301 Overseeing Work (3) Flashcards

(30 cards)

1
Q

How many volts do high voltage electricians work with?

A

1000 > Volts

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What does EVC stand for?

A

Electric vehicle charging

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Give 5 examples of tasks an electrician does.

A

Security, Design, Earthing, Fault testing, Rewire properties

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Give 5 examples of jobs an electrician can do.

A

Sub-contractor, Highway electrician, underground services, Electric cars, Electrical tutor

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Give 5 examples of trades on site.

A

Gas engineer, plumber, carpenter, tiler, plasterer

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What is a main contractor?

A

A building contractor

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What is a sub-contractor?

A

Someone who works on behalf of the main contractor

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Give 5 examples of people to consider on site.

A

Customers, Clients, The public, Employers, Site managers

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Give 4 examples of communication techniques.

A

Motivation, Instructions, Monitoring, Co-operation

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Give an example of motivation.

A

A reward/Money

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Give an example of an instruction.

A

A list/Re-wire a house

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Give an example of monitoring.

A

Checking a socket once it’s been wired

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Give an example of co-operation.

A

Working with other people

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Give an example of considering a customers requirements.

A

Lowering a CCU for a client in a wheelchair

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Give an example of negotiation.

A

Knocking a price from £100 to £115

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Give an example of timing.

A

Not being able to use the shower until the bathroom is re-wired

17
Q

Define first fix.

A

The installation of wiring systems and containment systems.

18
Q

Define second fix.

A

The installation and connection of accessories.

19
Q

What are 3 types of electrical work excluded from BS 7671?

A

Oil rigs, Trains, Coal mines

20
Q

What is BS 1362?

A

Plug top fuse

22
Q

What are the 3 most common tools used to plan and implement changes?

A

Bar charts, spread sheetd, critical path sheets

23
Q

What does a variation order do?

A

Changes the conditions or clauses of an original contract

24
Q

What must be on a verification order?

A

Variation request, time estimate, additional cost, name of person doing work

25
What Is a penalty clause also known as?
Liquidated damages
26
What is a penalty clause?
A document that stipulates a specified sum of money will be payable by one guilty party to the innocent party
27
What does an AFDD protect against?
Fire
28
What does an SPD protect against?
Over voltage
29
What does AFDD stand for?
Arc fault detection device
30
What does SPD stand for?
Surge protection device