1
Q

What are the FOUR steps when carrying out an inspection?

A
  1. Consider your personal safety (firms Health and Safety procedures for a site inspection)
  2. Inspection of the local area
  3. External inspection
  4. Internal inspection
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What should you take on an inspection with you (M, T, L, F/P, P, P/D)?

A
  • Mobile phone
  • Tape measure/laser
  • File, plans and other supporting information
  • Personal protective equipment (PPE) such as a fluorescent jacket, steel-toed boots, non-slip soled shoes, ear defenders, gloves, goggles and hard hat
  • Pen and paper / Dictaphone
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What should you consider in the immediate surrounding area of the property when conducting an inspection - 3 categories-
(L/A/L/P/B)
(C/E/F/H/E)
(C/L/A)

A
  • Location / aspect / local facilities / public transport / business vibrancy
  • Contamination / environmental hazards / flooding / high voltage power lines / electricity substations
  • Comparable evidence / local market conditions / agents’ boards
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What should you consider when conducting an external inspection (5 broadly)?

A
  • Method of construction
  • Repair and condition of the exterior
  • Car parking / access / loading arrangements
  • Defects / structural movement
  • Check site boundaries with OS map and / or Title Plan
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What should you consider when conducting an internal inspection (L/S, R/M, D, S, S, F/I, C)?

A
  • Layout and specification - flexibility and obsolescence
  • Repair and maintenance
  • Defects
  • Services - age and condition
  • Statutory compliance e.g. asbestos, building regulations, health and safety, Equality Act, fire safety and planning
  • Fixtures and fittings and improvements
  • Compliance with lease obligations
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What are the different ways that you could date a building (6)?

A
  • Asking the client
  • Researching the date of planning consent or building regulations approval
  • Land Registry
  • Local historical records
  • Architectural style
  • Architects certificate of practical completion
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What are the THREE different purposes of inspection?

A
  1. Valuation - valuation influencers
  2. Property management - policing the lease
  3. Agency - marketability issues
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

If inspecting a property for valuation purposes, what would you be looking out for (7)?

A

Valuation influencers -
Factors which can influence the valuation of a property such as location, tenure, aspect, form of construction, defects, current condition, occupation details

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

If inspecting a property for property management purposes, what would you be looking out for (Occ/Unoc)?

A

Policing the lease -
• Occupied: check the lease compliance, statutory compliance, state of the building, requirement for repairs/redecoration, user and details of the actual occupier

• Unoccupied: check statutory compliance, state of the building, repair and maintenance issues, security arrangements, landscaping, risk of vandalism and damage to the building

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

If inspecting a property for agency purposes, what would you be looking out for (5)?

A

Marketability issues -
Current condition of the building, repair and maintenance issues, statutory compliance, services, presentation and flexibility of the accommodation and its marketability

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

What are the FOUR common forms of foundation (T/R/P/P)?

A
  1. Trench or strip footings - generally used for residential dwellings, for walls and closely spaced columns
  2. Raft - a slab foundation over the whole site to spread the load for lightweight structures. Usually used on made up/remediated land and sandy soil conditions
  3. Piled - long and slender reinforced concrete cylinders (piles in the ground to deeper strata when less good load-bearing ground conditions/high loads
  4. Pad - a slab foundation system under individual or groups of columns so that the column load is spread evenly
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

What determines the type of foundations used (3)?

A
  • Age of the building
  • Ground conditions
  • Size of building and loadings required
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

What are the TWO types of wall construction used?

A
  1. Solid wall construction

2. Cavity wall construction

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What is a solid wall construction?

A

Solid brickwork with headers, normally at least one brick thick, with different bricklaying patterns incorporating headers (e.g. Flemish bond) to tie together the layers of brick

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

What is a cavity wall construction, and what can provide evidence of it (3)?

A
  • Two layers of brickwork are tied together with metal ties, with a cavity that may be filled with insulation.
  • No headers used
  • Evidence of a cavity tray, air brick or weep holes may be seen
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

What is a stretcher?

A

Brick laid horizontally, flat with the long side of the brick exposed on the outer face of the wall

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

What is a header?

A

Brick laid flat with the short end of the brick exposed

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

What is efflorescence (cause, how forms)?

A
  • White marks caused by hydroscopic salts in the brick work
  • Formed when water reacts with the natural salts, by way of a chemical process, contained within the construction material and mortar
  • Water dissolves the salts which are then carried out and deposited onto the surface by the natural evaporation that occurs when air meets the surface of the wall
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q

What is spalling/cause?

