a1 Flashcards
(80 cards)
What needs to set-up when creating a new BO to maintain its contents
Related to Display SS and Maint UI maps
Which of the following entities hold the demographic and geographic information, financial info, billing, etc.
Account, Person, Premise, Service Point, Service Agreement
Which statements are true for Account?
An account references one or more persons (one is main customer)
Bills are produced for accounts and are sent to the account’s persons (always sent to main customer)
Every account has a unique, system-assigned account ID (random number)
Accounts never expire (dormant when they have no active contracts)
At any instant in time, how many meters (device) can be installed at a service point?
One
How many install events exist for previous year when meter exchange occurred in previous year?
Two - e.g. 1 install event per meter (old and new)
Which does SA Type control?
Defines Rates that can be used on its SAs
Defines which Date is used to select a Rate (Rate Selection Date)
Start Options
Payment Info
Is Billable
Severance Criteria
Special Role (e.g. PA, Bill Determinants Required)
Valid SP Types
Debt Class
Recurring Charges
A premise may have zero, one or more service points
Which are true for components?
Attached to asset,
Cannot be installed to a location,
Has a disposition
Which of the following are true for the relationship between Assets and Components?
Components are a class of Assets.
Components cannot be installed on their own at a location, but can be received, tracked, or inspected like any other Asset.
Components and Assets have dispositions
(False options contradict those that are true e.g. Components are not Assets…)
Aside from set of procedures and careful handling instructions for Specifications, what can be used to provide information about specifications?
Attributes
Specifications (design details and/or functional performance criteria) of Assets/Components includes following info:
1) procedures
2) handling instructions
3) attributes
Which of the following are true about Specifications and Assets?
A single specification can be used on many assets
A specification may contain peer specifications
NOTES:
Specifications are user defined and can easily be extended
Specification reference an Asset Type and Manufacturer
Should have unique internal stock code
Define available Firmware Versions
Which of the following are valid Asset dispositions?
Statuses: In Service, Pending Disposition Installed or Attached (for Component), In Receipt, In Repair, In Stores, Out of Service, Rejected, Retired (Invalid answer would include a variant of a correct disposition e.g. Receiving, Storage).
NOTES: Two Locations: Out of Service (Storage) Locations Asset Locations Two Categories of Assets: Tracked Asset/Component – has disposition In/out Service Asset – stationary
Where to configure which usage need to be measured?
Measuring Component Type
What are the attributes for measuring components?
Channel Id and Multiplier
Measuring Component Type
UOM/TOU/SQI Scalar or Interval Subtractive or Consumptive
Device configuration to which the measuring component is associated
Details concerning how the measuring component is read, such as the number of digits, the type of read out (dials or digital), the meter multiplier, etc.
The VEE groups used for validation and estimation of measurement data.
Measurement Component fields
Channel Multiplier and Channel Id
Which of the following are true about Subtractive and Consumptive reading?
Subtractive MC’s usage = End Measurement minus Start Measurement.
Consumptive MC’s usage = Measurement
Which of the following are not true for Measuring Components?
Types of MCs include Physical, Standalone, Scratchpad, and TOU.
Seconds-per-interval is measured by Scalar MCs.
The following is true for MCs:
Type of MC include Physical, Standalone, Scratchpad, Aggregator
SPI is only applicable for Interval MCs
Which is true about the relationship of Device and Measuring Components?
Device has attributes that are the same regardless of number of MCs
MC has attributes that may differ for each MC in a device
Device Configuration records how device’s MC look at instant in time
If a company has scalar devices with different registers for outgoing and incoming kwh measurements, how should you implement this in C2M?
1 device and multiple MCs
Choose 2 required configuration for Device Type for the two devices (something like that)
Provided
Gas Manual meter
Electric Smart meter
Service Type
Business Object
What are the different Service Order Activity Types/Processes?
Enable Service, Disable Service, Cut for Non Payment, Reconnect Service for Payment, Exchange Meters, Back to Back Service
What can be done by Enable Service Order?
Connect SP,
Install device,
Turn on device,
Check Measurement exists
What can “Are SP and Device Ready?” status algorithm do?
Customer Device Compatibility Check, Connect SP and/or Install Device, Connect Device, Check for Measurement, Update US/SP Start Date Time
Which of the following is Connect SP and/or Install Device algorithm capable of?
Sending a smart meter command
A field activity of a specific field task type
Specify whether or not to execute an “Override” algorithm that dynamically determines the type of activity to create