Building Pathology Specific Questions Flashcards
Tell me about RICS Home Survey Standard
Designed to:
- Establish clear framework with minimum expectations
- Provide mandatory requirements
- Replace and harmonise previous publications
Tell me about limitations and scope of different types of surveys L3
Level 3
- Detailed visual inspection
- Concealed areas opened
- Services used in normal operation
- Describes the form of construction and materials
- Describes condition and assessment of defects
- Indication of cost
Tell me about the different types of survey you are aware of.
- Mortgage valuation
- Home Survey standard L1,2,3
- HMO
Tell me about a typical defect you are aware of relating to typical buildings in your locality.
- Book end effect
- Differential movement to bay due to clay soil and shallow foundations
- Re-roofing in concrete tiles
Differential movement example - What is the likely cause of movement to bay and the impact upon value/your advice?
- Differential movement to bay due to clay soil and shallow foundations
- Likely due to shallow foundations depth
- Recommended SER
- Sale fell though due to this and other defects
Tell me about a building defect you are likely to encounter in a typical building survey.
- Bridging DPC
Tell me about how you collect, store and retrieve information for different purposes when carrying out property inspections.
- Ipad
- Formsfly
Why is it important to record accurate information during a building inspection?
- Used for report writing
- In case of more info needed
- In case of complaint
- So other professionals can respond if you are away/ ill
Wentworth Road CR0 Talk me through your identification of Japanese Knotweed.
- Shield shaped leaves
- arranged in a zig zag pattern.
- Main stem
- Flowers
- Proximity of a train line
Wentworth Road CR0 Why did you recommend a retention?
- Lender policy
- Retention held for the cost of the works
- To ensure the works were completed
Wentworth Road CR0 Talk me through your assessment of the treatment plan.
- detailed the extent of the outbreak and treatment recommended.
- reputable company who is preferably an accredited member of a recognised trade association such as the PCA (Property Care Association)
- an insurance backed 5 year warranty* against re-appearance of the plant is included
Falcon Road CR0 Why was the sprayed foam insulation a concern?
- Can cause roof timbers to rot due to lack of ventilation
Falcon Road CR0 What was the lender policy on sprayed foam insulation?
- Fully encapsulated timbers not acceptable
Falcon Road CR0 Talk me through your report regarding the sprayed foam insulation.
- I reported that the property was not acceptable due to the presence of spray foam insulation as per the lender policy.
Albert Road SE25 How was the flashing inadequate?
- Allowed water ingress
- Formed from adhesive rather being cut into the wall
Albert Road SE25 How did you follow the trail?
- Observed the elements internally
Albert Road SE25 Why did you apply a condition rating 3?
- INVESTIGATION - Further investigation required
- URGENTLY - Defect needed to be repaired urgently
- VALUE - Significant impact on value
Hawthorne Avenue CR4 How did the flooding affect structural integrity?
- Washed away the fines from the soil
- Caused erosion and softening of the soil
- Reduced the load bearing capacity of the soil
Hawthorne Avenue CR4 Did you consider the BRE Digest in relation to the cracking? If so, talk me through this.
- Took a series of measurements – although unable to measure the widest points
- Assessed the cracking fell into category 3 due to cracking 3-5mm width
- Therefore assessed there may be serious structural movement
- Potential impact to the structural stability and weathertightness
Hawthorne Avenue CR4 What are the implications of category 3?
- Potential impact to the structural stability and weathertightness
Hawthorne Avenue CR4 Talk me through your review of the structural engineer’s report.
- Assessed their qualifications
- Assessed their recommendations
Hawthorne Avenue CR4 How was the risk of ongoing flooding addressed?
- The leak to pipework had been previously remedied when the current occupiers moved in
- Applicant stated that repair works had been undertaken to the bathroom and ceiling of the reception
- Bathroom and reception (partially) had been decorated and renovated at point of inspection
Advised in report to confirm property was readably insurable
Hawthorne Avenue CR4 Talk me through your current and post works valuation
- Current val based on the current condition of the property (average order with an allowance made for the costs of the works to bring the property up to a habitable condition as well as a cost for inconvenience)
- Post works val based on the assumption the works would be completed to a good standard – extended size
Hawthorne Avenue CR4 Talk me through your advice regarding the suitability of the property for mortgage lending.
- I advised the property was acceptable for lending due to movement being addressed
- Advised current and post works val