DAMAGE CONTROL Flashcards
(21 cards)
Important spaces
Paint locker 32 stores IC/Gyro Sewage Fwd AUX Engine room JP5 Pump Room Aft Steering
Paint locker frame
4-16-0-K
32 stores frame
4-32-0-A
IC/ Gyro frame
3-72-0-C
Sewage frame
4-84-0-Q
FWD AUX frame
3-96-0-E
Engine Room frame
4-108-0-E
JP5 pump room frame
4-156-0-E
Aft steering
4-188-0-E
Type spaces
A- Storage (32 stores) C- Ship and fire control operating spaces that are normally manned (CIC, Pilot house,IC gyro) E- machinery spaces normally manned F- oil tanks J- JP-5 tanks K- Stowage of chemicals, HazMat L- living Quarters M- ammunition’s
How many hose stations
22
2 50ft hoses
Location of fire pumps
Lower starboard engine room
JP5
Locations of fire pump pressure gauges
08
Laundry Magazines Main control Fire pumps Bridge Main p-way AFFF PANEL LOG OFFICE
AFFF
Aqueous film forming foam
6%afff to 94% water
Mixture of AFFF
94% water
6% AFFF
Range of AFFF
GPM
PSI
50-250 GPM
PSI RANGE 80-130
AFFF Containers
5 gallons each
8 gallons at a station
How long does AFFF storage container take to get empty
45-60 seconds
How many gallons in AFFF storage tank
100
When does alarm go off for low AFFF alarm
10% remaining
AFFF SPACES
6 spaces
Eng room reel JP5 sprinkler over head FWD AUX overhead AFT steering bilge Flight deck PRT&STB Eng room sprinklers