Bk 29: Ventilation Techniques Flashcards

(42 cards)

1
Q

If heat, smoke, and fire gases are not released they will accumulate at the highest point of the structure and begin to bank down and spread laterally. This process is known as _________.

A

Mushrooming

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

When operating on a LIGHTWEIGHT roof the ventilation team SHALL _______ conduct ventilation operations directly ______ the fire.

A

Never

over

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

There are basically only TWO types of ventilation holes:

  1. __________
  2. _________
A
  1. Heat Hole (offensive)

2. Strip Ventilation (defensive)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

A Heat Hole will reduce the possibility of __________ and _________ and will slow down the horizontal spread of fire.

A

Backdraft

Flashover

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

A Strip Ventilation should be placed _____ ______ of the fire. The Strip should extend the ________ ________ of the building creating firebreak.

A

well ahead

entire width

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Strip Ventilation must be done in conjunction with a _____ ______.

A

Heat Hole

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Which cut provides the LARGEST hole possible with the MINIMUM amount of cuts?

A

Center Rafter Cut

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Diaphragm Nailing:

Plywood sheather is installed so that the 8 ft. dimension of the plywood crosses the rafters and the 4 ft. dimension __________ the rafters. The sheets are then ___________ like a brick wall.

A

parallels

staggered

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Metal clips used to hold the butted ends of plywood together are called?

A

H clips

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

H clips are common on what type of roof?

A

Pitched Roofs

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

For Roof Ventilation a MINIMUM of how many ladders should be thrown?

A

Two ladders

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

When LOUVERING, once all cuts are complete, use a rubbish hook and push down on the _____ side and pull on the _____ side.

A

near

far

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

NAILING BLOCKs will usually be found every ____ ft.

A

4 ft.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

PLUG CUTs are used to determine the Sheathing ____ and ________ of the Roof Composition.

A

type

thickness

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

What are the THREE materials used for Floor and Roof Decking?

A
  1. Plywood
  2. Chipboard
  3. OSB
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

This cut is used to facilitated the removal of multiple layers of roofing material.

A

Score Cut

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

This cut is used on a Panelized Roof when you are performing a cutting technique knowns as Louver of a Purlin.

18
Q

SKYLIGHTS on Commerical Buildings will be placed over what areas?

A

Manufacturing Areas

19
Q

Smoke Indicator Holes should be placed along the path of access or egress every ____ yards.

20
Q

A long handled Rubbish Hook is recommended over a Pick Head Axe as sounding tool because of its ________ and ______.

A

Weight and Reach

21
Q

A Turbine ventilator is about _____% more effective when the Turbine is spinning.

22
Q

What THREE materials can Vent Pipes be constructed out of?

A

ABS Plastic
Steel Pipe
Cast Iron

23
Q

What will a 45-degree Inspection Cut tell you and what can it be used as once complete?

A

Rafter type and direction
Sheathing type
Thickness of the roof comp

Smoke Indicator Hole

24
Q

45 Degree Inspection Cut:

Roll over the rafter and continuer the cut for approx. ___ to ___ inches.

A

6 to 10 inches

25
This technique is used for cutting 1x4 or 1x6 solid, spaced or diagonal sheathed roofs.
Dicing
26
________ does not require the cutter to know the exact location of the rafters.
Dicing
27
DICING: | If needed, the FIRST cut performed is a _____ cut or _____ cut.
Score cut | Head cut
28
The length of the DICE cut is determined by what?
The Reach of the Tool
29
The Chain Saw Operator should cut a minimum of _____ Dice Cuts before the Pullers begin to remove sheathing.
3
30
DICING: | Always leave a minimum of ____ un-pulled section between the cutter and the puller.
1
31
In order to make a Center Rafter Louver you must first know the _______ ______ and _________ _________.
Rafter Type | Rafter Direction
32
Center Rafter Louver: | Make a Head Cut to located a minimum of ____ rafters.
3
33
Center Rafter Louver: | The Head Cut is started by cutting _______ from your ladder to locate your first outside rafter.
away
34
Center Rafter Louver: | Make a Parallel Cut approx. ___ to ___ inches inside the third inside rafter then louver the section.
2 to 3 inches
35
Center Rafter Louver: | Make the Bottom Cut ________ your ladder.
towards
36
Center Rafter Louver AGAINST CONTRUCTION: | Make your Parallel Cut approx. ___ ft. long
3 1/2 ft.
37
What are the three "OFFENSIVE" Panelized Roof Cutting techniques?
1. Drop 2. Pull Back 3. Offensive Louver
38
What are the two "DEFENSIVE" Panelized Roof Cutting techniques?
1. Louver off a LAM Beam | 2. Louver off a Purlin
39
Panelized Cutting Techniques: | Cut ___ to ____ inches inside of the Purlins to avoid hitting metal hangers.
4 to 6 in.
40
Louver off a LAM Beam: While standing on a Lam Beam, reach out approx. ___ ft, and make your first cut ________ to the rafts from Purlin to Purlin.
3 1/2 ft. parallel
41
Louver off a LAM Beam: | Because of work area limitations, the Cutter and the Puller should _______ tools before louvering each section.
exchange
42
Louver off a Purlin: | ______ cut over rafters from Lam Beam to Lam Beam.
Skim cut