The total Labor and Material cost for a project was estimated to be $250,000 and 55% was estimated for Materials. What would be the additional profit on the job if the actual Labor costs were only 85% of the estimated labor costs.

A

$250,000 x 45% = $112,500 (Estimated Labor cost)
$112,500 x 85% = $95,625 (Actual Labor Cost)
$112,500 - $95,625 = $16,875 additional profit

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

The Florida Building code May not be used to prevent the

A

Florida building code , sect. 102.1.1, pg 1.2

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

According to Walker’s. when stripping and storing topsoil for reuse, any area cleared of trees and stumps will have a loss factor of ______

A

Walkers pg 155

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

In the state of Florida, which of the following activities requires a license?

A

Contract manual pg 2-6 (Toc, Chap 2 “Licensing Exemptions)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

The first offense by a person falsely presenting themselves as a licensed contractor is a _____?

A

Contract manual pc 2-13

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

According to the Florida Building Code, in a threshold building, the contractors contractual or statutory obligations are not relived _____?

A

Florida building code sect. 110.8.1 pg 1.16

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

According to the AIA documents, the burden of proof of the merit of any proposed substitution is upon the ____?

A

AIA A701, art. 3.4

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

A physician’s office falls into which Use and Occupancy Classification?

A

FBC- Building sect 304.1, pg 3.2

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

If the Subcontractor fails ___ after receipt of written notice from the Contractor to correct defective work, the Contractor may make good such deficiencies?

A

AIA A401, art 3.4

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

The architect will ___ after receipt of a Contractor’s Application for Payment, either issue to the Owner a Certificate of Payment or notify the Contractor and Owner in writing of the Architects reasons for withholding certification.

A

AIA A201, art. 9.4.2 ( Index: “Certificate for payment”)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

According to the Davis-Bacon Act, The ____ May withhold contract payments to cover alleged under-payments of wages?

A

CM, pg. 5-33 (TOC, Chap.5: “Davis-Bacon Act, Penalties and Sanctions”)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

A contract between a general contractor and a subcontractor is a ____ contract?

A

CM, pg 9-21

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

If #2 framing lumber is selling for $.65 per board-foot, what is the cost of 820 lineal feet of 2x4, 686 lineal feet of 2x6 and 234 lineal feet of 2x8?

A

Board-foot formula: Walkers pg 846

(2x4x820) / 12 = 546.67 bd ft.
(2x6x686) / 12 = 686 bd ft.
(2x8x234) / 12= 312 bd ft.

546.67 + 686 + 312 = 1544.67 bd ft x $.65 = $1004.03

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

According to the Fl building code, required Building inspections include which of the following?

A. Framing, Roofing, Mechanical, Electrical and Plumbing
B. Foundation, Framing, Roofing, Electrical and Plumbing
C. Foundation, Framing, Sheathing, Roofing and Final
D. Foundation, Framing, Roofing and Swimming Pool

A

FBC- Building, sect 110.3, pgs. 1.14 and 15. ( Index: “Inspections, Required”)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Temporary toilets and drinking water are typically covered by the ____ of a contract?

A

CM, pgs. 10-10 and 11 (TOC, Chap.5: Davis-Bacon Act, Penalties and Sanctions”)