A

Damaged brickwork where the surface of the bricks starts to crumble because of freeze/thaw action, after it has become saturated in the winter months

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
20
Q

What are the institutional specifications for shops (5)?

A
  • Most are constructed either of a steel or concrete frame
  • Services i.e. gas/water/electricity are brought into the unit and capped off at source
  • Concrete floor
  • No suspended ceiling
  • Let in a shell condition with no shop front, ready for the retailer’s fitting out works
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
21
Q

What are the two main methods of construction for new office buildings/what impact will that have on internal space?

A
  • Steel frame: have less columns and a wider span between the columns
  • Concrete frame: more columns, lower floor heights and a shorter span between columns
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
22
Q

What can you refer to if you’re unsure about what form of construction is (2)?

A
  • Architect’s drawings and specification

* Building manual

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
23
Q

What are the different types of air conditioning systems, and what benefits/negatives do they offer (7, V, F, V, S, M, H, C)?

A
  • VAV - variable air volume (highest capital cost but most flexible)
  • Fan coil - usually 4 pipe (lower initial costs and good flexibility but higher operating and maintenance costs)
  • VRV - variable refrigerant volume. Invented by Daikin (lower capital costs but higher operating and maintenance costs)
  • Static cooling - chilled beam and displacement heating. Natural approach to climate control (lower capital cost and operating costs but less flexibility
  • Mechanical ventilation - when fresh air is moved around the building
  • Heat recovery systems
  • Comfort cooling - a simple form of air cooling system
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
24
Q

What became illegal to use in air conditioning systems from 1st January 2015, and with what obligation for existing systems?

A

Use and replacement of the low temperature refridgerant R22

Existing R22 refridgerant systems needed to be modified to become more environmentally friendly

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
25
Q

What is a shell and core fit out?

A

Where common parts of the building are completed, and the office floor areas are left as a shell ready for fit out by the occupier

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
26
Q

What is the difference between a Category A (may include 4) and Category B fit out (may include 3)?

A
  • Category A: basic level of finish above that provided in shell and core. May include raised floors, suspended ceilings and internal surfaces, along with basic mechanical and electrical services
  • Category B: fit out complete to the occupier’s specific requirements. May include installation of cellular offices/furnishings, enhanced finishes and IT
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
27
Q

What is the main method of construction for industrial buildings?

A

Steel portal frame building with insulated profiled steel cladding walls and roof

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
28
Q

What is the current institutional specification for industrial buildings (8)?

A
  • Minimum 8m clear eaves height with 10% roof lights
  • Minimum 30 kN / sqm floor loading
  • Plastic coated steel profiled cladding with brick or blockwork walls to approximately 2m
  • Full height loading doors (electrically operated)
  • 3 phase electricity power (415 Volts)
  • 5-10% office content and WC facilities
  • Main services capped off
  • Approximate site cover of 40%
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
29
Q

What is the difference between an inherent and a latent defect?

A
  • Inherent defect: defect in the design or a material which has always been present
  • Latent defect: fault to the property that could not have been discovered by a reasonably thorough inspection of the property
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
30
Q

What is the purpose of snagging a newly built property?

A
  • Check the newly built property to identify defects in the build
  • Enables you to highlight them to the developer to allow them to fix the issues
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
31
Q

What FOUR steps should you follow if you identify any building defects during an inspection?

A
  1. Take photos of the defect
  2. Try to establish the cause of damage whilst on site
  3. Inform your client of your investigations
  4. Recommend specialist advice from a building surveyor or in the case of movement, a structural engineer
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
32
Q

What are the THREE common causes of defects?

A
  1. Movement
  2. Water
  3. Defective / non-performance / deterioration of building materials
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
33
Q

What is subsidence/what could cause it?

A

The vertical downward movement of a building foundation caused by the loss of support of the site beneath the foundation. This could be as a result of changes in the underlying ground conditions

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
34
Q

What is heave/what could cause it?

A

Expansion of the ground beneath part or all of the building. This could be caused by the removal of trees and subsequent moisture build-up in the soil

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
35
Q

What are the common causes of cracks in a property (6)?

A
  • Subsidence
  • Heave
  • Cavity wall tie failure (indicated by horizontal cracking in brickwork)
  • Shrinkage cracking (often occurs in new plasterwork during the drying out process
  • Settlement cracks
  • Thermal expansion / movement
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
36
Q

What is wet rot/caused by? What are the signs of wet rot (4)?

