Area Figures Flashcards
(18 cards)
0
Q
Haul/Fill
A
20cy/truck
$7.94/ton
Total $158.80
1
Q
Gravel
Base Tons
A
$23/ton 20cy/truck 1.5tons/cy 30tons/truck Total $690.00
2
Q
Sewer Trench Dig
A
$10.50/ft
3
Q
Water Trench Dig
A
$5.00/ft
4
Q
Electric Utility Trench Dig
A
$7.00/ft
5
Q
Footing Labor
A
$4.50/ft
6
Q
Footing Material
A
$75.38/cuyd
7
Q
8” Block
A
$0.99/Block Material
$1.10/Block Labor
8
Q
Block Mortar
A
$7.50/bag
33 blocks per bag
9
Q
Garage Grade Beams
A
$250/beam
10
Q
Brick
A
$0.30/Brick material
$0.38/Brick labor
11
Q
Brick Mortar
A
$7.10/bag
125 bricks/bag
12
Q
Concrete Steps 1-6
A
$20/step labor
1/10th yd of concrete per step; $7.50/step
13
Q
Community Sidewalk
A
$1.00/soft
14
Q
Top Soil
A
$10.88/yd
20cy/truck
Total $217.60
15
Q
Sod
A
$2.60/yd
16
Q
Porch Handrails
A
Wood $27/ft
Iron $39.80/ft
17
Q
Sewer Grinder
A
$1,000