EO 1 Block 1 Flashcards
Which ONE of the following combinations describes the TWO purposes of the 345 KV distribution system?
- Provide a normal power source for the Circulating Water Pumps and the
Reactor Coolant Pump’s at 100 % power. - Distribute power generated at the station for commercial use.
- Provide an emergency source of power to essential 4160 VAC buses.
- Provide a source of alternate power to station loads at 100 % power.
A. 1, 3
B. 1, 4
C. 2, 3
D. 2, 4
D
ONE purpose of the 345 KV Distribution System is to provide input to the grid for financial income for First Energy.
Which ONE of the following is another purpose of the system at 100 % power?
A. Provide a source of EMERGENCY power to station DC loads.
B. Provide a source of EMERGENCY power to emergency lighting panels.
C. Provide a source of ALTERNATE power to station AC loads.
D. Provide a source of ALTERNATE power to the security diesel.
C
Which ONE of the following combinations describes TWO purposes of the 345 KV distribution system?
- Distribute power generated at the station for commercial use.
- Provide an emergency source of power to essential 4160 VAC buses.
- Provide offsite power via the startup transformers to the 13.8 KV buses during startup and shutdown.
- Provide the normal power source for the Circulating Water Pumps and the Reactor Coolant Pumps at 100% power.
A. 1 and 2
B. 1 and 3
C. 1 and 4
D. 2 and 3
B
Which one of the following substations tie directly to Davis-Besse’s 345 kV System switchyard?
A. Acme
B. Beaver Valley
C. Lindsey
D. Ohio Edison
D
The Plant is being Shut Down per DB-OP-06902 Power Operations.
Current Reactor Power is 28% and stable at Low Level Limits.
The following breakers open:
ACB 34560
ACB 34564
What is the source of power to Startup Transformer 01?
A. Lemoyne Line
B. Bayshore Line
C. Main Generator
D. Ohio Edison Line
A
During refueling outages, the Main Generator output breakers (ACB 34560 & 34561) are normally _____ and the Main Generator air break
switch (ABS 34620) is normally _______ .
A. open to prevent powering the Main Generator; open to prevent powering the Main Generator
B. closed to allow ring bus continuity; open to prevent powering the Main Generator
C. open to prevent powering the Main Generator; closed to allow Main Generator relaying to function
D. closed to allow ring bus continuity; closed to allow Main Generator relaying to function
B
During EXTENDED shutdown operations with the main generator shutdown, which ONE of the following represents the condition of the generator output breakers, ACB 34560 and ACB 34561?
A. OPEN to prevent motoring the generator.
B. OPEN to ensure ring bus continuity.
C. CLOSED to ensure protective relay availability.
D. CLOSED to ensure ring bus continuity.
D
During extended SHUTDOWN operations with the main generator shutdown, ACBs’ 34560 and 34561 are normally __________, ABS 34620 is normally __________, and Ground Switch 34645 is normally __________.
A. OPEN; OPEN; CLOSED
B. OPEN; CLOSED; OPEN
C. CLOSED; OPEN; CLOSED
D. CLOSED; CLOSED; CLOSED
C
During normal 100 % power operations, ACB’s 34560 and 34561 are normally __________, ABS 34620 is normally __________, Ground Switch 34645 is normally __________.
A. CLOSED; CLOSED; CLOSED
B. CLOSED; OPEN; OPEN
C. OPEN; CLOSED; CLOSED
D. CLOSED; CLOSED; OPEN
D
Which of the following combinations are all substations with DIRECT tie-in to Davis-Besse’s 345 KV switchyard?
- Oak Harbor Feeder
- Bayshore
- Eastlake
- Lemoyne
- Ohio Edison-Beaver Substation
A. 1, 2, 4
B. 1, 3, 4
C. 2, 4, 5
D. 3, 4, 5
C
What action would be required if the only source of power after a reactor/turbine trip caused by inclement weather is by backfeeding through the Main Transformer?
A. Disconnects at the Isophase system would have to be removed locally to prevent motoring the main generator when ACB34561 and ACB34560 are closed.
B. Ground switch 34645 must be close to prevent shock danger to plant personnel prior to closing ACB 34560 and ACB 34561
C. Main Generator must be taken off the turning gear and the rotor must be locked in order to prevent shaft from rotating when breakers ACB34560 and ACB34560 are closed.
D. Contact the dispatcher to have the Isophase disconnects open remotely prior to closing ACB34560 and ACB34561.
A
Generator output breakers ACB 34560 and 34561 can be OPENED and can be CLOSED .
