3.3 "Instrumentation" Flashcards
LCO 3.3.1 title
RPS Instrumentation
LCO 3.3.1 requirement
4 RPS trip units, associated instrument channels, and associated ZPM Bypass removal channels for each function in Table 3.3.1-1 shall be operable
LCO 3.3.1 applicability
- According to Table 3.3.1-1
- Separate Condition entry is allowed for each Function
LCO 3.3.1 required actions < 1 hour
- 1 or more ZPM Bypass Removal channels inoperable, then immediately remove the affected ZPM Bypasses, OR declare affected trip units inoperable
- 1 or more functions with 2 RPS trip units or associated instrument channels inoperable, then place 1 trip unit in trip in 1 hour AND restore 1 to operable w/in 7 days
LCO 3.3.2 title
RPS Logic and Trip Initiation
LCO 3.3.2 requirement
6 channels of RPS Matrix Logic, 4 channels of RPS Trip Initiation Logic, and 2 channels of RPS Manual Trip shall be operable
LCO 3.3.2 applicability
- Modes 1 and 2
- Modes 3-5 with more than 1 full-length control rod capable of being withdrawn and PCS boron concentration less than refueling boron
LCO 3.3.2 required actions < 1 hour
- 1 channel of Trip Initiation Logic inoperable, then de-energize the affected clutch power supplies w/in 1 hour
- 2 channels of Trip Initiation Logic affecting the same trip leg inoperable, then de-energize the affected clutch power supplies immediately
LCO 3.3.3 title
ESF Instrumentation
LCO 3.3.3 requirement
4 ESF bistables and associated instrument channels for each function in Table 3.3.3-1 shall be operable
LCO 3.3.3 applicability
- As specified in Table 3.3.3-1
- Separate Condition entry is allowed for each function
LCO 3.3.3 required actions < 1 hour
NONE
LCO 3.3.4 title
ESF Logic and Manual Initiation
LCO 3.3.4 requirement
2 ESF Manual Initiation and 2 ESF Actuation Logic channels and associated bypass removal channels shall be operable for each ESF function specified in Table 3.3.4-1
LCO 3.3.4 applicability
- According to Table 3.3.4-1
- Separate Condition entry is allowed for each function
LCO 3.3.4 required actions < 1 hour
NONE
LCO 3.3.5 title
Diesel Generator - Undervoltatge Start
LCO 3.3.5 requirement
3 channels of Loss of Voltage Function and 3 channels of Degraded Voltage Function auto-initiation instrumentation and associated logic channels for each Diesel Generator shall be operable
LCO 3.3.5 applicability
When associated Diesel is required to be operable
LCO 3.3.5 required actions < 1 hour
1 or more functions with 1 channel per Diesel inoperable, then enter applicable conditions and required actions for the associated Diesel made inoperable by Diesel Undervoltage Start Instrumentation immediately
LCO 3.3.6 title
Refueling CHR Instrumentation
LCO 3.3.6 requirement
2 Refueling CHR Auto Actuation Function channels and 2 CHR Manual Actuation channels shall be operable
LCO 3.3.6 applicability
During core alterations and during movement of irradiated fuel assemblies w/in containment
LCO 3.3.6 required actions < 1 hour
1 or more Functions with 2 channels inoperable, then suspend core alterations AND suspend movement of irradiated fuel assemblies w/in containment immediately