AUC 5 Flashcards
(87 cards)
A.I.R
3 F
R
Artist In Residence
Third Floor
Rear
Sign specifications established by DoB for Artists Residential Occupancy shall be:
Metal 8”x10”
2” Black letters on a White Background
7 feet Above sidewalk level
As Close As Possible to the MAIN ENTRANCE on the front wall outside of building
NEW BUILDING
When the working deck reaches a height of _____ or greater above the ground in a building for which a standpipe is required:
75 feet
a Permanent or Temporary standpipe system shall be kept in a state of readiness at all times for use by fire-fighting personnel.
No standpipe shall be considere to be in a state of readiness unless it is:
PAINTED RED
Construction on New Building:
The standpipe system shall serve all floors:
Where the PERMANENT STAIRS are required
Where is the standpipe riser capped in a building under going demo?
Capped Above the Outlet ON THE FLOOR IMMEDIATELY BELOW the floor being demolished.
Ex. Demo 30 - capped above 29th floor outlet
Standpipe Pressurized Alarm Systems:
New Buildings higher than 75 feet-
Temporary and Permanent dry standpipes must have an air-pressurized alarm
Prior Notification for scheduled work: contractors must
notify Fire Department before any planned alarm deactivation
Fire Dept hose connections shall be kept free from obstruction and shall be marked by a metal sign reading “Standpipe Connection” and:
by a RED LIGHT at Night
Standpipes may be used for a purpose other than to supply water for firefighting operations, like supplying water or compressed air for construction or demo ops:
provided At Least ONE standpipe riser is maintained at all times for firefighting ops
All Exposed standpipes and sprinkler piping must be painted:
RED
exception - Branch piping
Dedicated standpipe valve handles must be painted:
RED
Combination standpipe valve handles must be painted:
YELLOW
Dedicated sprinkler valve handles must be painted:
GREEN
A metal sign must be present at the siamese connection for the sprinkler system reading “SPRINKLER SIAMESE CONNECTION” with;
a RED LIGHT over the sign; MUST BE LIT AT NIGHT
Sprinkler System Requirements:
The red paint shall be maintained during:
ANY alteration operation
When demolition starts, the sprinkler risers shall be capped:
immediately below the floor being demolished
During the course of construction of a new building, or in spaces being added to an existing building, at least one permanent stair shall be brought to within:
a distance of 40 feet OR 4 Floors below the Working Deck at all times
In all other locations where permanent stairs will be required, a temporary or permanent stair shall be brought:
to within a distance of 40 feet or 4 floors below the working deck at all times
Whenever construction or demolition work reaches a height greater than ______ at least one elevator kept in readiness at all times for fire department use.
75 feet
The maximum distance between the highest accessible floor from a temporary elevator or hoist and the working deck of the building under construction or demolition:
shall be no more than 75 feet OR 7 floors
What is the working deck in
- Concrete construction:
- Steel Construction:
- Floor being formed
2. floor where metal decking and steel components are being placed BEFORE CONCRETE IS POURED
Open fires shall be constantly attended until the fire is extinguished. A minimum of:
one portable fire extinguisher or garden hose connected to an Approved water supply, shall be available for immediate use.
If devices similar to Open Fires (like patio fireplace, solid-fuel burning portable heaters etc) are found by Fire officials, they should:
Order the use of these devices DISCONTINUED IMMEDIATELY
No further action required at this time