Case Study Flashcards

(47 cards)

1
Q

You mention PCI document. Who prepared this and what was included?

A

I assisted the PD in preparing the document, with the PDs review and sign off before issue.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What is code 4 lead flashing?

A

Thickness of 1.80 mm and Weight of 20.4 kg/m2

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What determines coding?

A

Thickness and kg/m2

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Can you tell me about the construction type of the building?

A
  • Solid masonry construction, cobimation of flemish brickwork and portland stone
  • Masard roof with natural slate to pitches and a flat topped roof section with a sinle-ply membrane
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

How have you determined traditional brickwork masonry over steel frame with masonry cladding?

A
  • Thickness more than 250mm
  • Brick bond - which was flemish in this case.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

How are the Portland stone architecural features secured into the main structure of the building?

A
  • Direct attachment
  • Strongback systems
  • Mortar and Pointing
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Did you carry out an Asbestos survey, and what were the results?

A
  • Yes, there was no asbestos detected.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What regulation would you refer to when concerning asbestos?

A
  • Control of Asbestos Regulation 2012 (CAR 2012).
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Did you aquire any guarantees during the project?

A
  • Yes, FLEXITEC 2020 MATERIALS provided a guarantee for 20 years covering an area of 122m2.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

How was the waterproof system applied?

A
  • Dark grey texture applied coating over light greay liquid coating on 18mm board on 150mm
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

What assessment was required for the roof waterproofing?

A

European Technical Assessment for applied roof waterproofing kits provided by a member of EOTA.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

What report was aquired for the roof waterproofing?

A

BRE Global Classification Report

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

What is the BRE Global Classification Report?

A

Classification report for roof/roof coverings exposed to external fire in accordance with EN 13501-5: 2005 + A1: 2009

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What was the BRE Global Classification Report used for?

A

Defines the classification assigned to roof/roof covering Flexitec 2020 on 9mm Masterboard calcium silicate base in accordance with EN 13501-5: 2005 + A1: 2009

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

What system was used for waterproofing?

A
  • Felxitec 2020.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

What marking signifies a decleration of performance?

A

C E

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

What is the buildup of the Flexitec System?

A
  • 18mm OSB Board
  • Black flexible plastic VCL (0.23 mm)
  • 150mm off white insulation foam with silver foil
  • Dark grey textured liquid applied coating over light grey liquid coating
  • Mechanically fixed with screws.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

How would you intall the Flexitec System?

A
  • Prepared roof surface
  • Flexitec Primer
  • 1st coat Flexitec Resin with 225g/m2 Restec Fibreglass CSM reinforement
  • 2nd Coat Flexitec Resin
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q

What fire rating does the Flexitec System acheive?

A
  • Fire Reating: BRoof (t4) highest rating a flat roof system can acheive
20
Q

What roof finishes can a Flexitec System be applied to?

A

Most, including felt, asphalt, concrete, GRP, PVC single ply.

21
Q

What are the benefits of using the Flexitec System?

A
  • Can be installed on most coverings
  • Seamless
  • Installed on any shape and sized roof
  • Waterproof
  • Rapid installation
  • Drying time of up to 60 minutes
  • Suitible application for tempratures ranging from 1 degrees to 30 degrees.
22
Q

What is ISO?

A
  • International Organisation for Standardisaiton
23
Q

What ISO does the Fleixitec system satisfy?

A
  • ISO 9001: Quality Management Systems
  • ISO 14001: Environmental Management Systems
24
Q

What was the process of stitch-cracking?

A
  • The instlallation of ‘HeliBar’ which is a stainless steel reinforing bar used for masonry repair.
25
Did you have a CCTV Drainage Survey and what was the outcome?
- No major defects, however, a small hole was identified 0.5m down the drain.
26
What type of lime was used for masonry repiars?
Saint-Astier
27
What was the lime/sand ratio for restoring stonework?
1 lime : 2 sand (0/3mm)
28
What was used for the ballustrade/downpipe paint finishes?
Dulux Trade Metalshield Primer followed by 2 coats of Dulux Trade Metalshield Gloss.
29
How can you tell whether a scaffolding company is reliable?
National Access & Scaffolding Confederation (NASC) Approved
30
Who deisgned the scaffolding?
A Civil Engineer.
31
Could you talk me through how you specified repairs to stone features?
- Included provisional quanities - Case Studies - Stone Mason advice - Coservation officer advice
32
Was conservation consent was required for the actual remedial works?
As the property is not listed, it did not require consent.
33
Can you talk me through how you would deal with an interim valuation application?
- Interim Valuation Date (IVD): This is the date upon which the valuation of the work done is made. - Due Date: This is 7 days after the Interim Valuation Date (IVD). - Final Date for Payment: This is 14 days after the Due Date, or 21 days after the IVD. - Payment Notice from Employer: The Employer must issue a payment notice within 5 days of the Due Date. - Pay Less Notice from Employer: The Employer must issue a Pay Less Notice no later than 5 days before the Final Date for Payment.
34
Can you talk me through how you went about the practical completion process?
- Carry out inspection - Confirm Final Account - Provide Certificate of PC - Release 2.5% retention - Compile H&S File and provide to LL
35
Was there any paperwork that the contractor needed to provide to you as part of your determination as to whether PC had been completed?
Operations and Maintenance Manuals
36
What British Standard would you refer to for lead flashings?
BS EN 12588 (1999)
37
What is code 3 lead flashing?
Thickness of 1.32 mm and Weight of 15 kg/m2
38
What should service charges be?
Not for profit, not for loss.
39
What are the risks associated with removing chimney breasts?
- Expensive and time consuming - Requre building control approval - Input of structural engineer - Does the chimeny form part of a party wall?
40
Why remove chimney breast?
- Chimneys cause damp issues trough uncapped flues - Poor pointing/lack of flaunching - Carbon staining due to water reacting with carbon staining within the chimney.
41
How to avoid defecs without removing?
- Introduce ventilation
42
Is planning required for the removal of chimney breasts?
- Typically no, as it comes under permitted developments
43
What measurement must a drainage outlet size be, and what would you refer to?
- 90mm - BS EN 12056-3
44
Why is lime used?
- Good water vapor permeability - Flexible under stress - Cement is brittle and prone to cracking
45
What is the lime ratio for the mortar?
1 (lime) : 3 (sand/sharp)
46
What would you refer to when specifying stone repairs?
- Conservation Basics (English Heritage) - BRE 420 : Selecting and Testing Natural Stones - BRE 21 : Weathering, Preservation and Maintanance of natural stone masonry.
47
How would you test stone repairs?
- Visual inspection Whether it's real? - Easily scratched - Acid test looking for fizzing, which indicates Calcium Carbonate.