STATE the function of the 4.16 kV distribution system
Supply power to various vital and non-vital 4.16 kV station auxiliaries
DRAW and LABEL a simplified diagram of the 4.16 kV distribution system showing the power sources, transformers, and interconnecting breakers
STATE the physical location of the 4.16 kV buses
- buses 3 & 4 non-safety related (located in non-essential switchgear room, 21’6” level)
- E5/E6 are safety related buses (located in essential switchgear room, 21’6” level)
DESCRIBE the actions that have to be taken to manually transfer the 4.16 kV bus power supplies from the UATs to the RATs, and back to the UATs
Energize Synchronization system for RAT breaker to be closed, verify Synchronized Close RAT supply breaker Verify UAT breaker tripped, green flag breaker switch verify amber light out De-energize Synchronization system
DESCRIBE the function of the remote safe shutdown (RSS) disabling switches located in the diesel generator room for the 4.16 kV bus 5 and bus 6 UAT and RAT incoming supply breakers
• RSS Disabling Panel switch a. isolation of closing circuit from control power b. used during fire conditions to prevent inadvertent shutting from fire induced circuit failures
DESCRIBE the impact on 4.16 kV bus 5 and bus 6 RAT incoming supply breaker automatic shutting when the associated local-remote selector switch is in local
If in Local no Auto Transfer Available
DESCRIBE the automatic actions that occur as a result of an extended undervoltage condition on 4.16 kV bus 3 or 4.
• No UV tripping of bus incoming supply breakers – without UAT going open no auto transfer – Trip (94 relays, large loads) • Condensate pump • Heater Drain pump • Blocks RAT auto transfer
DESCRIBE the following line-ups of the 4.16 kV system: • 100% Power • 0% Power • Loss of AC (offsite)
• 100% Power - from generator through UATS to Buses • 0% Power - from offsite through UATS to buses • Loss of AC (offsite) - from the EDGs to bus 5 and 6 only
Given a list of the 4.16 kV motor loads, IDENTIFY their correct bus power supply system
Bus 3 and 4 Loads • Typical Loads – Condensate Pumps – Heater Drain Pumps • Bus 4 – Start-up Feedpump (shutdown/startups -02DCR019) – Centac Service Air Compressor – LC-3 Bus 5 and 6 Loads • Safety related equipment • SW (pumps/fans), EFW (bus 6), CC – Emergency core cooling systems • RH, SI, CS pumps – Physically and electrically separated – Remote safe shutdown equipment
Regarding SEN-282, HB Robinson Electrical Fault, DISCUSS the adverse effects of the inappropriate operator actions regarding the reset of the 86 device
operators used a normal operating procedure in an adverse condition and caused a larger casualty, that resulted in damage to the electric plant.