Engineering Admin Flashcards

(29 cards)

0
Q

Who all works for EOOW?

A

Oil king

EPCC

PACCO

DCC

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
1
Q

What is EOSS?

A

Provides safe, technically accurate, and standardized operational and casualty control procedures tailored to the ship.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

List 5 main pubs for Engineering

A

***EOSS - engineering operational sequencing system

***EOP - engineering operational procedures

***EOCC - engineering operational casualty control

***EDORM - engineering department organization and regulation manual

***JFMM - joint fleet maintenance manual

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Who works for EDO?

A

Oil king

CCS watch

Fire Marshall

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

When is single hearing protection required?

A

> 84 db

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

When is double hearing protection required?

A

> 104 db

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Working on de-energized equipment…actions required?

A

1) isolate the system; tag it out

2) verify it’s de-energized w/ multimeter

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What is items required before working on energized equipment?

A

1) CO’s permission

2) tech pub, PPE, safety observer (CPR qualified)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What permissions are required from CHENG?

A

1) Deletions/modifications of dept PMS manuals
2) PMS scheduling
3) locally prepared procedures where no EOSS coverage

4) Final closeout authority for:
*all gas turbine inlet plenums
*all tanks/voids
*MRG sumps and access covers
*LSB sumps and access covers
*strut waterborne bearings (shipyard)
*rudder stock bearings (shipyard)
*Main/auxiliary or WHB steam separator, water drums and
fire boxes

5) Equipment light off
* prepare Light Off Orders for CO’s approval
* changing plant status or placing major equipment OOC

6) ETT drills
7) draft, boat, fuel, oil, water reports

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

When is RMD set?

A

1) entering and leaving port
2) Restricted waters
3) going alongside
4) UNREP
5) Close formation maneuvering
6) GQ
7) Safety of ship

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Pipe color : FM

A

Red

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Pipe color : AFFF

A

Striped red/green

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Pipe color : F/O

A

yellow

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Pipe color : JP-5

A

Purple

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Pipe color : LP air

A

Tan

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Pipe color : HP air

16
Q

Pipe color : Hydraulic

17
Q

Pipe color : L/O

A

Striped Yellow/black

18
Q

Pipe color : Potable

19
Q

Pipe color : Sea Water

20
Q

Pipe color : Chill water

A

Light blue/dark green

21
Q

Pipe color : Sewage

22
Q

Pipe color : Refrigerants

23
Q

Pipe color : Steam

24
Pipe color : Oily Waste
Black
25
Pipe color : Halon
Striped gray/white
26
Purpose of the thrust bearing?
Absorbs thrust and transfers it to the hull
27
Purpose of bearings?
Support and maintain alignment
28
Purpose of the MRG?
Allow prime mover and propeller to operate at efficient speeds