A

Caused by damp and timber decay

Signs include wet and soft timber, a high damp meter reading, visible fungal growth and a musty smell

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
37
Q

What is dry rot/what damage can it do (2)? What are the signs of dry rot (5)?

A

Caused by fungal attack. Can destroy timber and masonry. Signs include:
• Fungus (mycelium) which spreads across the wood in fine
• Fluffy white strands
• Large, often orange mushroom-like fruiting bodies
• Strong smell and red spores
• Cracking paintwork and cuboidal cracking / crumbling of dry timber

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
38
Q

What is rising damp? What are the signs of rising damp (3)? Where does it usually stop?

A
  • Caused by moisture from the ground travelling up through the wall by capillary action. Usually caused by the failure or absence of the damp proof course
  • Signs include tide marks of salts, dark patches on walls that can be damp to touch, damp and musty smell.
  • Usually stops around 1.5m above ground level
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
39
Q

What can condensation be caused by? What are the signs of condensation (2)?

A

Caused by lack of ventilation and background heating

Signs include mould and streaming water on the inside of windows / walls

40
Q

What are the causes of damp (5)?

A
  • Wet rot
  • Dry rot
  • Rising damp
  • Condensation
  • Leaking plumbing / air condition units / pipework
41
Q

What are the common building defects associated with period residential / office / shop buildings (8)?

A
  • Dry rot
  • Wet rot
  • Tile slippage on the roof
  • Death watch beetle
  • Damp penetration at roof and ground floor level
  • Water ingress around door and window openings
  • Structural movement / settlement
42
Q

What are the common building defects associated with modern industrial buildings (6)?

A
  • Roof leaks around roof lights
  • Damaged cladding panels
  • Cut edge corrosion
  • Blocked valley gutters
  • Water damage from poor guttering or burst pipes
  • Settlement / cracking in brickwork panels
43
Q

What are the common building defects associated with modern office buildings (7)?

A
  • Damp penetration at roof and ground floor level
  • Water damage from burst pipes or air conditioning units
  • Structural movement
  • Damaged cladding
  • Cavity wall tie failure
  • Efflorescence
  • Poor mortar joints in brickwork
44
Q

What is the key legislation on contamination?

A

Environmental Protection Act 1990 (as amended)

45
Q

What guidance has the RICS offered on contamination?

A

RICS Guidance Note Contamination, the environment and sustainability, 2010

46
Q

Who will generally pay for the remediation of a contaminated site (2)?

A

Polluter or the land owner

47
Q

What will a desktop contamination study comprise (3)?

A

Consider the previous use of the site, local history and planning register

48
Q

What materials generally cause contamination to exist (3, 1 subcat.)?

A
  • Heavy metals
  • Radon and methane gas
  • Diesel / oil / chemicals
49
Q

What are signs of contamination that you should look out for (5)?

A
  • Evidence of chemicals and oils
  • Oil drums
  • Subsidence
  • Underground tanks
  • Bare ground
50
Q

What are the THREE phases of an investigation for contamination/what investigations/actions are carried out?

A
  1. Phase 1 - review site history with a desk top study and site inspection and investigation
  2. Phase 2 - investigation to identify nature and extent of contamination with detailed soil samples taken using bore holes (intrusive)
  3. Phase 3 - remediation report setting out remedial options with design requirements and monitoring standards
51
Q

What should you do if there are concerns that a site has some contamination?

A

Suggest a specialist report

52
Q

What approach should be taken if you’re instructed to value a site with contamination / hazardous materials (3)?

A
  • Do not provide any advice until a specialist report is commissioned
  • Caveat the advice provided with an appropriate disclaimer highlighting the issue / use of a special assumption
  • Deduct the remediation costs from the gross site value
53
Q

What relief is available to those who spend money remediating certain contaminated or derelict sites, or those affected by Japanese Knotweed?

A

Land Remediation Relief (LRR) is a form of tax relief

Allows companies to claim up to 150% of the cost in cleaning up the site, against their Corporation Tax bill

54
Q

What is the difference between deleterious and hazardous materials?

A
  • Deleterious: degrade with age causing structural problems

* Hazardous: harmful to health

55
Q

What are some tell-tale signs / clues of potential problems with deleterious materials (4)?

A
  • Brown staining on concrete
  • Concrete frame buildings
  • 1960s and 1970s buildings
  • Some modern buildings
56
Q

What are some examples of deleterious materials (3)?

A
  • High alumina cement (corrodes steel)
  • Woodwool shuttering
  • Calcium chloride
57
Q

What are some examples of hazardous materials (3)?

