Chapter 4 Flashcards

1
Q

CIDS designation for following:

  1. Bowstring Truss
  2. CFR Hold
  3. Major Alteration
  4. Pre-Incident Guide
  5. Rehabilitated
  6. Mega Hi Rise
A
  1. Bowstring Truss: (BWSTRG)
  2. CFR Hold: (CFRH)
  3. Major Alteration: (MJALT)
  4. Pre-Incident Guideline: (PG)
  5. Rehabilitated: (REHAB)
  6. Mega Hi Rise (MEGA)
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Immediate Entry CIDS (Imminently Hazardous Condition): accomplished with the approval of __
A. Administrative Battalion Chief
B. Administrative Division Chief
C. Command Chief
D. No Chief Approval needed for imminently hazardous condition

A

B. Administrative Division Chief (4.3.3)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Choose the incorrect for Immediate Entry CIDS:
A. Administrative Unit Officer shall use eCIDS application to enter proposed immediate CIDS (Faxed paper copies of CD-201 are no longer accepted)
B. After submitting CIDS, notify Admin BC via email to inform the Chief of the pending immediate CIDS
C. Admin BC shall enter eCIDS to view and approve. If approved, BC shall notify Admin DC via phone to inform of immediate CIDS
D. An immediate CIDS entry will always appear at the top of a units pending list and be in bold print

A

B. After submitting the CIDS entry, notify the Admin BC by PHONE to inform the Chief of the pending immediate CIDS (4.3.3)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

List the CIDS process for a single building with a multi-number address range posted. ex 100-112 Williams Ave

A

Enter a CIDS message for the first and last posted address numbers of such range. The combined number 100-112 should also be included in the “Transmitted Data” portion of each CIDS entry (ex- “AKA 100-112 Williams Ave”). Only applies when an address range is posted on the building.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

List the CIDS process for Interconnected/Attached Buildings and Building Complexes- Separate Addresses Posted on Buildings ex- 20-40 Pitkin Ave but is 3 separate buildings each with a separate address number posted (20, 30, 40 Pitkin Ave)

A

A separate CIDS entry must be entered for each address. Separate CIDS entry req’d for 20, 30, 40 with “Transmitted Data” portion of each CIDS entry indicating the number of bldgs complex. Ex- “3 Bldg Complex or 3 Interconnected Bldgs.”

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

T/F If a bldg has a single address posted, but has multiple addresses listed in FD BIS or FD Map App, prepare CIDS for each address listed in application. List other addresses as “AKA” in “Transmitted Data” portion of each CIDS entry

A

False Off shall determine if add’l CIDS entries are req’d for any other applicable addresses or AKA’s associated w/bldg. It is NOT the intent of this program to create multiple duplicate CIDS entries for additional unused addresses associated with a building.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

“Immediate Entry” eCIDS: After viewing pending eCIDS BC should
A. Approve entry and then phone Admin DC to inform the chief of pending immediate CIDS
B. Approve entry, and then phone BISP Unit to inform
C. Approve entry, then phone FDOC to inform
D. Approve the entry. No further action needed

A

A

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Immediate Entry eCIDS correct for BC
A: Enter eCIDS app to view the pending immediate CIDS. If approved, you shall notify the admin DC by phone to inform him of the pending immediate CIDS
B: Enter the eCIDS app to view the pending immediate CIDS. If approved, you shall notify the BISP unit by phone to inform them of the pending immediate CIDS
C: Enter the eCIDS application to view the pending immediate CIDS. If approved, you shall notify FDOC by phone to inform them of the pending immediate CIDS
D: Immediately call admin DC by phone and have DC enter immediate CIDS into Starfire via the green screen

A

A Upon notification, the administrative DC shall enter the eCIDS application to view the pending immediate CIDS. If approved, the DC shall notify FDOC by phone

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

CIDS incorrect
A: When interconnected/attached bldgs and bldg complexes have a separate house number posted on each building, a CIDS entry for the first building in the complex is only required since the complex has only one building identification number (BIN)
B: When a single bldg, regardless of size, has a single address posted, and only one address is found during research, prepare one CIDS entry, even if fronts on more than one street
C: When a single bldg has multiple addresses found during research, but only has a single address number posted on the bldg, prepare a CIDS entry for the posted address. Officer shall determine if additional CIDS entries are required for any other applicable addresses or AKA’s associated with the building
D: If a building or facility has a unique and distinctly recognizable name, a separate CIDS entry shall be entered for its Special Name/Place in addition to its address or addresses

A

A Comm ch 4 page 4-5
When interconnected/attached buildings and building complexes have a separate house number posted on each building, a separate CIDS entry must be entered for each address. Example: Complex identified during research as 20-40 Pitkin Ave. but is 3 separate buildings each with a separate address number posted (20,30,40 Pitkin Ave.), a separate CIDS entry is required for 20, 30, and 40 with the “Transmitted Data” portion of each CIDS entry indicating the number of buildings in the complex

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

100-104 Williams Ave: After researching, it is determined that there are 3 official addresses for the bldg (100, 102, 104), but only 100 and 104 are used by occupants. How many CIDS entered
A. One for “100 Williams Ave”
B. One for “100-104 Williams Ave”
C. Two: 1 for “100 Williams Ave and 1 for 104 Williams Ave
D. Three: 1 for “100”, 1 for “102”, and 1 for “104” Williams Ave

A

C

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

A Chief reviewing eCIDS submission can
A. Approve eCIDS
B. Disapprove eCIDS
C. Revise and approve eCIDS, but then must enter a reason for revision

A

A B C

How well did you know this?
1
Not at all
2
3
4
5
Perfectly