A5 Use Safe Work Practices Flashcards

1
Q

OHS Comity is made up of who?

A

Worker and employer representatives

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What does the comity do?

A

responsible for promoting safety, improvements, deals with complaints, safety inspections, and assist with investigations.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

what does a comity not have?

A

Decision making authority

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

The minimum number of comity members is?

A

4 employers and workers

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

what does organizations under 20 workers have?

A

just one worker health and safety representative

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

how often does the comity meet?

A

once per month

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

who must keep records of each meeting and what should they include?

A

the employer must keep the records including the minutes and a list of attendees

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What are Minutes?

A

Minutes are a brief synopsis of the subjects that were discussed

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

what percent of the comity must be workers?

A

50%

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

During safety inspections, who accompanies the the WorkSafe inspector?

A

A worker member

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

An accident report should include what?

A

witness statemnets, description of incident, analysis, prevention

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Site investigations should include what?

A

soil types, drainage, material removed or added, location of services.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Water lines should be what?

A

easily accessible incase of a leak and replacement

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

where do perimeter drains and drainage tile drain out too?

A

Storm Sewer

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Gas lines should always be what?

A

located, installed/removed, stacked by certified gas fitter

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Gas lines are buried how far down for steel and polyethylene pipe?

A

305mm steel, 460mm polyethylene

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

all services can be in the same trench except for two?

A

water lines and sewer lines

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

Gas meters are located how far up from the ground?

A

900mm

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q

what is the life expectancy of underground lines?

20
Q

water must not ___ in an excavation

A

Pond or else it will decrease the bearing capacity

21
Q

soil Piles must be how far away from an excavation

22
Q

Soil piles must be how far away from a trench

23
Q

what is used to measure the depth of an excavation?

A

builders level

24
Q

what must be onsite during blasting?

A

Guards and barricades for pedestrians

25
to warn people what must happen before the blast?
12 short whistle signals at one second intervals followed by 2 minutes of silence then the blast is initiated
26
what happens after the blast?
5 seconds of a continuous whistle
27
what must the employer add to the boundary of the site being blasted?
warning signs and personnel to keep pedestrians away
28
Excavations deeper then ___ must provide sides to be shored, sloped, or benched
1.2 meters
29
what must be provided for safe access into a trench?
sloped sides or ladder
30
walkways crossing trenches must be___?
at least 500mm wide, no more then 1:5 slope and slip resistant
31
Soils are divided into 3 types
Type A: Hard and load bearing Type B: Soils likely to crack and crumble Type C: soft, sandy, loose soils
32
what is hydrostatic pressure?
ground water seeping up from the ground to be level with the water table
33
what is benching?
vertical cuts at least 1.2m and horizontal cuts 1.5 times what ever vertical cut is
34
when can plywood be substituted for up right planks?
as long as the trench does not exceed 2.7m
35
what is telescope shoring?
stacked planks to extend further into the trench if the trench is deeper then the tallest plank
36
trenches can be sloped at what degree?
15 degrees
37
Guard rails must be how tall?
1020mm-112omm
38
only what grades must be used?
1 or 1A
39
ladders must extend how far past edge of structure?
900mm
40
what is the safe slope of a ladder?
4:1
41
ladder cleats must be spaced how far apart?
300mm on center
42
Ladders are constructed out of what?
aluminum or No. 2 lumber or better
43
what is the minimum gap of a toe board?
13mm
44
Chutes must be provided if the free fall of material is higher then___?
6 meters
45
Designs for support systems must have a ___?
a scheduale