Boiler Test Flashcards
(36 cards)
1 boiler horsepower =
10 square feet of heating surface
What license can work at any type of plant
Special
What license can operate low pressure steam or hot water (not steam engine/ turrbine)
Grade c
What license can operate a high pressure or low pressure Stam or hot water (not steam engines / turbines)
Grade B
What license can operate any plant including steam engines and turbines
Grade A
What license can take charge of a 50 horsepower plant
Special
What license can take charge of a 100 horsepower plant
2nd class
What license can take charge of a 500 horsepower plant
1st class
What license can take charge of an unlimited horsepower plant
Chief
What license can be a shift engineer for 100 horsepower plant
Special
What license can be a shift engineer for a 500 horsepower plant
2nd class
What license can be a shift engineer for unlimited horsepower plant
1st class and Chief
Who is meant to operate and take responsibility for the plant while on duty
Shift engineer
What is it, to be the main person in charge of the plant called
To Take charge
A.K.A. - the chief of the plant
How many years of experience is needed for 2nd class license B & C
1 year
How many years of experience is needed for 1st class license B & C
3 years
How many years of experience is needed for Chief license B & C
5 years, and 1 year as 1st class
Hw many year of experience is needed for 2nd class A license
1 Year of high pressure with turbine
How many years is needed for 1st Class A license
3 years of high pressure & 2 years of turbines
How many years is needed for Chief A license
5 years of high pressure, 2 years of turbines, and hold 1st Class A for 1 year
Licensing uses the total of all boilers horsepower that “are what” in your plant
Connected to the same header
How many types of boilers are there?
3
ASME stands for what
American society of mechanical engineers
What is required on a high pressure steam boiler
2 valves on the main steam line