Duties and responsibilities of the BDS
Crew safety, and supervising the deck during an evolution while keeping the coxswain up to date on the evolution
Deck check
Energize David battery, test davit. Prepare deck with equipment needed. Assign positions, Gar and safety brief.
Who do you notify once deck check and GAR are complete?
Coxswain
WLL of all padeyes
250 lbs, 500 lbs stbd aft
WLL of davit
500 LBS
Weight of 5th class fast water can
215 lbs
Weight of a 5th class fast water nun
210 lbs
How many feet in a shot
90’
How much does 30’ of 1/2” chain weigh
60 lbs
Weight of a shot of 1/2” chain
180 lbs
Chafe measurement on 1/2” chain
16/32”
Minimum chafe on 1/2” chain
11/32”
Tool used to measure chafe
Calipers
Config from buoy to dor mor
Buoy - 5/8” shackle - swivel - 1/2” chain - 5/8” shackle - 3/4” shackle - DOR-MOR.
What size DOR-MOR is used most frequently
200 lbs
Rock island DOR-MOR weight
360 Lbs
Why leave bottom door in during evolutions
Safety and stability, District and OIC SOP
Max weight while on trailer
1,000 lbs
Max weight underway
1,500 lbs
Wire rope size and material
1/4” of Stainless steel
Lay of wire rope
Right hand lay
What discrepancies are you looking for on wire rope
Corrosion
Reduction of diameter
Six or more broke wire in one lay length
Three or more broken wires in one strand lay length
Kinks, crushing, bird nesting
What are you looking for when inspecting any type of hook
Flexion, measure saddle and throat
Minimum number of wraps on davit
3 wraps