Block 1 Flashcards

(45 cards)

1
Q

What is the #1 condition of employment?

A

SAFETY

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Baroid Service Quality Triangle

A

NPT/COPQ
Customer Dissatisfaction
Process compliance
Personal Accountability

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

1 Root cause for HSE & SQ Incidents

A

Not FOLLOWING THE PROCESS

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Baroid Value Proposition

A

Engineering Fluids Solutions Customized to Maximize Wellbore Value

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

How often is a Tier 1 inspection?

A

Daily / Weekly

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

How often is a Tier 2 inspection?

A

Monthly (HSE & SQ)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

How often is a Tier 3 Inspection

A

Quarterly

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

MOC Process (4 steps)

A
  1. Document Change
  2. Risk Assessment
  3. Approve Action Plan
  4. Execute and communicate changes
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

MOC examples

A
  1. Deviation from the process
  2. Change to approved DOS
  3. Change in equipment, personnel that may negatively impact operations
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

KPI

A

Key Performance Indicators

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

What are the 4 control points

A
  1. Approved DOS
  2. Verified Demand Plan
  3. Supply Execution
  4. Job Reporting
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Control point definition

A

Provides assurance that the combined previous activities results meet the objectives

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

LOLER

A

Lifting Operation and Lifting Equipment Regulations

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What are the Baroid Mainstays

A
  1. Business Acquisition
  2. Technical Process
  3. Black Book
  4. System Rationalization
  5. People
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Barasolve TIAT requests

A
  1. Rig survey or audit
  2. Engineering support for installation
  3. Equipment layout support
  4. Tender install / tender drawings
  5. Support for product modifications
  6. Review of design
  7. Solids control efficiency audits
  8. Subsurface monitoring
  9. Subsurface modeling
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Regular types of TIATS

A
  1. Level 1 or 2 installation
  2. Level 3 installation
  3. Level 4 demobilization
  4. Problem resolution
  5. General barasolve engineers support services
  6. Critical First Well
  7. High Priority Well
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

RPC

A

Risk Priority Code

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

What are the Hierarchy of Controls?
(5)

A
  1. Elimination
  2. Substitution
  3. Engineering
  4. Administrative
  5. PPE
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q

What are the Halliburton Critical Focus Areas?

A
  1. Well barriers
  2. Hydrocarbons to surface
  3. Pressure control
  4. Well proximity
  5. Radiation and explosives
20
Q

What are the 9 Life Rules?

A
  1. Working at heights
  2. Energy Isolation
  3. Driving
  4. Work Authorization
  5. Hot work
  6. Mechanical lifting
  7. Line of fire
  8. Confined space
  9. Bypassing safety controls

BELCHS

21
Q

Level 2 incidents criteria

A

> 24 hrs of NPT or > 50K and less than $200K COPQ

22
Q

SIN (Significant Incidents)

A

NPT> 48 hrs or COPQ > $200K

23
Q

Where do you enter NPT on computer?

24
Q

What are the Baroid control points?

A
  1. Approved DOS
  2. Verified Approval
  3. Confirmed supply execution
  4. Completed Job reporting
25
What are the 5 steps of BAP? (Business Acquisition Process)
1. Identify 2. Pursuit 3. Tender 4. Negotiate 5. Execute
26
What is criteria for a CFW? (Critical First Well)
1. New technology in the area 2. New customer 3. New country 4. New sub-PSL 5. CAPEX over 2MM
27
What are the 3 steps of the people process?
1. Hire 2. Develop 3. Retain
28
Distinctive Service Quality (6 parts)
1. Leadership and commitment 2. Improvement of HMS process 3. Training and competency 4. Improve technology and processes 5. Communicate and escalate risk 6. Audit and communication
29
What does IEM stand for?
Internal Equipment Maintenance
30
What does MBI stand for?
Maintenance Business Intelligence
31
What does SAP stand for?
System Application Products
32
What does DOS stand for?
Design of Service
33
What does BOD stand for
Basis of Design
34
What are the 3 R’s
Reduce, reuse, repurpose
35
What does AMI stand for?
Asset Management Integration “Control the movement of equipment globally”
36
Define Expense
A one time cost at the time of purchase
37
What are the 5 steps of the Technical process?
1. Identify the challenge 2. Solution Creation 3. Critical First Well 4. Problem Resolution 5. Present The Value
38
High Priority well criteria
1. Productivity 2. Strategic 3. Challenging scope of work 4. Offset problems 5. Nominated HPM
39
What are the 3 steps to the black book process?
1. Operations Program 2. Operations Execution 3. Knowledge capture
40
What does BAP stand for?
Business Acquisition Process (How we win work)
41
What does FAT stand for?
Factory Acceptance Testing (Assurance that equipment has been inspected and integrity tested
42
Risks associated with mob / demob
1. Safety issues 2. Improper permits / certifications 3. Wrong equipment / materials 4. Non - authorized personnel 5. Delivery delay
43
What is a Rig Survey?
Finds out the availability of space
44
what is a CSS?
Customer satisfaction survey
45
Characters of good safety attitude
Focus, time, discipline, responsibility, risk