A
  • Asbestos
  • Lead piping / lead paint
  • Radon gas
58
Q

Where does surface water drain into, how does this compare to foul water, and with what significance?

A

Surface water drains into the water course, such as soak away or storm drain.

Foul water drains from soil pipes into a sewerage system (private or public)

Statutory undertakers own a private sewer from the boundary of a property

59
Q

What guidance has the RICS issues on Japanese Knotweed?

A

RICS Information Paper on Japanese Knotweed and Residential Property, 2015

60
Q

What does Japanese Knotweed look like (3)?

A
  • Purple/green hollow stem
  • Heart-shaped green leaves
  • Clusters of white flowers
61
Q

What type of plant is JK, what damage/issues can it cause/why (4), and who can dispose of it?

A
  • Invasive plant that can damage hard surfaces such as foundations and tarmac
  • Not easy to control, costly to eradicate and a specialist company must remove and dispose of it
  • Property lenders may refuse loans
62
Q

What are the penalties for ignoring Japanese Knotweed and allowing it to spread onto adjacent land (criminal and LAs)?

A
  • Criminal offence under the Wildlife and Countryside Act 1981. Magistrates court can impose a maximum fine of £5,000 or a maximum prison sentence of six months, or both. Crown Court can impose an unlimited fine or a maximum prison sentence of two years, or both
  • Local authorities can grant a Community Protection Notice (CPN) and fines of up to £2,500 per person (£20,000 for an organisation)
63
Q

What did the landmark Japanese Knotweed case of Williams v Network Rail Infrastructure Ltd 2018 find?

A

Network Rail was liable for the cost of treating the invasive plant plus damages for the loss of use and enjoyment of their neighbour’s property (but not the reduced value of the property

64
Q

What did the House of Commons Science and Technology Committee report in May 2019 say about Japanese Knotweed (3, 2 were recommendations)?

A
  • Physical damage to property from Japanese Knotweed is no greater than that of other disruptive plants
  • Encouraged an evidence-based approach to ensure that the response is proportionate to the physical effects of the plant in the built environment
  • Recommended that Defra commission a study on international approaches to Japanese Knotweed
65
Q

What documents might your request before undertaking an inspection (4)?

A
  • Operation & Maintenance (O&M) manual
  • Asbestos register
  • Title plan
  • Floorplans
66
Q

If remediation works are required at a property, how could you estimate the cost of these (2 steps)?

A
  • Speak to contractors to get quotes to carry out the works

* Verify these estimates with building surveyors

67
Q

Would you inspect a roof (2), and if you did what would you have regard to/be conscious of (2)?

A
  • Avoid inspecting the roof if possible
  • Ask a specialist contractor to undertake an inspection of the roof
  • Need to have regard to the Work at Height Regulations 2005
  • Would be conscious of roof lights when inspecting an industrial unit
68
Q

What characteristics would you look for to determine the quality of a retail unit?

A
  • Configuration and layout of the unit - preference for rectangular shape as otherwise makes it difficult to fit out and merchandise
  • Masking - areas not visible from the shop frontage command a rental discount
  • Frontage - typically apply a rental discount for hard frontage and rental premium for a return frontage
  • Access arrangements - allow loading and unloading of goods
  • Ancillary space
69
Q

What can you look at as an indicator of the quality of the retail pitch (4)?

A
  • Proportion of retail tenants vs. non retail tenants (e.g. estate agents, banks).
  • Local vs. national tenant mix
  • Architecture of the buildings
  • Proximity to key footfall generators
70
Q

What document could you look at to confirm the construction of the property?

A

Operation & Maintenance (O&M) manual

71
Q

What types of foundations are there (2 broadly)? What will determine the type of foundations used (3)?

A
  • Generally split between shallow (trench, strip) and deep (piled) foundations
  • Type of foundation used will depend on the age of the property, the size and the ground conditions
72
Q

What could the disadvantages be of having a low site density on an industrial property (2)?

A
  • Increased security risk and risk of fly tipping

* More perimeter fence to maintain

73
Q

What is the usual size of floor and ceiling void in a new office building, and what floor is desirable?

A

Raised floor void: 150mm
Ceiling void 350mm
Full access raised floors with floor boxes

74
Q

What is the optimum depth of an office to allow for natural light (2), and lux average?

A

12m to 15m (shallow plan) or 15m to 21m (deep plan)

Maximised opportunities for daylighting, with 300-500 lux average

75
Q

What ceiling height is desirable for an office building?

A

2.6m - 2.8m

76
Q

What is the normal floor loading for an office building?