A. by the Load Dispatcher and, from the Control Room by the Load Dispatcher and from the Control Room
B. by the Load Dispatcher and, from the Control Room from the Control Room ONLY
C. from the Control Room ONLY by the Load Dispatcher and, from the Control Room
D. from the Control Room ONLY, from the Control Room ONLY
B
Which ONE of the following identifies the purpose of SF6
gas in an Air Circuit Breaker?
A. Provides a backup supply to the operating air system.
B. Provides moisture absorption to keep operating air system dry.
C. Quenches the arc during OPENING and CLOSING operations.
D. Provides insulation at the phase interrupter and phase current transformers.
D
Which ONE of the following indicates the location from which ALL air break switches and motor operated disconnects can be OPENED AND CLOSED?
A. Control Room
B. Relay House
C. System Dispatchers Office
D. Switchyard, at the components
D
When CLOSING a 345 KV Air Circuit Breaker from the Control Room.
The synchroscope should be at the 12 o’clock position, rotating __________ and the synchronizing lamps should be ___________.
A. SLOW in the FAST direction; OFF
B. SLOW in the SLOW direction; ON
C. SLOW in the SLOW direction; OFF
D. SLOW in the FAST direction; ON
A
Which ONE of the following describes the purpose of a RECLOSER switch in the relay house?
A. Allows for AUTOMATIC reclosure of an ACB.
B. Used to relay TRIP signals between breakers.
C. Prevents RECLOSURE of designated breakers during fault conditions.
D. Used to RECLOSE motor-operated disconnects in the event of a fault.
A
When in the AUTO position, the RECLOSER switch in the relay house allows for AUTOMATIC reclosure of an ACB ____________________ following ____________________.
A. IMMEDIATELY, a TEMPORARY line fault.
B. after a set time delay, only a DIFFERENTIAL fault.
C. IMMEDIATELY, a PERMANENT line fault.
D. after a set time delay, ANY line fault.
D
The Relay House switches that permit AUTOMATIC TRIP signals to be received from the Remote Line Relays or to be transmitted to the Remote Line Relays if required to TRIP the breaker are ___________ switches.
A. reclosure
B. carrier
C. transfer trip
D. control
C
The Relay House switches that permit LINE-FAULT-TRIP blocking signals to be transmitted or received via coupling capacitor potential devices are __________ switches.
A. reclosure
B. carrier
C. transfer-trip
D. syncroscope
B
Which ONE of the following conditions will result in annunciator 1-1-E, SU XFMR 01 LOCKOUT?
A. LOSS of DC annunciator power to Startup Transformer 01 cabinet.
B. LOW oil flow in the #1 oil cooler group for Startup Transformer 01.
C. Sudden pressure RISE inside Startup Transformer 01.
D. LOW Nitrogen pressure in Startup Transformer 01 Inertaire cylinder.
C
Determine which ONE of the following control room annunciators will alarm if power is lost to MCC E22A.
A. SU XFMR 01 TRBL
B. SU XFMR 02 TRBL
C. XFMR CE1-2 TRBL
D. BUS E1 TRBL
B
The following plant conditions exist:
* Reactor power is 70 % power
* Annunciator 1-1-F, AUX XFMER 11 LOCKOUT just alarmed coincident with numerous others.
* An EO reports that a fork lift has tipped over and its load has slammed into Auxiliary Transformer 11.
The expected plant response is for ACB 34560 & 34561 to be <>
and for the 13.8 Kv buses to be powered from <> .
A. open; Aux. 11 Xfmer with a load rejection in progress.
B. closed; the Startup Xfmers with the plant stabilizing at 70 % power.
C. closed; Aux. 11 Xfmer with a reactor/turbine trip present
D. open; Startup Xfmers with a reactor/turbine trip present
B
The following plant conditions exist:
- 100% Normal Power Operation
- A Bus Reserve Source Selector Switch is in the 01 position.
- A Lockout has occurred on the “J” Bus.
- The plant has tripped due to Main Transformer Fault.
Which ONE of the following describes the status of “A” Bus?
A. “A” Bus is De-energized.
B. “A” Bus is powered from the 01 Transformer.
C. “A” Bus is powered from the 02 Transformer.
D. “A” Bus is powered from the Aux 11 Transformer.
A
The following plant conditions exist:
- Plant at 100% power
- Normal 100% electrical lineup
A lockout on the J Bus occurs.
Which ONE of the following describes the status of A Bus?
A. A Bus is de-energized.
B. A Bus is powered from 02 Startup Transformer.
C. A Bus is powered form 01 Startup Transformer.
D. A Bus is powered from the Auxiliary 11 transformer.
D