ALL ABOUT NUMBERS Flashcards
(80 cards)
The water shall be kept in the pipe system or in the portion under test for at least _____ minutes before inspection starts
15 minutes
In a water test, each section shall be filled with water, but no section shall be tested with less than _____ m head of water.
3
Where the local water pressure is in excess of _____ kpa, an approved-type pressure regulator preceded by an adequately sized strainer shall be installed to reduce the pressure on the building side of the regulator to the required supply pressure.
551
The corresponding maximum trap loading pipe size for fixture unit 6 (answer in mm)
76
Support trap arms in excess of _____ feet in length as close as possible to the trap.
3
Closet rings shall be tightly fastened with corrosive resistant fasteners up to the floor with top surface _____ mm above finish floor.
6.4
When disposal fields are installed, a minimum of _____ of trench bottom shall be provided for each system exclusive of any hard pan, rock, clay, or other impervious formations
14 sqm
When the quantity of sewage exceeds the amount that can be disposed in a _____ meter of each line, a dosing tank shall be used.
152.4 m
Backflow prevention for hot water over ____ deg. C shall be a listed type assembly.
43.3
Cast iron fittings up to and including _____ mm in size when used in connection with potable water piping shall be galvanized.
51
Interceptors for sand and similar heavy solids shall have a water seal of not less than _____ mm deep.
152
Trenches shall be back-filled in thin layers of _____ m
0.3
(Vertical wall areas for rainwater piping size) For two adjacent walls, add _____ percent of the total wall areas to the roof area.
35
Before placing filter material or drain lines in a prepared excavation, all smeared or compacted surfaces shall be removed from trenches by raking to a depth of _____ mm.
25.4 mm
Each grease trap shall have an approved water seal of not less than _____ mm.
51
Minimum thickness of lead safe pan in mm
1.6
Cleanout size of 64 mm pipe. (answer in mm)
64
Estimated sewage flow rate for airports per employee
56.8 LpD
Each run of pipe which is more than _____ m in total developed length shall be provided with a cleanout.
15
No standpipe receptor for any clotheswasher shall extend more than _____ m nor less than 0.45 m above its trap.
0.8
The inlet compartment of any septic tank shall be not less than _____ of the total capacity of the tank.
2/3
The vacuum breaker shall be installed at the discharge side of the flushometer valve with the critical level at least _____ mm.
152
Retention time of commercial kitchen waste
2.5 hours
No underfloor cleanout in any residential occupancy shall be located more than _____ m from an access door, trap door or crawl hole.
6.1