DC Distribution System Flashcards
(5 cards)
Describe the mission time of class 1E batteries
Designed to maintain loads (maximum discharge) for 4 hours.
What trips are available to DC breakers
Overcurrent ONLY
List the major loads on 1D1
- Auto Turbine Tester cabinet
- Turbine Stress Evaluator
- Seal Steam Controller
- EHC Controller
- Extended Turbine Protection Cabinet
- Vibration Monitoring
- Electrical Generator Protection Cabinet
- Hydraulic Control Equipment Rack
‘Turbine & Generator protections, seal steam controls, EHC Controller’
Describe the power supplies to, and major loads, on 1D2
DC Bus 1D2 is supplied by BC1D2 (fed from 1EB2-1) and BC1D4 (fed from 1EB4-1), or BC1D24 fed from 1B1-1.
Major loads include:
1. Electrical Trip controls for the Main Feed Pumps
2. Main Turbine DC L/O pump
3. Main Feed Pump DC L/O pump
4. Main Generator Emergency Seal Oil pump
Describe the power supplies to, and major loads, on 1D3
DC Bus 1D3 is supplied by BC1D3-1 and BC1D3-2
Major loads include:
1. RCP control power
2. IV1C5
3. IV1C6