A

2.5 - 3.00 kN/sqm with an allowance of up to 1.2kN/sqm for partitioning.

77
Q

What services/communal features/glazing for Grade A offices?

A
  • Air conditioning and double glazed windows

* Passenger lifts

78
Q

What ratio of cycle space/shower, workspace density and planning grid for Grade A offices?

A
  • 1 cycle space per 10 staff and 1 shower per 100 staff
  • 8-10 sqm general workspace density
  • Planning grid of 1.5m x 1.5m
79
Q

What is the British Council for offices? & When was their guidance last updated?

A

The BCO was established in 1990 and is Britain’s leading forum for discussion and debate about the issues of the office sector. Its mission is to research, develop and communicate best practice in all aspects of the office sector.
Latest guidance 2019.

80
Q

What is a hidden valley gutter and what problems can arise because of one?

A

Where two main roofs meet or where there is a change in roof direction.

Can be easily blocked especially where nearby trees.

81
Q

What is radon?

A

Radon is a colourless, odourless radioactive gas. It is formed by the radioactive decay of the small amounts of uranium that occur naturally in all rocks and soil.

82
Q

How can you reduce the risk of radon (2 options)?

A

Positive ventilation - a small quiet fan blows fresh air, usually from the roof space, into the building.

Natural under-floor ventilation - many homes and some workplaces have a suspended ground floor with space underneath. Good ventilation of this space can reduce radon concentrations.

83
Q

Why are building warranties important?

A

Form of insurance policy that the building has been constructed to a high standard – covers defects and structural damage.

84
Q

When going out on an inspection, what procedures do you follow to inform the office of where you are?

A

I keep my diary updated, showing where I am going and who I am meeting. I always take a mobile phone and check in with a nominated colleague once I leave site.

85
Q

How would the asbestos regulation impact upon your inspection?

A

If there was asbestos present, I would need to note the presence and ensure I do not disturb the asbestos. If I were aware of such, I would place a notice on the door of the property to alert parties and inform the
operator immediately of the presence of asbestos.

86
Q

If you were going into an unoccupied building where asbestos may be present – what may you need to
look out for?

A

Asbestos may be within anything. I would look out for signs or stickers indicating that asbestos may be
present. I would also ask for any reports relating to the property such as Asbestos Reports. I would make
reference to these reports within my valuation report.

87
Q

If undertaking an inspection and you came across areas you could not access, what would you do?

A

came across this when inspecting a veterinary surgery and could not access the operating theatre or the contagious room. In this instance I made the appropriate assumption in my report and notified my client of this limitation.

88
Q

What would you do if you noticed some damp or movement in a building whist you are inspecting the
property to undertake a Red book valuation?

A

I would photograph the defect, ensure I took relevant precautions if the building appeared unstable and
would make appropriate commentary in my report stating the defect, the likely cause and cost of remedial work (making the required enquiries from a qualified building surveyor) and if some instances I would recommend that a prudent party would undertake a building survey to understand the defect and any implications it may have on the value. Where I feel this would impact upon the value I would value under the special assumption that there is no material defect and reserve the right to amend my valuation accordingly after a survey has been undertaken.

89
Q

How can you check the accuracy of your measuring devices?

A

Lasers are regularly calibrated to ensure accuracy. We check accuracy against a column in our office.

90
Q

What is the normal floor loading for an office building? How does it compare to the floor loading for a
warehouse or industrial unit?

A

50 pounds per sq ft. Warehouse or industrial would be circa 100 to 150 pounds per sq ft.

91
Q

Why do people use asbestos?

A

Asbestos was once used in the past due to its flame resistance.

92
Q

On an inspection, would you walk on an exposed flat roof?

A

Unless the roof was a roof terrace specifically designed for such, I would not walk on an exposed flat roof

93
Q

When would you carry out a risk assessment?

A

In my day to day role I regularly undertake pre-inspection risk assessments and continuous assessments throughout an inspection.

94
Q

What different types of obsolescence are there?

A

Function/Technical obsolescence – a loss of utility from inefficiencies in the subject asset compared to its
replacement that results in a loss of value,

Economic obsolescence – a loss of utility caused by factors external to the asset, especially those relating to a change in supply and demand, Physical obsolescence – a loss of utility due to the physical deterioration of the asset or its components resulting from its usage and normal usage resulting in a loss of value,

External obsolescence – a loss of utility caused by economic or location factors external to the asset that results in a loss in value

95
Q

Can you give me an example of a latent defect (2)?

A
  • Cavity ties that will later fail

- Inadequate foundations causing subsidence