Definitions- Length of shell-to-bottom weld that if repaired is considered either a major repair or alteration
> 0”
Linings- Typically anchor profile of steel surface required for the installation of a tank bottom lining
1.5- 4.0 mils
Welds- Maximum undercut of a vertical weld & nozzle weld
1/64”
Welds- Maximum undercut of horizontal weld
1/32”
Welds- Maximum diameter of a surface porosity cluster
1/32”
Weld Qualification- Max allowed discontinuity in a Bend Test
1/8”
Nameplates- Minimum size of nameplate letters
5/32”
Bottoms- Minimum external projection of bottom plate on an existing tank (from toe of shell-to-bottom FW)
3/8”
Reconstruction - Max amount of peaking allowed in vert welds
1/2”
Shell Calcs- When calculating tmin for shell LTA, minimum distance away from a weld where “E” is always 1.0
> 1” or 2t
Shell Patch- minimum overlap of shell lap-patch used to cover a hole (edge of hole to edge of patch)
1”
NDE- When performing a PT examination, minimum distance to clean beyond the area to be examined
1”
NDE- When performing a MT examination, minimum distance to clean beyond the area to be examined
1”
Reconstruction- Maximum amount of banding allowed in a horizontal weld
1”
Bottoms- Minimum overlap required for single-lwelded lap joints
1”
Bottoms- Minimum external projection of bottom plate on a new tank
2”
Vacuum Box- Minimum overlap of previously tested surfaces when using a vacuum box
2”
Bottom Patch- Minimum overlap of bottom lap=patch used to cover corroded area (Edge of corrosion to edge of patch)
2”
Bottom Patch- Minimum distance bottom lap=patch fillet weld to the nearest existing bottom weld
2”
Shell Patch- Minimum radius of a shell lap-patch
2”
Reconstruction- If reusing bottom plates, min distance to cut from existing bottom welds (if plates are not deseamed)
2”
Reconstruction- If reusing roof plates, min distance to cut from existing roof welds (if plates are not deseamed)
2”
Shell Pitting- Maximum allowed vertical length of pits on a tank shell
2” in 8” line
bottom pitting- maximum allowed length of pits in the critical zone that can be repaired by weld-buildup
2” in 8” arc