1
Q

The ____________ must account for the needs of the athletic programs or athletes and the staff in order for the layout to be most efficient.

A

Design

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What should the committee consist of when it comes to a new facility design process?

A

Contractor, architect, designers, lawyers, strength coach etc.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What are the 4 design phases when it comes to a new facility?

A

Predesign phase
Design phase
Construction phase
Preoperation phase

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

The _______________ is the first step in building a new facility. Should consist of a needs analysis, feasibility study, and master plan formation.

A

Predesign phase

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

The ___________ is a step in which the design and experts collaborate and determeine the needs of the athletic program.

A

Needs analysis

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

The Second part of the predesign phase is called a _____________. Which analyze strengths, weaknesses, opportunities and threats.

A

Feasibility study

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

The ______________________ is the general plan or all phases of the new facility. Should include the building and construction plan, facility design, budget information, and an operational plan to act on once the facility is actually complete.

A

Master Plan

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

The __________________ is the second phase in the process of building a new facility. Finalize the design committee, designers need to work closely with the architect to produce a blueprint of the facility.

A

Design Phase

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

The longest phase of the process___________________. The committee needs to continually refer to the master plan to ensure that the project is on track with regard to the established goals and design.

A

Construction Phase

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

The last phase, ________________, it is important to include a plan for staff development as well.

A

Preoperation Phase

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

With either a ramp or a wheelchair lift for any change in height exceeding 0.5 inches. A ramp should run _______ for every 1 inch rise.

A

12inches

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

The ceiling height recommendation should be?

A

12 to 14 feet

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Ideally, weightlifting plateforms should have a middle portion made of __________ and outer sections made of ____________.

A

Wood and Rubber

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

The facility’s lighting should include articulate and natural lighting. The lights should be between ____ and _____ lumens, depending on the height of the ceilings and the amount of natural light.

A

50 and 100

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Most sources indicate that optimal temp. Is anywhere between ______ and _____ range. Operation is optimal in the ____ to ____

A

68 to 78

72 to 78 deg.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

If fans are used, what is the general guideline?

A

2 to 4 fans per 1,200 square feet

17
Q

___________ should be placed at least 6 inches away from any equipment and a minimum of 20 inches above the floor.

A

Mirrors

18
Q

__________________ should be located away from the flow of the gym, but is extremely important.

A

Drinking Fountains

19
Q

Barbells and dumbbells should have a minimum of ________ of space between other barbells and dumbbells to allow for movement between racks without danger to the lifter or spotter.

A

36inches