Water is stored to meet peak demand and to allow production facilities to operate at ______ rates
Uniform
Stored water can meet sudden demands such as fire, absorb pressure surges, provide detention /contact time for _____, and allow for expansion of the distribution system
Chlorination
Pressure from an elevated tank is caused by the height of the column of water in ______
Pounds per square inch
The water column must be at least ____feet higher than the highest service connection to be considered elevated storage
80
Roof vents must be screened with ______ mesh or finer corrosion -resistant material
16
All roof hatches must be ______
Locked
Ground water supply systems serving more than 50 connections must have a ground (total) storage capacity of 200 gallons per connection and elevated storage capacity of 100 gallons per connection or pressure tank capacity of 20 gallons per connection. ( true or false )
True
A _______, internal, and documented inspection of all storage tanks is required
Yearly
Potable water storage tank inspection results must be maintained at least ______ year
5
All community systems must post at each production and storage site a sign stating the name ________
Emergency
An intruder - resistant fence with lovable gates must enclose the storage site (true or false )
True
The system must be maintain a minimum pressure of _____psi under normal conditions and at least _____psi during emergencies
35 / 20
Pipe and fittings must not contain more than _____% lead, or solder and flux containing more than ____% lead
8 / 0.2
A ______valve is the most common isolating valve in the distribution system
Gate
Dead end mains must be provided with ________
Flush valves
Service tap components usually include a tapping saddle , corporation stop, service line tubing, curb stop and________
Meter
When trenching, the spoil bank should be more than ______feet from the excavation
2
Trenches or ditches ___feet or deeper should be shored
5
TCEQ requires at least 1 Bac - T sample for each 1,000 feet of new main ( true or false)
True
For a new main , hold a chlorine dose of _____mg/l or more for ______hours
25 / 24
If a repaired main must be returned to service quickly, dose it with _____mg/l for 30 minutes
500
Dead end mains must be flushed at least _______
Monthly
Corrosion results in tuberculation , a mineral build up usually of oxidized _________
Iron
Methods of fighting corrosion include coatings , PH adjustment , and cathodic protection ( true or false)
True