60008 - Notes / Clarifications Flashcards
Familiarize self with project sow,notes,clarifications (29 cards)
What is the customer project name?
ANL MNB EQP EOL Replacement 2024
what is the customer project # for this project?
A00OR-003655
What is the customer spec # for this project?
V300-TA11-01-CL002-01
Where is the location of the project?
baytown, tx
What is the functional location of this project per the customer?
BTNMDIX-V300-TA11-CL002
What is the customer equipment description?
Crude MNB tank
What is the size and capacity of the equipment?
25’ ID x 24” shell height / 88, 128 Gal
What is the product stored for this project?
crude mono-nitrobenzene
what is the design sg for this project?
1.20 at 10F
what is the design code for this project?
API 650 latest edition / Annex E, F.13, L, M, S, V &W ( L& W are common and left unstated in the design)
what is the ma design temp?
200F
what is the design metal temp?
20f
what is the designed liquid level?
24’
what is the design internal pressure?
2.5 PSIG
what is the design external pressure?
-2.5” WC
what is the CA for this project?
1/32” on plate and nozzle material
what is the proposed shell thickness?
1/4”
Did our proposed shell thickness consider all applicable loads per spec (internal, external) lifting lugs attachments and considered the fact that the entire tank upon fab on temp pad shall be lifted by provided lifting lugs on shell to install on foundation)
yes, proposed shell thickness considered this.
for the shell to bottom test, after visual, are we going to PT or diesel test?
diesel test
for the shell to bottom test, what nde do we need to do before we do a hydrostatic test?
Final PT
what is the roof type for this project?
Cone
what is the slope of the roof?
3.5” x 12”
what kind of roof support is being proposed?
none
what type of roof weld joints did we propose?
lap joints with seal weld underside