Electrical Power Flashcards

1
Q

AC system is ___V at ___Hz

A

115V at 400Hz

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

The AC system is supplied power from what sources?

A

2 engine driven Integrated Drive Generators (IDGs)
1 APU Generator
1 RAT Generator
1 AC external power input

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

DC system is __V

A

24V

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

The DC system is supplied power from what sources?

A

2 Nickel cadmium batteries
1 DC external power input
3 Transformer Rectifier Units (TRUs) convert AC to DC
1 Inverter converts DC to AC

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What converts variable engine speed into constant generator supply?

A

Constant Speed Drive (CSD). One per engine

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Each IDG generates constant frequency __ power at __kVA, ___V, ___Hz, _-phase

A

AC power at 40kVA, 115V, 400Hz, 3-phase

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

(T/F) The IDG oil system is liquid-cooled

A

False. Air cooled

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

If the amber light next to the IDG switch illuminates what does this mean?

A

The IDG OIL message is on EICAS and a manual disconnection of the IDG is required

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

(T/F) The APU generator needs to be manually turned on when the APU is to be used for AC power.

A

False. Pushing the APU GEN button disconnects the APU GEN

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

BATT DISCHARGING means what on EICAS?

A

The batteries are discharging, the generators aren’t working and the RAT should be deployed once all other options are checked

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

The only inverter on the aircraft is located where?

A

The FWD E-bay

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

BATT __ provides power for APU start

A

BATT 2

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

BATT 1 is located ____

BATT 2 is located ____

A

BATT 1 is located in the FWD E-bay

BATT 2 is located in the AFT E-bay

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

(T/F) During an APU start the battery contactor for battery 2 will automatically open, stopping supply to the other systems.

A

True

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

There are __ Integrated control centers (ICCs) installed on the aircraft. The L & R are located ____. The Emergency ICC is located ___. The Auxiliary ICC is located ____.

A

There are 4 Integrated control centers (ICCs) installed on the aircraft. The L & R are located Middle E-bay. The Emergency ICC is located FWD E-bay. The Auxiliary ICC is located AFT E-bay.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

If a thermal circuit breaker trips, what EICAS message will be displayed and what color will it be?

Where can I find information on which circuit breaker tripped?

Can I reset these CB in air?

A

REMOTE CB TRIP
Blue

MCDU CB page

No. CB reset can only be done on the ground by mx

17
Q

The Left Integrated Control Center (LICC) provides power distribution and protection for:

A

AC BUS 1 / DC BUS 1
AC / DC ground service busses
Line replaceable modules (TRU1, GCU1, External power modules)
Several thermal CB’s

18
Q

The Right Integrated Control Center (RICC) provides power distribution and protection for:

A

AC BUS 2
DC BUS 2
DC ESS BUS 2
Line replaceable modules (TRU2, GCU2, AGCU, External power modules)

19
Q

The Emergency Integrated Control Center (EICC) provides power distribution and protection for:

A
AC ESS BUS
DC ESS BUS 1
DC ESS BUS 3
AC STBY BUS
HOT BATT BUS 1
Line replaceable modules (ESS TRU, several thermal CBs)
20
Q

The Auxiliary Integrated Control Center (AICC) provides power distribution and protection for:

A

APU START BUS
HOT BATT BUS 2
Several thermal CBs

21
Q

There are ___ SPDAs installed and they’re located ____ and ____.

A

2
FWD E-bay
Mid E-bay

22
Q

(T/F) Remote CBs tripped in the SPDAs can be reset in the MCDU in the cockpit.

23
Q

Electrical system fault logic provides power in the following order:

A

Onside IDG
APU
GPU
Opposite IDG

24
Q

(T/F) One AC source can supply the entire electrical system

25
(T/F) The DC ground port can only be used for APU start
True
26
The AC GPU port is located ____. The DC GPU port is located ____.
AC is on the lower left hand side of the aircraft just below the cockpit DC is located at the lower left side of the aircraft aft of the rear passenger door
27
GPU CONNECTED EICAS message means what?
You have either an AC or DC GPU connected and you released the parking brake
28
(T/F) A cabin depressurization will automatically disconnect the cockpit PC plugs and can be reset by pushing the PC button twice
True