advanced Flashcards

(63 cards)

1
Q

What is meant by the term “two blocking”?

A

The load block contacts the boom point sheaves.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Lifting 20,000 lbs with a 2-leg bridle sling at a 30 horizontal sling angle, what is the force applied to each leg?

A

20,000 pounds

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

In multiple crane lifts using an equalizer beam, the weight of the beam should be considered:

A

Part of the load weight

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What is required of there is a deviation from the lift plan?

A

A new lift plan

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

On level ground using skids and rollers, what percent of the weight of the load should yield the required line pull as a general rule of thumb?

A

5%

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

All of the following are results of unbalanced reeving of the hook block EXCEPT:

A

Wear on the hook

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Before a spreader bar or beams can be used the MUST have been:

A

Tested and Approved

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

When materials are being hoisted to an upper level, a tag line is used to:

A

Help control the load

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Two cranes are lifting 100 tons. If crane A has 40% of the load, how much weight will crane B have on its hook?

A

60,000 lbs

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

To CONFIRM the rated capacity of a specific sling, consult the manufacturer’s:

A

Sling Tag

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

OSHA regulations require hook replacement if the opening exceeds what percentage of its original throat opening:

A

15%

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

At what percentage of increase in length should a chain sling be removed from service?

A

5%

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

The methodical process that attempts to identify hazards and devise plans to overcome or eliminate hazards which which may interfere whit crane of rigging is called:

A

Lift Plan

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What provides additional control of a load being lifted?

A

Tag Lines

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

When traveling on a rubber tire mobile crane, how should the boom be positioned?

A

In line with the direction of travel

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Before performing pick and carry operations with any mobile crane, it is important to:

A

Refer to the manufacturers capacity chart

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

According to ASME B30.5, a two crane lift is signaled by:

A

One designated person

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

What is the PRIMARY concern when working with high boom angles?

A

Backward stability

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q

On multiple crane lifts, the load on each crane should NOT exceed what percentage of capacity?

A

75%

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
20
Q

What are lifting lugs?

A

Eyelets welded to a steel plate for lifting

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
21
Q

The formula for determining stress on a snatch block performing a vertical lift is: line pull x block factor = block load. What must be done to calculate formula?

A

Multiply the load weight by the coefficient of frictionto determine line pull, and the use the standard formula

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
22
Q

if both fists are placed in front of your body with your thumbs pointed outward, the crane operator should:

A

Extend the boom sections

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
23
Q

What is the MAXIMUM percent of the rated capacity of a crane that can be used to lift personnel?

A

50%

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
24
Q

When does lightening present the greatest hazard to the crane and rigging personnel?

A

When thunder and lightning are apparent

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
25
What force would be required to move an object up an inclined plane compared to lifting it vertically?
1 1/2 times more
26
Personnel platforms shall NOT be used to lift:
Tools and materials without employees
27
All of the following are reasons for stopping personnel lifting operations EXCEPT:
There are no tag lines
28
When working in close quarters, the main concern is:
Safety
29
The point of any object's weight can be assumed to be concentrated at:
Center of gravity
30
In a spur-gear chain hoist with a two chain system, the endless chain is used to:
Raise and lower the load
31
In an emergency situation, what is the rigger's FIRST priority?
Te prevent injury of loss of life
32
All of the following conditions exert dynamic loading on a crane EXCEPT:
Static boom angle
33
Proper lead sheave placement as it relates to the hoisting drum location is:
Proper spooling of wire rope
34
The MOST important information to consider when planning a lift is:
Weight of the load
35
Prior to use, all new, altered, modified, or repaired rigging hardware shall be inspected by whom?
A designated person
36
An unsafe condition that riggers should be aware of when dealing with a multi part load block is:
Twisting multi part lines
37
Most cranes in duty cycle operation require a:
Load test
38
The only personnel allowed to have their body parts outside of the suspended personnel platform during hoisting and lowering operations are:
Signal persons
39
What is the most important reason rigging hardware should NOT be modified?
It could negatively affect its capacity
40
In the term (D / d ratio) the d is an abbreviation for:
Diameter
41
A document that outlines weights, crane configuration and rigging requirements for a lift is called a:
Lift plan
42
When using a 1-inch wire rope sling in a vertical basket hitch lifting a 24-foot long, 36-inch diameter pipe,
36 to 1
43
What is LMI?
Load movement indicator
44
Location of electrical hazards on the job site should be documented on a:
Lift plan
45
When forming a lift plan, a PRIMARY concern for the person doing the rigging is
Capacity of rigging
46
When using a wedge socket, the dead end of the rope is secured in the socket by the:
Wedge
47
When erecting or stowing a swing-away lattice extension, what should be used to control the movement of the extension?
Tag line
48
Planning for rigging is required:
Only when lifting any load
49
A lift plan MUST be completed by a:
Supervisor
50
Anchorage points for fall arrest for a single person MUST be able to hold:
500 lbs
51
Which of the following items are used for heavy rigging?
Slings, shackles, and spreader beam
52
If the jacket of a synthetic round sling is damaged, that sling should be:
Removed from service immediately
53
Which of the following is NOT a factor when making submerged lifts?
Water temperature
54
When a tugger is mounted where the operator can NOT see the load, the signal person MUST use:
Signals used for cranes
55
Who can designed a personnel platform?
A qualified personnel
56
A one-inch, 3-leg bridle wire rope sling, rigged at a 45degree angle, is good for 18 tons. The addition of a fourth leg will increase your capacity by:
0 lbs
57
After any structural repair or modification, a personnel lifting platform shall be tested to what percentage of the platform rating?
150%
58
All of the following statements about crane contact with power lines are TRUE EXCEPT:
The operator should leave the cab as quickly as possible
59
Loads introduced into the machine or its components due to accelerating or decelerating force is called:
Dynamic loading
60
Using the sling chart provided, what is the rated capacity of a 1/2 inch sling in a basket hitch with sling legs 90 degrees?
6,200 lbs
61
When lifting 100,000 pounds, the main load block must be reeved with how many parts of line?
4
62
What standard hand signal is being communicated in the illustration?
Travel (one track)
63
What standard hand signal is being communicated in the illustration?
Use whip line