYSCOM CONTROL NO you know that the MRC is:

A

Classified secret

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

When using hazmat information on proper personal protective equipment can be found where?

A

Both A and C

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

In OMMS-NG, a JSN is created by?

A

Opening a work candidate

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

When submitting a 2K in OMMS-NG that is assigned a priority of highly desirable essential or mandatory where should the CASREP DTG and serial he documented?

A

On the Misc tab

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q

You can share and APL with another work center that also performed maintenance on the equipment covered by the APL. true or false?

20
Q

The ships 3M system is designed to provide for managing maintenance and material support to achieve ____ equipment operational readiness

21
Q

What symbol indicates mandatory maintenance is required, and must be accomplished concurrently

22
Q

In the procedure block, workcenter supervisors made line out the non-applicable line items (alternate procedures) that do not pertain to current equipment/configuration when the steps followed with the words “ if applicable” or a note identifying steps

23
Q

The department head signature on quarterly and cycle boards has been replaced in the SKED 3.2 with an electronic approval process for revisions. true or false?

24
Q

For a danger/caution tag, when does the second person check the tags?

A

After the first person hangs the tags and hands the tag out sheet to the second person to find check and sign the tags

25
What does the acronym COSAL stand for?
Coordinated shipboard allowance list
26
What is chapter C1 in the afloat safety manual (5100.19E)?
Basic safety
27
What is chapter C9 in the afloat safety manual (5100.19E)?
Electrical and electronics safety, and tag out procedures
28
What is chapter C 18 in the afloat safety manual (5100.19E)?
Painting and preservation
29
What is chapter C23 in the afloat safety manual (5100.19E)?
Hazardous material control, and management standards
30
What does the word CASREP mean?
Casualty report
31
How many types of CASREPS are there
4
32
What program on board is used for hazmat identification?
HMIS
33
What is a five digit code used to identify the manufacturer of a part
CAGE
34
The SPMIG in SKED. provides NSN numbers for items required by PMS
True
35
What does MSDS stand for ?
Material safety, data sheet
36
What is an SCAT code?
A sub category code used to identify test equipment
37
The data code on the MRC is the last two digits of the SYSCOM CONTROL NUMBER
False
38
While conducting a tag out, the secondary person may accompany the person initially installing the tags to ensure proper installation
False
39
What tool is available in SKED 3.2 to identify tools, parts, materials and test equipment that will be required to perform PMS well in advance?
Forecasting report
40
The work center maintenance manual contains all the basic PMS documents, applicable to a work center in order to plan schedule and perform preventive maintenance. true or false?
True
41
What instruction covers all matters concerning 3M?
NAVSEAINST 4790.8B
42
True or false, anyone can access a workcenter is SKED program
False
43
How many types of feedback reports are there?
Three
44
When should a person checking a danger tag sign it
After it has been attached to the component
45
The purpose of the force revision (FR) is to ensure that installed PMS packages are periodically updated to reflect the changes in the system/equipment, and to provide PMS documentation (new issues and revisions) true or false
True