When locking out a cooled down steam boiler
Select one:
a. close the water column and gauge glass valves, and lock them.
b. close the non-return valve drain, and lock it.
c. open the drum vent, and lock or tag it.
d. open the continuous blowdown valve and tag it.
c. open the drum vent, and lock or tag it.
When a combustion air opening is equipped with dampers, the dampers must be
Select one:
a. interlocked with the burner, and fully open before starting the boiler.
b. interlocked with the burner, and fully closed before starting the boiler.
c. manually closed, to prevent cold air from entering the boiler room
d. partially open, so the burner is not supplied with too much air on start-up.
a. interlocked with the burner, and fully open before starting the boiler.
Which of the following may cause water hammer in steam lines?
Select one:
a. opening steam valves slowly.
b. opening the steam trap bypass valves.
c. having too many condensate drains open.
d. missing or damaged pipe insulation.
d. missing or damaged pipe insulation.
R4B04-03-03-07 Failure to \_\_\_\_\_ the furnace thoroughly before light-up can cause a furnace explosion. Select one: a. preheat b. soot-blow c. cool d. purge
d. purge
Which of the following is NOT done when preparing a steam boiler feedwater system?
Select one:
a. Confirm that the boiler water level is within range.
b. Verify that the boiler feedwater pumps are in service.
c. Open the feedwater control bypass valve.
d. Place the feedwater pre-treatment equipment in service.
c. Open the feedwater control bypass valve.
In the case of a single boiler steam heating system, ASME VI advises operators to warm up heating boilers and their steam piping
Select one:
a. quickly.
b. simultaneously.
c. alternately.
d. sequentially.
b. simultaneously.
For a wet layup, what is the recommended boiler water sodium sulfite residual?
Select one:
a. 40 ppm
b. 10 ppm
c. 200 ppm
d. 50 to 80 ppm
c. 200 ppm
One way to keep oxygen out of the boiler water system is to:
Select one:
a. Increase the continuous blowdown to remove water with high dissolved oxygen concentration.
b. Keep make-up water to a minimum.
c. Keep the drum vent closed when the boiler is not in operation.
d. Control the boiler water pH.
b. Keep make-up water to a minimum.
A boiler furnace pre-purge:
Select one:
a. happens after the ignition transformer is energized.
b. can occur even if the boiler has a low water condition.
c. happens only when the draft fans are at low speed.
d. must last a specific amount of time.
d. must last a specific amount of time.
Who can remove the supervisory lock from the lock box?
Select one:
a. The plant Workplace Safety and Health committee member.
b. The last contractor working on the boiler.
c. Only the qualified operator who initially performed the lockout.
d. The chief engineer, shift engineer, or qualified person delegated by the chief engineer
d. The chief engineer, shift engineer, or qualified person delegated by the chief engineer.
A boiler pressure explosion is NOT caused by: Select one: a. Scale and sludge build-up b. Overheating c. Insufficient combustion air d. Thermal shock
c. Insufficient combustion air
A boiler pressure explosion:
Select one:
a. Could be the result of water in the fuel oil
b. Could be the result of inadequate ignition
c. May be caused by a low water condition
d. Could result from a defective flame scanner
c. May be caused by a low water condition
How often should operator rounds be performed?
Select one:
a. 1 to 3 times per shift
b. once a week
c. every hour
d. every day
a. 1 to 3 times per shift
While warming up and cutting-in a hot water heating boiler with a hot system, which of the following is true?
Select one:
a. Keep the stop valves in the supply and return lines to the boiler closed during warm-up.
b. While warming up, the boiler must be on “high fire” or “automatic.”
c. Close the valves connecting the expansion tank to the on-line boilers, and open the valve that connects the cold boiler to the expansion tank.
d. Make sure the burner shuts off before the safety valve opens.
a. Keep the stop valves in the supply and return lines to the boiler closed during warm-up.
The purpose of a boiler boil out is to:
Select one:
a. remove grease and oil from the heat transfer surfaces.
b. determine the level at which the low water cut-off functions.
c. dry out the refractory.
d. clean the fireside surfaces.
a. remove grease and oil from the heat transfer surfaces.
To confirm a hot water heating system is full,
Select one:
a. the altitude shown on the tridicator gauge must exceed the pressure indication.
b. the expansion tank level must be at 1/2 a glass.
c. the system pressure must be the same at every elevation.
d. the pressure shown on the tridicator gauge must exceed the altitude indication.
d. the pressure shown on the tridicator gauge must exceed the altitude indication.
To help operators keep track of what step they are at in a procedure, the ___________ method is often used.
Select one:
a. Buddy
b. Call-in
c. Simplified Startup
d. Circle/Slash
d. Circle/Slash
When warming up a steam boiler, open the boiler drum vent to
Select one:
a. keep a vacuum from forming in the drum, if the burner trips off.
b. permit the release of corrosive dissolved gases, such as oxygen and carbon dioxide, from the boiler water.
c. ensure a flow of steam through the superheater banks.
d. prevent over-pressurization of the boiler during start-up.
b. permit the release of corrosive dissolved gases, such as oxygen and carbon dioxide, from the boiler water.
Which of the following is NOT an important reason to take plant readings?
Select one:
a. To compare current field conditions with the expected performance of the equipment.
b. To identify operating trends.
c. To diagnose problems with equipment or processes.
d. To keep operators from becoming complacent.
d. To keep operators from becoming complacent.
“SOP” stands for
Select one:
a. Simplified Operating Procedure
b. Standard Operating Procedure
c. Simplified Operating Practices
d. Special Operating Procedure
b. Standard Operating Procedure
CSD-1 recommends that flame rods and scanners be replaced
Select one:
a. monthly
b. annually
c. after 5000 hours of operation
d. before problems occur.
b. annually
In the event of a power failure, which of the following will likely require a manual restart when power is restored?
Select one:
a. air dryers
b. small condensate return pumps
c. unit heater fans
d. large air compressors
d. large air compressors
How often should the desiccant be checked during a dry layup?
Select one:
a. Semi-annually.
b. Annually.
c. Daily.
d. Bi-weekly to monthly.
d. Bi-weekly to monthly.
On a boiler fuel system that has a “double block and bleed” arrangement:
Select one:
a. The ”bleed” valve is a normally open solenoid valve.
b. The main SSOVs energize when the bleed valve de-energizes.
c. The main SSOVs open before the pre-purge occurs
d. The main SSOVs and the vent valves open at the same time.
a. The ”bleed” valve is a normally open solenoid valve.